ML20205G411
| ML20205G411 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 03/31/1999 |
| From: | POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20205G416 | List: |
| References | |
| NUDOCS 9904070240 | |
| Download: ML20205G411 (1) | |
Text
(
l e'NEhYORKPOWERAUTHORITY
~
l
j JAMES A.
FITZPATRICK NUCLEAR POWER PLANT l
P.O.
BOX 41 LYCOMING, NY 13093
(-)
CONTROLLED COPY NUMBER: 34 l
DOCUMENT TRANSMITTAL AND RECEIPT i
TO:
U.S.N.R.C. Document Center / Washington, DC
{
FROM:
EMERGENCY PLANNING DEPARTMENT DATE:
March 31, 1999
SUBJECT:
EMERGENCY PLAN AND IMPLEMENTING PROCEDURES I
Enclosed are revisions to your assigned copy of the JAFNPP Emergency Plan and Implementing Procedures.
Please remove the old pages, insert the attached, initial and date this routing sheet and return the completed routing sheet with old pages to the Emergency Planning Department within 15 days.
If this transmittal is not returned within 15 days, your name will be removed from the controlled list.
SECTION PAGES INITIALS /DATE__
Remove old and return; insert new VOLUME #1 APPENDIX J REV. 7 REPLACE ALL - EDITORIAL CORRECTION
/
p)
(,
VOLUME #2 EAP-5.3 REV. 6 REPLACE PAGE 7/8 ONLY
/
EDITORIAL CORRECTION i
/
kJ r,70040 l
l
(-
t i
9904070240 990331 V'
PDR ADOCK 05000333 F