ML19259A718
ML19259A718 | |
Person / Time | |
---|---|
Site: | Indian Point, FitzPatrick |
Issue date: | 12/28/1978 |
From: | Early P POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
To: | Macdonald C NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
References | |
IPO-180, NUDOCS 7901100185 | |
Download: ML19259A718 (1) | |
Similar Documents at Indian Point, FitzPatrick | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M1851999-10-19019 October 1999
[Table view]Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates JPN-99-035, Forwards Comments on Version 2 of Reactor Vessel Integrity Database for Plant.Table Listing Recommended Changes to Info in Rvid,Encl as Attachment 11999-10-15015 October 1999 Forwards Comments on Version 2 of Reactor Vessel Integrity Database for Plant.Table Listing Recommended Changes to Info in Rvid,Encl as Attachment 1 JPN-99-034, Forwards Proposed risk-informed ISI Program,Provided from NRC Review & Approval as Alternative to Current ASME Section XI Insp Requirements for Class 1 & 2 Piping1999-10-13013 October 1999 Forwards Proposed risk-informed ISI Program,Provided from NRC Review & Approval as Alternative to Current ASME Section XI Insp Requirements for Class 1 & 2 Piping JPN-99-033, Provides Response to Questions Contained in 990712,facsimile from NRC Re Ja FitzPatrick USI A-46 Program.Questions Were Also Discussed Between Members of Util & NRC Staff During Telcon1999-10-0808 October 1999 Provides Response to Questions Contained in 990712,facsimile from NRC Re Ja FitzPatrick USI A-46 Program.Questions Were Also Discussed Between Members of Util & NRC Staff During Telcon ML20217B3331999-10-0707 October 1999 Responds to 990825 Telephone Call Re Presense of Polychlorinated Biphenyl Wastes at Plant,Unit 1 JPN-99-030, Forwards Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases to Extend LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days1999-09-29029 September 1999 Forwards Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases to Extend LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days JPN-99-032, Forwards Info Re Potential Environ Effects of Alternatives to Proposed Expansion of FitzPatrick Spent Fuel Pool,In Response to NRC Project Manager Request1999-09-29029 September 1999 Forwards Info Re Potential Environ Effects of Alternatives to Proposed Expansion of FitzPatrick Spent Fuel Pool,In Response to NRC Project Manager Request ML20212F8341999-09-22022 September 1999 Forwards Insp Rept 50-333/99-07 on 990718-0828.No Violations Noted ML20212F4481999-09-17017 September 1999 Forwards NRC Form 536 Containing Currently Proposed Site Specific Operator Licensing Exam Schedule & Estimates of Number of Applicants for Generic Fundamentals Exams Through Cy 2003 JAFP-99-0262, Forwards Voluntary Response to Administrative Ltr 99-03, Re Preparation & Scheduling of Operator Licensing Exams. Completed NRC Form 536,containing Info Re Proposed Exam Preparation Schedule & Initial Operator License Exams,Encl1999-09-16016 September 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Re Preparation & Scheduling of Operator Licensing Exams. Completed NRC Form 536,containing Info Re Proposed Exam Preparation Schedule & Initial Operator License Exams,Encl ML20212F7051999-09-14014 September 1999 Forwards Rev 19 to Ipn,Units 1 & 2 Physical Security Plan. Plan Withheld,Per 10CFR2.790(d) & 73.21 ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics 05000333/LER-1998-015, Forwards LER 98-015-02 Re Logic Sys Functional Test Inadequacies,Per 10CFR50.73(A)(2)(i)(B).Rept Revised to Reflect Scheduled Completion Date for Corrective Action 3 of Jan 15, 2000 & Updates Status of Other C/As as Complete1999-09-0808 September 1999 Forwards LER 98-015-02 Re Logic Sys Functional Test Inadequacies,Per 10CFR50.73(A)(2)(i)(B).Rept Revised to Reflect Scheduled Completion Date for Corrective Action 3 of Jan 15, 2000 & Updates Status of Other C/As as Complete ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues JAFP-99-0258, Forwards Operator License Restriction Change for Tj Pelton, License SOP-10090-3.License Is Requested to Be Reissued with Restriction for Corrective Lenses.Encl Withheld1999-09-0808 September 1999 Forwards Operator License Restriction Change for Tj Pelton, License SOP-10090-3.License Is Requested to Be Reissued with Restriction for Corrective Lenses.Encl Withheld ML20211N0681999-09-0202 September 1999 Informs That Commission Requested Publication of Notice of Consideration of Issuance of Amend to Fol,Proposed NSHC Determination & Opportunity for Hearing. Amend Changes Senior Reactor License Requirement for Operations Manager JPN-99-028, Informs That Util Requires Extension from 990901 to 1015,to Complete Review of Rvid & Forward Comments to Nrc,Per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity1999-08-30030 August 1999 Informs That Util Requires Extension from 990901 to 1015,to Complete Review of Rvid & Forward Comments to Nrc,Per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity JAFP-99-0247, Forwards JAFNPP Effluent & Waste Disposal Semi-Annual Rept for 990101-0630, IAW Amend 93,App B,Section 7.3.C of Plant Ts.Format Used for Rept Is Outlined in App B of Reg Guide 1.21,Rev 1.Distribution Is IAW Reg Guide 10.1,Rev 41999-08-26026 August 1999 Forwards JAFNPP Effluent & Waste Disposal Semi-Annual Rept for 990101-0630, IAW Amend 93,App B,Section 7.3.C of Plant Ts.Format Used for Rept Is Outlined in App B of Reg Guide 1.21,Rev 1.Distribution Is IAW