ML18022A883

From kanterella
Jump to navigation Jump to search
Forwards Change 3 to Rev 2 to Plant Emergency Procedures (Pep) PEP-100,Change 3 to Rev 5 to PEP-101,including One Oversize Drawing,Rev 0 to PEP-374 & Rev 18 to PLP-201, Emergency Plan, Page 2-9a
ML18022A883
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/08/1992
From: Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18010A492 List:
References
CON-NRC-771 NUDOCS 9201130265
Download: ML18022A883 (17)


Text

ACCELERATED DI TIUBUTION DEMONS~TION SYSTEM P

0a PP REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9201130265 DOC.DATE: 92/01/08 NOTARIZED:

NO DOCKET 40 FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME AUTHOR AFFILIATION RICHEY,R.B.

Carolina Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (D'ocument Control Desk)

SUBJECT:

Forwards Change 3 to Rev 2 to Plant Emergency Procedures I

(PEP)

PEP-100,Change 3 to Rev 5 to PEP-101,including one oversize drawing,Rev 0 to PEP-374

& Rev 18 to PLP-201, D

"Emergency Plan,"

Page 2-9a.

DISTRIBUTION CODE:

A045D COPIES RECEIVED:LTR I

ENCL P SIZE:

+

TITLE: OR Submittal:

Emergency Preparedness

Plans, Imp ement'g Procedures, C

NOTES:Application for permit.renewal filed.

05000400 A

RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: AEOD/DOA/IRB NUDOCS-ABSTRACT EXTERNAL: NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME MOZAFARI,B.

NRR/DREP PEPB9D BE~

0 NSIC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISI'RIBUTION LIPID FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 8

ENCL 8

D D

(

I k

n C:

1 f

CHILL Carolina Power & Light Company P.O. Box 165 ~ New Hiil, N.C. 27562 R. B. RICHEY Vice President Harris Nuctear Project JAN 8

19m.

Letter Number:

HO-910251 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, D.C.

20555 NRC-771 CAROLINA POWER AND LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400 LICENSE NO. NPF-63 Gentlemen:

In accordance with

10CFR50, Appendix E,

Carolina Power 6 Light Company hereby transmits one copy each of recent revisions to the Shearon Harris Nuclear Power Plant emergency procedures.

A list of the revisions to the plant emergency procedures is also enclosed (Attachment 1).

Very t:ruly yours, R.

B. Richey Vice President Harris Nuclear Project MGW:kjc Enclosure cc:

Mr. S.

D. Ebneter (NRC-RII) (w/two copies of procedures)

Ms. B. L. Mozafari (NRC)

Mr. J.

E. Tedrow (NRC)

MEM/H0-910251.0/1/OS1 9201130265 920108 PDR 'DOCK 05000400 F

PDR

Li t

ATTACHMENT 1 CAROLINA POWER AND LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT - UNIT 1 REVISIONS TO PLANT EMERGENCY PROCEDURES PROCEDURE NUMBER TITLE DATE PEP-100 Rev.

2 Change No.

3 Emergency Action Levels Users Guide 12/15/91 PEP-101, Rev.

5 Change No.

3 Emergency Classification and Initial Emergency Actions 12/15/91 PEP-374, Rev.

0 Radiological Controls for, the Emergency Operations Facility 12/09/91 PLP-201, Rev.

18 Page 2-9a only Emergency Plan (Note:

Page was inadvertently omitted from PLP-201, Rev.

18 transmitted August 2, 1990.

Please insert page accordingly.)

07/27/90 MEM/H0-910251.0/2/Osl

4

(1) 2)

(3 eason or t e ange che ADVANCE CEANGE POEN~

~ //g/g~

Vol ~ 'art 5

Proc. No.

F'E F'00 Rev.

2, Change 0

Procedure Title c foh.

cue.

5 sers u>'d8.

(4) scrxptxon o t e ange J

c nr'

'on.

re

'on u

r

.0 s

ee, (5)

Nuehe of Procedure pages Attached (6)

Verify at the Technical Specifications Procedur Cross Reference, FSAR Coamitme Cross Reference and ANSI 18 '

Commit nt Cross Reference (AP-005) ve been reviewed and all discrepanc'es found have been resolved.

C arne an xgnature gate OCT 1

6 199p If a revision is equired to the Techn cal Specification Procedure Cross Reference, verify hat a Task Change equest Form (PLP-103) has been submitted for Mana ent Approval ~-

Date gA egu atory omp nance ote:

reparer may i

not applicable (7)

Submitted for Approval:

rxgxnator s

arne Date OCT 1 "'99p (8)

CPH Safety Review is.'irc o

ke.

