JPN-90-063, Responds to NRC Re Deviations Noted in Insp Rept 50-333/90-19.Interim Corrective Action:Temporary Procedure Change Implemented to Administratively Prohibit Concurrent Closure of Upstream Feeder Breakers Until Issue Resolved | 18 September 1990 | Responds to NRC Re Deviations Noted in Insp Rept 50-333/90-19.Interim Corrective Action:Temporary Procedure Change Implemented to Administratively Prohibit Concurrent Closure of Upstream Feeder Breakers Until Issue Resolved | |
JPN-90-061, Forwards Analyses Re Installation of Hardened Wetwell Vent, Including Benefits of Elevated Vs Ground Level Gas Release. Analyses Provide Further Evidence That Addition of Elevated Release to Existing Hardened Vent Not Cost Beneficial | 7 September 1990 | Forwards Analyses Re Installation of Hardened Wetwell Vent, Including Benefits of Elevated Vs Ground Level Gas Release. Analyses Provide Further Evidence That Addition of Elevated Release to Existing Hardened Vent Not Cost Beneficial | Hardened vent |
ML093441066 | 6 September 1990 | Forwards Rev 20 to Vol I Emergency Plan Index,Rev 35 to Vol II, Emergency Response Activation, Rev 60 to Vol III EPIP Index & Rev 12 to IP-1011, Offsite Monitoring/Site Perimeter Surveys. | |
JPN-90-060, Forwards Info to Satisfy 900716 Commitment Re Switchgear Deficiency,Per SSFI Insp Rept 50-333/89-80.Waiver Requested Re Design Requirements for Three Phase Bolted Fault Criteria for Switchgear Configuration for Diesel Generator Testing | 4 September 1990 | Forwards Info to Satisfy 900716 Commitment Re Switchgear Deficiency,Per SSFI Insp Rept 50-333/89-80.Waiver Requested Re Design Requirements for Three Phase Bolted Fault Criteria for Switchgear Configuration for Diesel Generator Testing | Safe Shutdown Reserve Station Service Transformer |
JPN-90-057, Forwards GE Supplemental Rept of Ultrasonic Indications in Top Head Weld VC-TH-1-2 at Ja Fitzpatrick Power Station | 14 August 1990 | Forwards GE Supplemental Rept of Ultrasonic Indications in Top Head Weld VC-TH-1-2 at Ja Fitzpatrick Power Station | Non-Destructive Examination |
ML100331485 | 7 August 1990 | Forwards Proprietary WCAP-12687 & Nonproprietary WCAP-12688, Indian Point Unit 2 Tube Fatigue Reevaluation, Rev 2,per NRC Request.Proprietary Rept Withheld (Ref 10CFR2.790) | |
ML100331490 | 1 August 1990 | Forwards Proprietary WCAP-12670 & Nonproprietary WCAP-12671, Indian Point Unit 2 - Final Rept on Steam Generator Insp, Repair & Restoration Efforts During 1990 Midcycle Insp. Proprietary Rept Withheld (Ref 10CFR2.790(b)(4)) | |
ML20058L474 | 31 July 1990 | Forwards 900713 Projection for Aug 1990 - Jul 1991 Guaranteeing Payment of Deferred Premiums | |
JAFP-90-0581, Forwards Proposed Rev 6 to IAP-2, Classification of Emergency Conditions, Per Insp Rept 50-333/90-15,Unresolved Item 89-11-03.Rev Incorporates Changes Assuring That Applicable Initiating Conditions,Per NUREG-0654,addressed | 30 July 1990 | Forwards Proposed Rev 6 to IAP-2, Classification of Emergency Conditions, Per Insp Rept 50-333/90-15,Unresolved Item 89-11-03.Rev Incorporates Changes Assuring That Applicable Initiating Conditions,Per NUREG-0654,addressed | |
ML20056A718 | 27 July 1990 | Forwards Corrected Page 3.10-9 Inadvertently Omitted from 900621 Application for Amend to License DPR-64 Re Removal of cycle-specific Parameter Limits Per Generic Ltr 88-16 | |
JPN-90-055, Forwards Comments on Installation of Hardened Wetwell Vent at Plant,Per 891027 Response to Generic Ltr 89-16.Concludes That Hardened Vent Not Cost Beneficial & Consideration of Mods Be Deferred Until Individual Plant Evaluation Complete | 25 July 1990 | Forwards Comments on Installation of Hardened Wetwell Vent at Plant,Per 891027 Response to Generic Ltr 89-16.Concludes That Hardened Vent Not Cost Beneficial & Consideration of Mods Be Deferred Until Individual Plant Evaluation Complete | Safe Shutdown Ultimate heat sink Hardened vent Backfit |
05000333/LER-1990-012, Advises That Suppl Rept to LER 90-012 Re Svc Water Check Valves Will Be Submitted by 900820 | 18 July 1990 | Advises That Suppl Rept to LER 90-012 Re Svc Water Check Valves Will Be Submitted by 900820 | |