Reg Guide 10.1,Rev 4 ML20211H6291999-08-26026 August 1999 Forwards NPDES Discharge Monitoring Rept for July 1999 for Indian Point,Units 1,2 & 3. Rept of Noncompliance Is Attached for Noncompliance Which Occurred at Unit 3 JAFP-99-0245, Informs That Two Licensed Operators Have Returned to Site Upon Release for Normal Duties by Physician.R Korthas, License OP-11159,meets ANSI Std 3.4-1983 & R Sarkissian License SOP-10007-3,was Terminated in Mar 19991999-08-19019 August 1999 Informs That Two Licensed Operators Have Returned to Site Upon Release for Normal Duties by Physician.R Korthas, License OP-11159,meets ANSI Std 3.4-1983 & R Sarkissian License SOP-10007-3,was Terminated in Mar 1999 ML20211E1531999-08-18018 August 1999 Forwards Semi Annual fitness-for-duty Program Performance Data for 990101-990630,IAW 10CFR26.71(d) ML20211H6051999-08-18018 August 1999 Forwards Rev 8 to Security Force Training & Qualification Plan, for Indian Point 3 Nuclear Power Plant.Rev Facilitates Transition of Duty Weapons Carried by Security Force Members from Revolvers to Semiautomatic Pistols ML20210U2621999-08-12012 August 1999 Forwards Insp Rept 50-333/99-06 on 990601-0717.No Violations Noted ML20211A9241999-08-11011 August 1999 Informs That IPS Currently Estimates,That Approx Two Licensing Actions Will Be Submitted to NRC During Remainder of 1999 NRC Fiscal Yr & Approx Ten Will Be Submitted During 2000 NRC Fiscal Yr JPN-99-025, Forwards Relief Request 17 Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) for Reactor Pressure Vessel Circumferential Shell Weld Exams1999-08-0505 August 1999 Forwards Relief Request 17 Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) for Reactor Pressure Vessel Circumferential Shell Weld Exams JPN-99-026, Forwards Relief Requests 18 & 19 to Jaf ISI Program Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) & Relief from ASME Section XI Code Re Insp of RPV Vertical Shell & Shell to Flange Welds1999-08-0505 August 1999 Forwards Relief Requests 18 & 19 to Jaf ISI Program Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) & Relief from ASME Section XI Code Re Insp of RPV Vertical Shell & Shell to Flange Welds ML20216D9421999-07-28028 July 1999 Forwards Safety Evaluation Granting Requests for Relief from Requirements of ASME Code,Section XI for Second 10-year ISI Interval for James a FitzPatrick NPP ML20210M7251999-07-26026 July 1999 Forwards Projection of Ability to Pay Retrospective Premium Adjustment for Period of Aug 1999 to 000731, Which Demonstrates That Ceny Will Have Sufficient Cash Flow &/Or Cash Reserve Available Throughout Period to Pay Premium JAFP-99-0229, Forwards Three Sets of Corrected Summaries of Changes for Inclusion Into Security Plan for Ja FitzPatrick Nuclear Power Plant,Rev 19 & Security Contingency Plan,Rev 5.Encls Withheld Per 10CFR73.21 & 10CFR2.790)d)(1)1999-07-22022 July 1999 Forwards Three Sets of Corrected Summaries of Changes for Inclusion Into Security Plan for Ja FitzPatrick Nuclear Power Plant,Rev 19 & Security Contingency Plan,Rev 5.Encls Withheld Per 10CFR73.21 & 10CFR2.790)d)(1) JAFP-99-0228, Forwards Rept Re Changes & Errors in ECCS Evaluation Models, Per 10CFR50.46(a)(3)(ii) for Period from 980701-990630.No Commitments Contained in Submittal1999-07-21021 July 1999 Forwards Rept Re Changes & Errors in ECCS Evaluation Models, Per 10CFR50.46(a)(3)(ii) for Period from 980701-990630.No Commitments Contained in Submittal ML20210G8911999-07-20020 July 1999 Forwards Application for Amend to License DPR-5 for Proposed New TS 3.2.1.i,revising Senior Reactor License Requirement for Operations Manager ML20210A7001999-07-16016 July 1999 Forwards Request for Addl Info to Supplement Response Provided for GL 97-05, Steam Generator Tube Insp Techniques JAFP-99-0208, Provides Clarification of Info Re Proposed Its, & 0601.Table Reconciling Differences,Encl1999-07-14014 July 1999 Provides Clarification of Info Re Proposed Its, & 0601.Table Reconciling Differences,Encl ML20209D5511999-07-0606 July 1999 Informs That as Result of NRC Review of Licensee Response to GL 92-01,rev 1,suppl 1,staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210C9031999-06-30030 June 1999 Summarizes Impact of Changes & Errors in Methodology Used by GE to Demonstrate Compliance with ECCS Requirements of 10CFR50.46.Summary of Changes & Errors Provided in Attached Table ML20209B6611999-06-29029 June 1999 Returns Recently Submitted Renewal Applications,Nrc Form 398,for Three Reactor Operators,As They Are Not Completed Properly.List of Docket Numbers & Block Numbers That Contain Incorrect Info & Block Numbers Not Completed.Without Encls JPN-99-021, Forwards Application for Amend to License DPR-59,changing to Pressure Temp Limits.Pressure Temp Curves & Associated LCO & Bases Changes Included in Proposed Amend1999-06-22022 June 1999 Forwards Application for Amend to License DPR-59,changing to Pressure Temp Limits.Pressure Temp Curves & Associated LCO & Bases Changes Included in Proposed Amend JPN-99-020, Submits Response to RAI Re ISI Program Relief Requests for Second 10-yr Interval Closeout & Summary Rept,Per 990426 Telcon with Nrc.Info Provided to Clarify or Withdraw Individual Relief Requests Contained in Summary Rept1999-06-21021 June 1999 Submits Response to RAI Re ISI Program Relief Requests for Second 10-yr Interval Closeout & Summary Rept,Per 990426 Telcon with Nrc.Info Provided to Clarify or Withdraw Individual Relief Requests Contained in Summary Rept ML20196G2981999-06-18018 June 