One requi and attached/not required gate OCT 1 6 199p roce ure oor (9)

Recommended for A roval:

r s arne n

xgnature Qualified Tec cal Reviewer Quali:fied T chnical R viewer Quality ssurance Ori nator's Supervisor nx,t

(

) Final'Approval - Approved By:

rve ~

c.7C&'AGRIC, arne xt e Remarks.'rne an C,

Gf'n.

1gna arne an xgnat re arne an xgnature signature am an x na e

C lZ. Gf'bgo arne an xgnature OCT 16 1ggp

~ate

/8 /~

d4

~ate mvE Oy ~8

~>yg

/o-/<Ho ate (Form AP-007-4-8) on>

890 HNP

~.$

, ~

OS4 List of Effective Pa es

~Pa e

.%e'Ii (-'

wp."eJ'meepfwl e, f ~~ma. I ep tfwc*';rreee'=.;~eee; e~+v~%~~ggwn~ve 'ree~+

g ~i~~v~I~ee''e".>r eeeee r

.". ~

) ii~e".- r Ie "'-tire w v "i"-+++'z~~>>~ 'R e~e

i II I I r

l r

r,

~

Revision NI pi

,Ir e)

IV, II,i 1-2 34-17

17a, 17b
17c, 17d 2

AC-2/1, AC-2/2 2

AC-2/1 AC-2/2 e e.lf

<>tt

">> w

- ~ i

~

~ ADVANCE CHANGE FORM i

~

~ a-p-(2)

Procedure Title a s5 I

'c<<R Pert Rev.~

Chacga d

n/

r c

S (3) eason or t e ange v fe,c ac r

Iq/cc effcf P-Clf'n.a'&AS L

I LV AItecIR ppqf. n orccclq

"<<)'4 F ytqRr, "

c) r "

7h

<<efr c sre/yrwd r/

/'/I recJ "c'csgh'~pen

~

C)$

n r t E

L

)(cth.I>>cue

" Ccrfec e

)s t c t

rhftt>IA.

urt(

~

lost orq s'Iqt/Id& cr (8)

Neater of Procedure pages Attached R

(6)

Verify that the Technical Specifications Procedure Cross Reference, FSAR Coamitment Cross Reference and ANSI 18.7 Commitment Cross Reference (AP-005) have been reviewed and all discrepancies found have been resolved.

(4) escrxptzon o t e ange

~-

/yd

/,e wh/c/ sA' "C'cnI'rtos'~

AC//'cn

'o>>q<<III ton. Cether't(V<<'

for ) IO tvtlnq flttds 5 t Ie Frster s

EIAL

<<z)(ch.'R<<I<<.'<< 'A<<sn s'gtf'~kar r/7 Date 2-//-1/

arne an xgnature If a revision is required to the Technical Specification Procedure Cross Reference, verify that a Task Change Request Form (PLP-103) has been submitted for Management Approval..

QA egu atory omp rance ote:

reparer may applicable 1

not Date 2,-II-c( I (7)

Submitted for Approval:

T N

'Icckel" rxgxnator s

arne (8)

CP&i Safety Review is:

(Circ(a Cce) requ'red d attached/uot required

~

ocker roce ure oor xn r s arne an (9)

Recommended for Approval:

signature Date 2-//-q l Qualified Technical Reviewer Quali.fied Technical Reviewer Qua1.ity Assurance 8 Originator's Supervisor Fl fs F'rokecfl'on.

nest M

t/oker.M

/3@c:M arne an C R. Gs'iso n arne an xgnature arne an xgnat 8ibs c.i

(

arne an agnature gA arne an xgnature 2-/ -//

ate gA

~ate

~pe,/

ply

~ate Remarks.'rne ate I G-w (10) Final'pproval Approved By.

s x natur EFFECT fVE FEB f j f9gf Z.-/2v/

~ate (Form AP-007-4-8) hav'n no r'~ acf done urI"e~</ Iv4 Jue.

Ho r I/e d Auntie ha lr'y Bo rnIpac o>>I Fife P>>orwcr>>'o>>p

>>I

~

I

I 4

OS4 t

l List of Effective Pa es

~Pa e

1, 2

4 - 8 10 Revision AC-5/1, AC-5/2 AC-5/1, AC-5/2 PEP-101 Rev.

5 Page 3 of 10

)) ~

l

. ~