ML20055G997 | 17 July 1990 | Forwards Decommissioning Financial Assurance Certification Rept for Facilities,Per 10CFR50.33(K)(2) | |
ML093441059 | 16 July 1990 | Forwards Rev 34 to Vol II, Emergency Response Activation, & Revised Epips,Including Rev 11 to IP-1038,Rev 16 to IP-1050,Rev 6 to IP-1054 & Rev 12 to IP-1076 | |
05000333/LER-1989-012, Advises That Suppl to LER 89-012-00 Re Postulated Fault 4 Kv Bus Fault Will Be Submitted by 900904 | 16 July 1990 | Advises That Suppl to LER 89-012-00 Re Postulated Fault 4 Kv Bus Fault Will Be Submitted by 900904 | |
ML20044A931 | 6 July 1990 | Responds to NRC 900611 Ltr Re Violations Noted in Insp Rept 50-333/90-17.Corrective Action:Suspended Surveillances Reinstated on 900507 | High Radiation Area |
ML100331446 | 27 June 1990 | Forwards Proprietary & Nonproprietary WCAP-12625 & WCAP-12626, Status Rept Indian Point Unit 2 Mid-Cycle Steam Generator Insp Presentation to NRC & WCAP-12627 & WCAP-12628, Indian Point Unit 2 Steam Generator Insp.... | |
ML20043H998 | 21 June 1990 | Forwards Application for Amend to License DPR-64,proposing Removal of cycle-specific Parameters from Tech Specs,Per Generic Ltr 88-16 | |
ML20043J010 | 21 June 1990 | Forwards Application for Amend to License DPR-59,making Temporary Change Re LPCI Pump Flow Permanent,Per 900228 Ltr. Change Reduced Surveillance Test Flow Acceptance Value for RHR Pump | |
JAFP-90-0468, Informs That Licensed Operator Requalification Training Program at Plant Completed Transition to Program Based on Sys Approach to Training as Ref to in 10CFR55.4 & 59 | 14 June 1990 | Informs That Licensed Operator Requalification Training Program at Plant Completed Transition to Program Based on Sys Approach to Training as Ref to in 10CFR55.4 & 59 | |
ML20043G249 | 12 June 1990 | Forwards Application for Amend to License DPR-59,revising Tech Specs to Reflect Containment Isolation Valves in RHR & Core Spray keep-full Sys | |
ML20043H085 | 11 June 1990 | Forwards Reload 9/Cycle 10 Core Operating Limits Rept. | |
ML20043G756 | 11 June 1990 | Forwards Application for Amend to License DPR-59 Re Performance Discharge Testing of 125-volt Dc Batteries & LPCI Motor Operated Valve Independent Power Supplies | |
ML20043G613 | 11 June 1990 | Responds to Notice of Violation & Proposed Imposition of Civil Penalties in Amount of $75,000 Re Radiation Exposure. Corrective Actions:Worker Decontaminated & Examined by Physician.Civil Penalty Fee Transferred Electronically | |
ML20043F593 | 11 June 1990 | Forwards GE Nonproprietary Rept, GE11 Lead Test Assembly Fo Ja Fitzpatrick Nuclear Power Plant Reload 9 Cycle 10 & Proprietary Rept GE11 Lead Test Assembly Fuel Bundle.... Proprietary Rept Withheld (Ref 10CFR2.790) | |
ML20043G297 | 11 June 1990 | Submits Supplemental Info Re New Temp Sensors Installed in Primary Auxiliary Bldg & Revised Safety Evaluation,To Support 900412 Request for Tech Spec Changes.New Temp Sensors in Piping Penetration Have Setpoints of 140 F | Fire Protection Program |
ML20043H045 | 8 June 1990 | Responds to NRC 900509 Ltr Re Violations Noted in Insp Rept 50-333/90-02.Corrective Actions:Refuel Floor Work Stopped, Chief Radiation Protection Technician Disciplined & Importance of Following Procedural Guidelines Reinforced | |
ML20043E891 | 7 June 1990 | Forwards IGSCC Insp 1990 Refueling Outage Summary Rept Addendum | Weld Overlay |
ML20043C338 | 31 May 1990 | Forwards Application for Amend to License DPR-59,revising Tech Spec 5.5.B to Increase Number of Spent Fuel Assemblies That Can Be Stored in Spent Fuel Pool | |
ML20043C509 | 30 May 1990 | Forwards Application for Amend to License DPR-59,updating Tech Spec Tables 3.2-8 & 4.2-8 to Reflect Installation of post-accident Monitoring Instrumentation,Per Reg Guide 1.97 & Deleting Tables 3.2-6,4.2-6 & 4.7-1 | |
ML20043C741 | 25 May 1990 | Forwards Structural Evaluation of Indications in Reactor Top Head at Ja Fitzpatrick Power Station, Based on Evaluation Analyses for Flaw Indications Identified During Routine Inservice Insps | |