1999 Forwards Insp Rept 50-333/99-04 on 990412 to 0529.Violations Being Treated as non-cited Violations ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20196A6371999-06-15015 June 1999 Forwards Rev 19 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(d) & 73.21 JPN-99-019, Withdraws Recent Exemption Request Re 10CFR50,App R, Use of Core Spray to Achieve Safe Shutdown. Exemption Dealt with Use of Core Spray for Reactor Coolant Makeup to Achieve Safe Shutdown in One Fire Area at Plant1999-06-15015 June 1999 Withdraws Recent Exemption Request Re 10CFR50,App R, Use of Core Spray to Achieve Safe Shutdown. Exemption Dealt with Use of Core Spray for Reactor Coolant Makeup to Achieve Safe Shutdown in One Fire Area at Plant ML20196L1451999-06-0707 June 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Ss Bajwa Will Be Section Chief for Ja Fitzpatrick & Indian Point NPPs JPN-99-018, Forwards Revised Application,Previously Submitted,For Amend to Plant TS for Converting CTS to ITS Consistent with Improved Std TS (NUREG-1433,Rev 1)1999-06-0101 June 1999 Forwards Revised Application,Previously Submitted,For Amend to Plant TS for Converting CTS to ITS Consistent with Improved Std TS (NUREG-1433,Rev 1) ML20207D9191999-05-27027 May 1999 Informs That on 990521 NRC Staff Held Planning Meeting to Identify Insp Activities at Facility Over Next Six Months ML20207D1861999-05-27027 May 1999 Informs That Effective 990328,NRC Office of NRR Underwent Reorganization.Mt Masnik Section Chief for Indian Point Station,Unit 1.JL Minns Remains Primary Contact for All Routine Licensing & Administrative Matters.Chart Encl JAFP-99-0171, Forwards Revised Ja FitzPatrick Nuclear Power Plant 1999 FSAR Update. Update Also Includes Changes to Chapter 17, QA Program Which Described in Attachment 1.No Commitments Contained in Ltr1999-05-20020 May 1999 Forwards Revised Ja FitzPatrick Nuclear Power Plant 1999 FSAR Update. Update Also Includes Changes to Chapter 17, QA Program Which Described in Attachment 1.No Commitments Contained in Ltr JPN-99-016, Forwards Application for Amend to License DPR-59,requesting 14 Day AOT for EDG Sys.Commitment Made by Util,Encl1999-05-19019 May 1999 Forwards Application for Amend to License DPR-59,requesting 14 Day AOT for EDG Sys.Commitment Made by Util,Encl ML20207A6751999-05-17017 May 1999 Forwards RAI Re 960626 Submittal & Suppl Related to IPEEEs for Plant.Licensee Committed to Revise Plant Fire IPEEE to Reflect Issues Associated with EPRI Fire PRA Implementation Guide within 120 Days of Issues Resolution 1999-09-09 Category:INCOMING CORRESPONDENCE MONTHYEARJPN-99-035, Forwards Comments on Version 2 of Reactor Vessel Integrity Database for Plant.Table Listing Recommended Changes to Info in Rvid,Encl as Attachment 11999-10-15015 October 1999
[Table view]Forwards Comments on Version 2 of Reactor Vessel Integrity Database for Plant.Table Listing Recommended Changes to Info in Rvid,Encl as Attachment 1 JPN-99-034, Forwards Proposed risk-informed ISI Program,Provided from NRC Review & Approval as Alternative to Current ASME Section XI Insp Requirements for Class 1 & 2 Piping1999-10-13013 October 1999 Forwards Proposed risk-informed ISI Program,Provided from NRC Review & Approval as Alternative to Current ASME Section XI Insp Requirements for Class 1 & 2 Piping JPN-99-033, Provides Response to Questions Contained in 990712,facsimile from NRC Re Ja FitzPatrick USI A-46 Program.Questions Were Also Discussed Between Members of Util & NRC Staff During Telcon1999-10-0808 October 1999 Provides Response to Questions Contained in 990712,facsimile from NRC Re Ja FitzPatrick USI A-46 Program.Questions Were Also Discussed Between Members of Util & NRC Staff During Telcon JPN-99-032, Forwards Info Re Potential Environ Effects of Alternatives to Proposed Expansion of FitzPatrick Spent Fuel Pool,In Response to NRC Project Manager Request1999-09-29029 September 1999 Forwards Info Re Potential Environ Effects of Alternatives to Proposed Expansion of FitzPatrick Spent Fuel Pool,In Response to NRC Project Manager Request JPN-99-030, Forwards Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases to Extend LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days1999-09-29029 September 1999 Forwards Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases to Extend LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days ML20212F4481999-09-17017 September 1999 Forwards NRC Form 536 Containing Currently Proposed Site Specific Operator Licensing Exam Schedule & Estimates of Number of Applicants for Generic Fundamentals Exams Through Cy 2003 JAFP-99-0262, Forwards Voluntary Response to Administrative Ltr 99-03, Re Preparation & Scheduling of Operator Licensing Exams. Completed NRC Form 536,containing Info Re Proposed Exam Preparation Schedule & Initial Operator License Exams,Encl1999-09-16016 September 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Re Preparation & Scheduling of Operator Licensing Exams. Completed NRC Form 536,containing Info Re Proposed Exam Preparation Schedule & Initial Operator License Exams,Encl ML20212F7051999-09-14014 September 1999 Forwards Rev 19 to Ipn,Units 1 & 2 Physical Security Plan. Plan Withheld,Per 10CFR2.790(d) & 73.21 JAFP-99-0258, Forwards Operator License Restriction Change for Tj Pelton, License SOP-10090-3.License Is Requested to Be Reissued with Restriction for Corrective Lenses.Encl Withheld1999-09-0808 September 1999 Forwards Operator License Restriction Change for Tj Pelton, License