Forwards Application for Amend to License DPR-59 Re Performance Discharge Testing of 125-volt Dc Batteries & LPCI Motor Operated Valve Independent Power Supplies
ML20043G756
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/11/1990
From: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20043G757 List:
References
JPN-90-046, JPN-90-46, NUDOCS 9006210098
Download: ML20043G756 (2)


Text

_ .

k '

, 123 Mein Street White fMains, NewWrk 10601 914 081.6240 I!

Mhh [ John C. Brons

(# Authority d0!l2l?"'

June 11, 1990 '

JIN-90-046 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1137 1 Washington, D.C. 20555

SUBJECT:

James A. RtzPatrick Nuclear Power Plant.

Docket No. 50333 Proposed Changes to the Technical Specifications Regarding l Performance Discharge Testing of the 125 VDC Station Battery and the LPCI MOV Independent Power Supplies (JPTS-89 033)

REFERENCES:

1. NRC letter, B. A. Boger to W. Fernandez, "NRC Safety System Functional Inspection (SSFI)" Report No. 50-333/89-80, dated ,

August 22,1989.

Dear Sir:

This application for an amendment to the James A. FitzPatrick Technical Specifications deletes the reference to Regulatory Guide 1.129 in Surveillance Requirements 4.9.E, " Station Batteries," and 4.9.F, "LPCI MOV Independent Power supplies." These changes revise the Technical Specifications in accordance with the Authority's commitment in response to an SSFI team concem (Reference 1, item 4.7.3).

The changes make the battery technical specifications consistent with actual plant practice and IEEE 4501987 by allowing the application of an equalizing charge to the batteries prior to conducting the performance discharge (capacity) test.

l Enclosed for filing is the signed original of a document entitled " Application for l Amendment to Operating Ucense," with Attachments I and ll thereto, comprising a l statement of the proposed changes to the Technical Specifications and the associated l Safety Evaluation.

In accordance with 10 CFR 50.91, a copy of this application and the associated attachments are being provided to the designated New York State official.

l.

7,$6*00$

P

$& '(igg

s < ..

Should you or your staff have any questions regarding the' proposed changes, please contact Mr. J. B. Ellmers of my staff. ,

+

Very truly yours, w

$1n C. Brons Executive Vice President Nuclear Generation cc: U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 .

s

- Office of the Resident inspector U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093 Mr. David E. LaBarge Project Directorate I 1 Division of Reactor Projects l/ll U.S. Nuclear Regulatory Commission Mall Stop 14 B2 .

Washington, DC 20555 L Ms. Donna Ross New York State Energy Office 2 Empire State Plaza 16th Floor Albany, NY 12223 L