ML093441050 | 18 May 1990 | Forwards Rev 20 to Emergency Plan,Rev 33 to Emergency Response Activation & Revised Epips,Including IP-1011 | |
ML20043A768 | 16 May 1990 | Responds to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Box Bow. Channel Boxes Not Reused After First Lifetime.Methodology Developed by Ge,Vendor for Plant, Used to Account for Channel Bow | |
ML100331226 | 16 May 1990 | Forwards Proprietary WCAP 12573 & Nonproprietary WCAP 12574, Indian Point Unit 2 Steam Generator Insp,Repair & Restoration Program Per NRC 900314 Request.Proprietary Rept Withheld | |
ML20043B102 | 14 May 1990 | Responds to NRC 900412 Ltr Re Violations Noted in Insp Rept 50-333/90-01.Corrective Actions:Disciplinary Actions Taken & Job Performance Counseling Provided Re Responsibilites for Control Room Operations & Command in Control Room | |
ML20043A747 | 14 May 1990 | Responds to NRC 900413 Ltr Re Violations Noted in Insp Rept 50-333/90-13.Util Requests That Notice of Violation Be Withdrawn & Reclassified as Deviation & That Submittal of Inaccurate Info Be Considered Isolated Case | |
ML20042G827 | 9 May 1990 | Responds to NRC 900410 Ltr Re Violations Noted in Insp Rept 50-333/90-11.Corrective Actions:Mod Error Corrected,New Transmitters Installed & Mod Procedures to Be Revised to Assign Responsibility for Calibr Points Value Calculation | |
ML20042F389 | 30 April 1990 | Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, 'Safety Implication of Control Sys in LWR Nuclear Power Plants.' | |
ML20042E625 | 20 April 1990 | Forwards Application for Amend to License DPR-59,changing Tech Specs to Remove cycle-specific Parameter Limits & Ref Core Operating Limits Rept Which Contains Limits,Per Generic Ltr 88-16 | |
ML20012F036 | 5 April 1990 | Forwards Temporary Addendum Rept for Rev 1 to Security Plan. Rept Withheld (Ref 10CFR73.21 & 2.790(d)(1)) | |
ML20012F479 | 3 April 1990 | Informs That Current Revs to Emergency Plan Sent to NRC Document Control Desk | |
ML20012F216 | 2 April 1990 | Forwards Application for Amend to License DPR-59,revising Sections 3.5.F & 4.5.F of Tech Specs, Min ECCS Availability. | |
ML20012C982 | 13 March 1990 | Forwards Application for Amend to License DPR-59,changing Tech Spec Section 4.9.F, LPCI Motor-Operated Valve Independent Power Supplies, on Page 222a.Changes Purely Editorial in Nature & Revises Surveillance Requirement | |
ML20012C044 | 9 March 1990 | Forwards Application for Amend to License DPR-59,clarifying Spec 3.9.B.3 Re Diesel Generator Operability to Eliminate Erroneous Ref to Both Diesel Generator Sys | |
ML100331213 | 5 March 1990 | Forwards Rev 5 to Fire Protection Program Plan. | Fire Protection Program |
ML20012A102 | 1 March 1990 | Forwards Inservice Insp Hydrostatic Test Program for Class 2 & 3 Sys Conducted During First 10-Yr Insp Interval. Relief Requested for Second 10-yr Insp Interval for Hydrostatic Relief Requests Contained in Encl | Hydrostatic |
ML20012A930 | 28 February 1990 | Forwards New York Power Authority Ja Fitzpatrick Nuclear Power Plant Effluent & Waste Disposal Semiannual Rept Jul-Dec 1989 & Rev 7 to Odcm. | |
ML20012A020 | 28 February 1990 | Forwards Response to NRC SALP Initial Rept 50-333/88-99 for May 1988 - Sept 1989.Emergency Operating Procedures Being Upgraded to Rev 4 of Emergency Procedures Guidelines & Will Be in Place Upon Startup from Spring Refueling Outage | Weld Overlay Missed surveillance Systematic Assessment of Licensee Performance |
JPN-90-016, Requests That 900209 Application for Amend to License DPR-59 Be Processed on Emergency Basis & Approved by 900225 to Avoid Premature Plant Shutdown | 21 February 1990 | Requests That 900209 Application for Amend to License DPR-59 Be Processed on Emergency Basis & Approved by 900225 to Avoid Premature Plant Shutdown | |
ML20006E392 | 13 February 1990 | Forwards Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Testing of Circulating Water/Svc Water Sys for Mussels Will Begin Spring 1990 | Zebra Mussel Biofouling |