SOP-10090-3.License Is Requested to Be Reissued with Restriction for Corrective Lenses.Encl Withheld 05000333/LER-1998-015, Forwards LER 98-015-02 Re Logic Sys Functional Test Inadequacies,Per 10CFR50.73(A)(2)(i)(B).Rept Revised to Reflect Scheduled Completion Date for Corrective Action 3 of Jan 15, 2000 & Updates Status of Other C/As as Complete1999-09-0808 September 1999 Forwards LER 98-015-02 Re Logic Sys Functional Test Inadequacies,Per 10CFR50.73(A)(2)(i)(B).Rept Revised to Reflect Scheduled Completion Date for Corrective Action 3 of Jan 15, 2000 & Updates Status of Other C/As as Complete JPN-99-028, Informs That Util Requires Extension from 990901 to 1015,to Complete Review of Rvid & Forward Comments to Nrc,Per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity1999-08-30030 August 1999 Informs That Util Requires Extension from 990901 to 1015,to Complete Review of Rvid & Forward Comments to Nrc,Per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity JAFP-99-0247, Forwards JAFNPP Effluent & Waste Disposal Semi-Annual Rept for 990101-0630, IAW Amend 93,App B,Section 7.3.C of Plant Ts.Format Used for Rept Is Outlined in App B of Reg Guide 1.21,Rev 1.Distribution Is IAW Reg Guide 10.1,Rev 41999-08-26026 August 1999 Forwards JAFNPP Effluent & Waste Disposal Semi-Annual Rept for 990101-0630, IAW Amend 93,App B,Section 7.3.C of Plant Ts.Format Used for Rept Is Outlined in App B of Reg Guide 1.21,Rev 1.Distribution Is IAW Reg Guide 10.1,Rev 4 JAFP-99-0245, Informs That Two Licensed Operators Have Returned to Site Upon Release for Normal Duties by Physician.R Korthas, License OP-11159,meets ANSI Std 3.4-1983 & R Sarkissian License SOP-10007-3,was Terminated in Mar 19991999-08-19019 August 1999 Informs That Two Licensed Operators Have Returned to Site Upon Release for Normal Duties by Physician.R Korthas, License OP-11159,meets ANSI Std 3.4-1983 & R Sarkissian License SOP-10007-3,was Terminated in Mar 1999 ML20211E1531999-08-18018 August 1999 Forwards Semi Annual fitness-for-duty Program Performance Data for 990101-990630,IAW 10CFR26.71(d) ML20211H6051999-08-18018 August 1999 Forwards Rev 8 to Security Force Training & Qualification Plan, for Indian Point 3 Nuclear Power Plant.Rev Facilitates Transition of Duty Weapons Carried by Security Force Members from Revolvers to Semiautomatic Pistols ML20211A9241999-08-11011 August 1999 Informs That IPS Currently Estimates,That Approx Two Licensing Actions Will Be Submitted to NRC During Remainder of 1999 NRC Fiscal Yr & Approx Ten Will Be Submitted During 2000 NRC Fiscal Yr JPN-99-025, Forwards Relief Request 17 Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) for Reactor Pressure Vessel Circumferential Shell Weld Exams1999-08-0505 August 1999 Forwards Relief Request 17 Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) for Reactor Pressure Vessel Circumferential Shell Weld Exams JPN-99-026, Forwards Relief Requests 18 & 19 to Jaf ISI Program Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) & Relief from ASME Section XI Code Re Insp of RPV Vertical Shell & Shell to Flange Welds1999-08-0505 August 1999 Forwards Relief Requests 18 & 19 to Jaf ISI Program Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) & Relief from ASME Section XI Code Re Insp of RPV Vertical Shell & Shell to Flange Welds ML20210M7251999-07-26026 July 1999 Forwards Projection of Ability to Pay Retrospective Premium Adjustment for Period of Aug 1999 to 000731, Which Demonstrates That Ceny Will Have Sufficient Cash Flow &/Or Cash Reserve Available Throughout Period to Pay Premium JAFP-99-0229, Forwards Three Sets of Corrected Summaries of Changes for Inclusion Into Security Plan for Ja FitzPatrick Nuclear Power Plant,Rev 19 & Security Contingency Plan,Rev 5.Encls Withheld Per 10CFR73.21 & 10CFR2.790)d)(1)1999-07-22022 July 1999 Forwards Three Sets of Corrected Summaries of Changes for Inclusion Into Security Plan for Ja FitzPatrick Nuclear Power Plant,Rev 19 & Security Contingency Plan,Rev 5.Encls Withheld Per 10CFR73.21 & 10CFR2.790)d)(1) JAFP-99-0228, Forwards Rept Re Changes & Errors in ECCS Evaluation Models, Per 10CFR50.46(a)(3)(ii) for Period from 980701-990630.No Commitments Contained in Submittal1999-07-21021 July 1999 Forwards Rept Re Changes & Errors in ECCS Evaluation Models, Per 10CFR50.46(a)(3)(ii) for Period from 980701-990630.No Commitments Contained in Submittal ML20210G8911999-07-20020 July 1999 Forwards Application for Amend to License DPR-5 for Proposed New TS 3.2.1.i,revising Senior Reactor License Requirement for Operations Manager JAFP-99-0208, Provides Clarification of Info Re Proposed Its, & 0601.Table Reconciling Differences,Encl1999-07-14014 July 1999 Provides Clarification of Info Re Proposed Its, & 0601.Table Reconciling Differences,Encl ML20210C9031999-06-30030 June 1999 Summarizes Impact of Changes & Errors in Methodology Used by GE to Demonstrate Compliance with ECCS Requirements of 10CFR50.46.Summary of Changes & Errors Provided in Attached Table JPN-99-021, Forwards Application for Amend to License DPR-59,changing to Pressure Temp Limits.Pressure Temp Curves & Associated LCO & Bases Changes Included in Proposed Amend1999-06-22022 June 1999 Forwards Application for Amend to License DPR-59,changing to Pressure Temp Limits.Pressure Temp Curves & Associated LCO & Bases Changes Included in Proposed Amend JPN-99-020, Submits Response to RAI Re ISI Program Relief Requests for Second 10-yr Interval Closeout & Summary Rept,Per 990426 Telcon with Nrc.Info Provided to Clarify or Withdraw Individual Relief Requests Contained in Summary Rept1999-06-21021 June 1999 Submits Response to RAI Re ISI Program Relief Requests for Second 10-yr Interval Closeout & Summary Rept,Per 990426 Telcon with Nrc.Info Provided to Clarify or Withdraw Individual Relief Requests Contained in Summary Rept JPN-99-019, Withdraws Recent Exemption Request Re 10CFR50,App R, Use of Core Spray to Achieve Safe Shutdown. Exemption Dealt with Use of Core Spray for Reactor Coolant Makeup to Achieve Safe Shutdown in One Fire Area at Plant1999-06-15015 June 1999 Withdraws Recent Exemption Request Re 10CFR50,App R, Use of Core Spray to Achieve Safe Shutdown. Exemption Dealt with Use of Core Spray for Reactor Coolant Makeup to Achieve Safe Shutdown in One Fire Area at Plant ML20196A6371999-06-15015 June 1999 Forwards Rev 19 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(d) & 73.21 JPN-99-018, Forwards Revised Application,Previously Submitted,For Amend to Plant TS for Converting CTS to ITS Consistent with Improved Std TS (NUREG-1433,Rev 1)1999-06-0101 June 1999 Forwards Revised Application,Previously Submitted,For Amend to Plant TS for Converting CTS to ITS Consistent with Improved Std TS (NUREG-1433,Rev 1) JAFP-99-0171, Forwards Revised Ja FitzPatrick Nuclear Power Plant 1999 FSAR Update. Update Also Includes Changes to Chapter 17, QA Program Which Described in Attachment 1.No Commitments Contained in Ltr1999-05-20020 May 1999 Forwards Revised Ja FitzPatrick Nuclear Power Plant 1999 FSAR Update. Update Also Includes Changes to Chapter 17, QA Program Which Described in Attachment 1.No Commitments Contained in Ltr JPN-99-016, Forwards Application for Amend to License DPR-59,requesting 14 Day AOT for EDG Sys.Commitment Made by Util,Encl1999-05-19019 May 1999 Forwards Application for Amend to License DPR-59,requesting 14 Day AOT for EDG Sys.Commitment Made by Util,Encl JAFP-99-0168, Forwards Eight Operator License Renewal Applications for Listed Individuals.Without Encls1999-05-13013 May 1999 Forwards Eight Operator License Renewal Applications for Listed Individuals.Without Encls JAFP-99-0160, Forwards 1998 Annual Radiological Environ Operating Rept for Ja FitzPatrick Nuclear Power Plant. Distribution for Rept Is IAW Reg Guide 10.1,Rev 41999-04-30030 April 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Ja FitzPatrick Nuclear Power Plant. Distribution for Rept Is IAW Reg Guide 10.1,Rev 4 ML20205T1141999-04-22022 April 1999 Provides Comments from Technical Review of Draft Info Notice Re Unanticipated Reactor Water Draindown at Quad Cities Nuclear Power Station,Unit 2,ANO,Unit 2 & JAFNPP JPN-99-012, Informs That Authority Identified Typographical Error on Page 3 of Attachment 3 of 990331 Response to NRC RAI Re App R.Corrected Response to NRC Question 3 Is Attached1999-04-16016 April 1999 Informs That Authority Identified Typographical Error on Page 3 of Attachment 3 of 990331 Response to NRC RAI Re App R.Corrected Response to NRC Question 3 Is Attached ML20205R2961999-04-15015 April 1999 Forwards Copy of Proposed Change to Indian Point SPDES Permit NY0004472.Proposed Change Requests Permission to Add Permitted Outfall to Plant as Well as Change Character of Existing Outfall.Without Encl JAFP-99-0129, Submits Comments on Technical Review of Draft Info Notice Describing Unanticipated Reactor Water Draindown at Quad Cities Unit 2,ANO & FitzPatrick1999-04-0909 April 1999 Submits Comments on Technical Review of Draft Info Notice Describing Unanticipated Reactor Water Draindown at Quad Cities Unit 2,ANO & FitzPatrick JAFP-99-0127, Forwards Affidavit Signed by Holtec Which Describes Proprietary Nature of Licensing Rept & Addresses Considerations Listed in 10CFR2.790.Attachment 4 in Util Re Design Features Should Be Withheld1999-04-0808 April 1999 Forwards Affidavit Signed by Holtec Which Describes Proprietary Nature of Licensing Rept & Addresses Considerations Listed in 10CFR2.790.Attachment 4 in Util Re Design Features Should Be Withheld JAFP-99-0124, Forwards Rev 19 to JAFNPP Security Plan,Which Enhances Requirements of 10CFR73.55.Changes Do Not Decrease Safeguards Effectiveness of Plan.Plan Withheld IAW 10CFR73.21 & 2.790(d)(1)1999-04-0707 April 1999 Forwards Rev 19 to JAFNPP Security Plan,Which Enhances Requirements of 10CFR73.55.Changes Do Not Decrease Safeguards Effectiveness of Plan.Plan Withheld IAW 10CFR73.21 & 2.790(d)(1) JAFP-99-0125, Forwards Rev 5 to JAFNPP Security Contingency Plan,Which Enhances Requirements of 10CFR73.55.Changes Do Not Decrease Effectiveness of Plan.Plan Withheld IAW 10CFR73.21 & 2.790(d)(1)1999-04-0707 April 1999 Forwards Rev 5 to JAFNPP Security Contingency Plan,Which Enhances Requirements of 10CFR73.55.Changes Do Not Decrease Effectiveness of Plan.Plan Withheld IAW 10CFR73.21 & 2.790(d)(1) ML20205M8941999-04-0707 April 1999 Forwards Rev 21 to App C of JAFNPP Emergency Plan & Rev 1 to EAP-32, Recovery Support Group Manager JPN-99-011, Forwards Application for Amend to License DPR-59,removing Position Title of General Manager from Sections & Will Delegate Responsibilities to Another Staff Member,In Writing1999-04-0505 April 1999 Forwards Application for Amend to License DPR-59,removing Position Title of General Manager from Sections & Will Delegate Responsibilities to Another Staff Member,In Writing JPN-99-008, Forwards Application for Amend to License DPR-59,converting CTS to Be Consistent with Improved Std TS in NUREG-1433, Rev 1.Synopsis of LAR for Conversion to Its,Pending Lars, List of Subsections,Scope of Changes & Commitments,Encl1999-03-31031 March 1999 Forwards Application for Amend to License DPR-59,converting CTS to Be Consistent with Improved Std TS in NUREG-1433, Rev 1.Synopsis of LAR for Conversion to Its,Pending Lars, List of Subsections,Scope of Changes & Commitments,Encl JPN-99-010, Transmits Revised Exemption Request from Some of Requirements of 10CFR50,App R.Exemption Would Permit Use of CS for Rc Makeup to Achieve Safe Shutdown in Fire Area XI at JAFNPP1999-03-31031 March 1999 Transmits Revised Exemption Request from Some of Requirements of 10CFR50,App R.Exemption Would Permit Use of CS for Rc Makeup to Achieve Safe Shutdown in Fire Area XI at JAFNPP 05000333/LER-1999-001, Forwards LER 99-001-01 Re Incorrect EDG line-up During Fire Placing Plant in Outside Design Basis.Suppl Contains Results of Completed Root Cause Evaluations & Subsequent Corrective Actions Taken.Rept Contains No Commitments1999-03-31031 March 1999 Forwards LER 99-001-01 Re Incorrect EDG line-up During Fire Placing Plant in Outside Design Basis.Suppl Contains Results of Completed Root Cause Evaluations & Subsequent Corrective Actions Taken.Rept Contains No Commitments ML20205G4111999-03-31031 March 1999 Forwards Rev 7 to JAFNPP EP App J & Rev 6,pages 7 & 8 to EAP-5.3 ML20196K8111999-03-31031 March 1999 Forwards Decommissioning Funding Status Rept for Indian Point,Units 1 & 2 Through 981231 JAFP-99-0112, Informs of Util Determination That Listed Individuals No Longer Need to Maintain Operating License for Ja FitzPatrick Nuclear Plant.Termination of Listed Licenses,Requested1999-03-29029 March 1999 Informs of Util Determination That Listed Individuals No Longer Need to Maintain Operating License for Ja FitzPatrick Nuclear Plant.Termination of Listed Licenses,Requested JAFP-99-0114, Requests That License OP-11037,for Bs Brooks,Be re-issued Without Restriction for Corrective Lenses.Nrc Form 369,encl. Without Encl1999-03-29029 March 1999 Requests That License OP-11037,for Bs Brooks,Be re-issued Without Restriction for Corrective Lenses.Nrc Form 369,encl. Without Encl ML20205F9711999-03-25025 March 1999 Informs That Under Separate Cover,Licensee Transmitted to Ofc of Nuclear Regulatory Research Annual Rept of Results of Individual Monitoring at Indian Point,Units 1 & 2,for CY98 1999-09-08 Category:UTILITY TO NRC MONTHYEARJPN-90-063, Responds to NRC Re Deviations Noted in Insp Rept 50-333/90-19.Interim Corrective Action:Temporary Procedure Change Implemented to Administratively Prohibit Concurrent Closure of Upstream Feeder Breakers Until Issue Resolved1990-09-18018 September 1990
[Table view]Responds to NRC Re Deviations Noted in Insp Rept 50-333/90-19.Interim Corrective Action:Temporary Procedure Change Implemented to Administratively Prohibit Concurrent Closure of Upstream Feeder Breakers Until Issue Resolved JPN-90-061, Forwards Analyses Re Installation of Hardened Wetwell Vent, Including Benefits of Elevated Vs Ground Level Gas Release. Analyses Provide Further Evidence That Addition of Elevated Release to Existing Hardened Vent Not Cost Beneficial1990-09-0707 September 1990 Forwards Analyses Re Installation of Hardened Wetwell Vent, Including Benefits of Elevated Vs Ground Level Gas Release. Analyses Provide Further Evidence That Addition of Elevated Release to Existing Hardened Vent Not Cost Beneficial ML0934410661990-09-0606 September 1990 Forwards Rev 20 to Vol I Emergency Plan Index,Rev 35 to Vol II, Emergency Response Activation, Rev 60 to Vol III EPIP Index & Rev 12 to IP-1011, Offsite Monitoring/Site Perimeter Surveys. JPN-90-060, Forwards Info to Satisfy 900716 Commitment Re Switchgear Deficiency,Per SSFI Insp Rept 50-333/89-80.Waiver Requested Re Design Requirements for Three Phase Bolted Fault Criteria for Switchgear Configuration for Diesel Generator Testing1990-09-0404 September 1990 Forwards Info to Satisfy 900716 Commitment Re Switchgear Deficiency,Per SSFI Insp Rept 50-333/89-80.Waiver Requested Re Design Requirements for Three Phase Bolted Fault Criteria for Switchgear Configuration for Diesel Generator Testing JPN-90-057, Forwards GE Supplemental Rept of Ultrasonic Indications in Top Head Weld VC-TH-1-2 at Ja Fitzpatrick Power Station1990-08-14014 August 1990 Forwards GE Supplemental Rept of Ultrasonic Indications in Top Head Weld VC-TH-1-2 at Ja Fitzpatrick Power Station ML1003314851990-08-0707 August 1990 Forwards Proprietary WCAP-12687 & Nonproprietary WCAP-12688, Indian Point Unit 2 Tube Fatigue Reevaluation, Rev 2,per NRC Request.Proprietary Rept Withheld (Ref 10CFR2.790) ML1003314901990-08-0101 August 1990 Forwards Proprietary WCAP-12670 & Nonproprietary WCAP-12671, Indian Point Unit 2 - Final Rept on Steam Generator Insp, Repair & Restoration Efforts During 1990 Midcycle Insp. Proprietary Rept Withheld (Ref 10CFR2.790(b)(4)) ML20058L4741990-07-31031 July 1990 Forwards 900713 Projection for Aug 1990 - Jul 1991 Guaranteeing Payment of Deferred Premiums JAFP-90-0581, Forwards Proposed Rev 6 to IAP-2, Classification of Emergency Conditions, Per Insp Rept 50-333/90-15,Unresolved Item 89-11-03.Rev Incorporates Changes Assuring That Applicable Initiating Conditions,Per NUREG-0654,addressed1990-07-30030 July 1990 Forwards Proposed Rev 6 to IAP-2, Classification of Emergency Conditions, Per Insp Rept 50-333/90-15,Unresolved Item 89-11-03.Rev Incorporates Changes Assuring That Applicable Initiating Conditions,Per NUREG-0654,addressed ML20056A7181990-07-27027 July 1990 Forwards Corrected Page 3.10-9 Inadvertently Omitted from 900621 Application for Amend to License DPR-64 Re Removal of cycle-specific Parameter Limits Per Generic Ltr 88-16 JPN-90-055, Forwards Comments on Installation of Hardened Wetwell Vent at Plant,Per 891027 Response to Generic Ltr 89-16.Concludes That Hardened Vent Not Cost Beneficial & Consideration of Mods Be Deferred Until Individual Plant Evaluation Complete1990-07-25025 July 1990 Forwards Comments on Installation of Hardened Wetwell Vent at Plant,Per 891027 Response to Generic Ltr 89-16.Concludes That Hardened Vent Not Cost Beneficial & Consideration of Mods Be Deferred Until Individual Plant Evaluation Complete 05000333/LER-1990-012, Advises That Suppl Rept to LER 90-012 Re Svc Water Check Valves Will Be Submitted by 9008201990-07-18018 July 1990 Advises That Suppl Rept to LER 90-012 Re Svc Water Check Valves Will Be Submitted by 900820 ML20055G9971990-07-17017 July 1990 Forwards Decommissioning Financial Assurance Certification Rept for Facilities,Per 10CFR50.33(K)(2) ML0934410591990-07-16016 July 1990 Forwards Rev 34 to Vol II, Emergency Response Activation, & Revised Epips,Including Rev 11 to IP-1038,Rev 16 to IP-1050,Rev 6 to IP-1054 & Rev 12 to IP-1076 05000333/LER-1989-012, Advises That Suppl to LER 89-012-00 Re Postulated Fault 4 Kv Bus Fault Will Be Submitted by 9009041990-07-16016 July 1990 Advises That Suppl to LER 89-012-00 Re Postulated Fault 4 Kv Bus Fault Will Be Submitted by 900904 ML20044A9311990-07-0606 July 1990 Responds to NRC 900611 Ltr Re Violations Noted in Insp Rept 50-333/90-17.Corrective Action:Suspended Surveillances Reinstated on 900507 ML1003314461990-06-27027 June 1990 Forwards Proprietary & Nonproprietary WCAP-12625 & WCAP-12626, Status Rept Indian Point Unit 2 Mid-Cycle Steam Generator Insp Presentation to NRC & WCAP-12627 & WCAP-12628, Indian Point Unit 2 Steam Generator Insp.... ML20043H9981990-06-21021 June 1990 Forwards Application for Amend to License DPR-64,proposing Removal of cycle-specific Parameters from Tech Specs,Per Generic Ltr 88-16 ML20043J0101990-06-21021 June 1990 Forwards Application for Amend to License DPR-59,making Temporary Change Re LPCI Pump Flow Permanent,Per 900228 Ltr. Change Reduced Surveillance Test Flow Acceptance Value for RHR Pump JAFP-90-0468, Informs That Licensed Operator Requalification Training Program at Plant Completed Transition to Program Based on Sys Approach to Training as Ref to in 10CFR55.4 & 591990-06-14014 June 1990 Informs That Licensed Operator Requalification Training Program at Plant Completed Transition to Program Based on Sys Approach to Training as Ref to in 10CFR55.4 & 59 ML20043G2491990-06-12012 June 1990 Forwards Application for Amend to License DPR-59,revising Tech Specs to Reflect Containment Isolation Valves in RHR & Core Spray keep-full Sys ML20043G2971990-06-11011 June 1990 Submits Supplemental Info Re New Temp Sensors Installed in Primary Auxiliary Bldg & Revised Safety Evaluation,To Support 900412 Request for Tech Spec Changes.New Temp Sensors in Piping Penetration Have Setpoints of 140 F ML20043H0851990-06-11011 June 1990 Forwards Reload 9/Cycle 10 Core Operating Limits Rept. ML20043G7561990-06-11011 June 1990 Forwards Application for Amend to License DPR-59 Re Performance Discharge Testing of 125-volt Dc Batteries & LPCI Motor Operated Valve Independent Power Supplies ML20043G6131990-06-11011 June 1990 Responds to Notice of Violation & Proposed Imposition of Civil Penalties in Amount of $75,000 Re Radiation Exposure. Corrective Actions:Worker Decontaminated & Examined by Physician.Civil Penalty Fee Transferred Electronically ML20043F5931990-06-11011 June 1990 Forwards GE Nonproprietary Rept, GE11 Lead Test Assembly Fo Ja Fitzpatrick Nuclear Power Plant Reload 9 Cycle 10 & Proprietary Rept GE11 Lead Test Assembly Fuel Bundle.... Proprietary Rept Withheld (Ref 10CFR2.790) ML20043H0451990-06-0808 June 1990 Responds to NRC 900509 Ltr Re Violations Noted in Insp Rept 50-333/90-02.Corrective Actions:Refuel Floor Work Stopped, Chief Radiation Protection Technician Disciplined & Importance of Following Procedural Guidelines Reinforced ML20043E8911990-06-0707 June 1990 Forwards IGSCC Insp 1990 Refueling Outage Summary Rept Addendum ML20043C3381990-05-31031 May 1990 Forwards Application for Amend to License DPR-59,revising Tech Spec 5.5.B to Increase Number of Spent Fuel Assemblies That Can Be Stored in Spent Fuel Pool ML20043C5091990-05-30030 May 1990 Forwards Application for Amend to License DPR-59,updating Tech Spec Tables 3.2-8 & 4.2-8 to Reflect Installation of post-accident Monitoring Instrumentation,Per Reg Guide 1.97 & Deleting Tables 3.2-6,4.2-6 & 4.7-1 ML20043C7411990-05-25025 May 1990 Forwards Structural Evaluation of Indications in Reactor Top Head at Ja Fitzpatrick Power Station, Based on Evaluation Analyses for Flaw Indications Identified During Routine Inservice Insps ML0934410501990-05-18018 May 1990 Forwards Rev 20 to Emergency Plan,Rev 33 to Emergency Response Activation & Revised Epips,Including IP-1011 ML1003312261990-05-16016 May 1990 Forwards Proprietary WCAP 12573 & Nonproprietary WCAP 12574, Indian Point Unit 2 Steam Generator Insp,Repair & Restoration Program Per NRC 900314 Request.Proprietary Rept Withheld ML20043A7681990-05-16016 May 1990 Responds to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Box Bow. Channel Boxes Not Reused After First Lifetime.Methodology Developed by Ge,Vendor for Plant, Used to Account for Channel Bow ML20043B1021990-05-14014 May 1990 Responds to NRC 900412 Ltr Re Violations Noted in Insp Rept 50-333/90-01.Corrective Actions:Disciplinary Actions Taken & Job Performance Counseling Provided Re Responsibilites for Control Room Operations & Command in Control Room ML20043A7471990-05-14014 May 1990 Responds to NRC 900413 Ltr Re Violations Noted in Insp Rept 50-333/90-13.Util Requests That Notice of Violation Be Withdrawn & Reclassified as Deviation & That Submittal of Inaccurate Info Be Considered Isolated Case ML20042G8271990-05-0909 May 1990 Responds to NRC 900410 Ltr Re Violations Noted in Insp Rept 50-333/90-11.Corrective Actions:Mod Error Corrected,New Transmitters Installed & Mod Procedures to Be Revised to Assign Responsibility for Calibr Points Value Calculation ML20042F3891990-04-30030 April 1990 Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, 'Safety Implication of Control Sys in LWR Nuclear Power Plants.' ML20042E6251990-04-20020 April 1990 Forwards Application for Amend to License DPR-59,changing Tech Specs to Remove cycle-specific Parameter Limits & Ref Core Operating Limits Rept Which Contains Limits,Per Generic Ltr 88-16 ML20012F0361990-04-0505 April 1990 Forwards Temporary Addendum Rept for Rev 1 to Security Plan. Rept Withheld (Ref 10CFR73.21 & 2.790(d)(1)) ML20012F4791990-04-0303 April 1990 Informs That Current Revs to Emergency Plan Sent to NRC Document Control Desk ML20012F2161990-04-0202 April 1990 Forwards Application for Amend to License DPR-59,revising Sections 3.5.F & 4.5.F of Tech Specs, Min ECCS Availability. ML20012C9821990-03-13013 March 1990 Forwards Application for Amend to License DPR-59,changing Tech Spec Section 4.9.F, LPCI Motor-Operated Valve Independent Power Supplies, on Page 222a.Changes Purely Editorial in Nature & Revises Surveillance Requirement ML20012C0441990-03-0909 March 1990 Forwards Application for Amend to License DPR-59,clarifying Spec 3.9.B.3 Re Diesel Generator Operability to Eliminate Erroneous Ref to Both Diesel Generator Sys ML1003312131990-03-0505 March 1990 Forwards Rev 5 to Fire Protection Program Plan. ML20012A1021990-03-0101 March 1990 Forwards Inservice Insp Hydrostatic Test Program for Class 2 & 3 Sys Conducted During First 10-Yr Insp Interval. Relief Requested for Second 10-yr Insp Interval for Hydrostatic Relief Requests Contained in Encl ML20012A0201990-02-28028 February 1990 Forwards Response to NRC SALP Initial Rept 50-333/88-99 for May 1988 - Sept 1989.Emergency Operating Procedures Being Upgraded to Rev 4 of Emergency Procedures Guidelines & Will Be in Place Upon Startup from Spring Refueling Outage ML20012A9301990-02-28028 February 1990 Forwards New York Power Authority Ja Fitzpatrick Nuclear Power Plant Effluent & Waste Disposal Semiannual Rept Jul-Dec 1989 & Rev 7 to Odcm. JPN-90-016, Requests That 900209 Application for Amend to License DPR-59 Be Processed on Emergency Basis & Approved by 900225 to Avoid Premature Plant Shutdown1990-02-21021 February 1990 Requests That 900209 Application for Amend to License DPR-59 Be Processed on Emergency Basis & Approved by 900225 to Avoid Premature Plant Shutdown ML20006E3921990-02-13013 February 1990 Forwards Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Testing of Circulating Water/Svc Water Sys for Mussels Will Begin Spring 1990 1990-09-07 |
Text
f '
POWER AUTHORITY OF THE STATE OF NEW YORK
/c 10 CoLUMaus CIRCLE NEW YORK. N. Y.10019 (212) 397-6200 GEORGE T. BERRY GENERAL MANAGER AND CHIEF E NGIN E E R
"*'= t.m""v7, ...,
GEoR.E L. . . Au.
vice ca i..au
-
c 1 g;<=-GeNr at j
WILBUR L. GRONDERG RICHARD M. FLYNN ^
oecember 28, 1978 RosERri.usueuu IPO-180 / ,,,, ,1f0"'s,*.',"NU^f,,
, ,,,you WILLIAM F. LUDDY Pow En oPER ATIONS Office Of Nuclear Material Safety "
"#Eo S "o f.".^""' '"' ,
and Safeguards \
United States Nuclear Regulatory Commit; ion -
Washington, D.C. 20555 Attention: Mr. Charles E. Mac Donald Chief, Transportation Branch Division of Fuel Cycle and Material Safety
Subject:
James A. FitzPatrick Nuclear Power Plant, Docket No. 50-333 Indian Point 3 Nuclear Power Plant, Docket No. 50-286 Quality Assurance Requirements Contained in 10CFR Part 71 for Shipping Packages
Dear Sirs:
Pursuant to the requirements of 10CFR 71.51(d), the Power Authority of the State of New York will apply the applicableQuality portions of its U.S.
Assurance Nuclear Regulatory Commission approved Operation Programs to the applicable activities set forth la 10CFR 71, " Packaging of Radioactive Material for Transport and Transportation of Radioactive Materials Under Certain Conditions". The Authority's Quality Assurance Programs will be modified accordingly.
Carriers of radioactive materials are required to submit their Quality Assurance Programs to the Commission for review and approval by January 1, 1979. The Authority, accordingly, will not approve the Quality Assurance Programs of such carriers under contract to the Authority. However, at such time that the Commission approves the Quality Assurance Programs of such carriers under contract with the Authority, we shall provide for random audits to verify implementation by the carriers of selected areas of their Quality Assurance Programs.
Very tru y 7ours, V. . .
Paul J. Early Assistant Chief Engineer - Projects cc: Boyce Grier, Director, USNRC Region I, Inspection and Enforcement 3
" Thomas Ippolito, Chief,USNRC Division of Operating Reactors, Branch No. 1 Albert Schwencer, Chief,USNRC Division of Operating Reactors, Branch No.
1 7 9 0110 0 I gf f)%q f'