ML15092A114

From kanterella
Revision as of 00:52, 21 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search

March 4, 2015, Summary of Meeting Between Representatives of the U.S. Army Corps of Engineers, Nuclear Regulatory Commission, and Southern Nuclear Operating Company, Inc. to Discuss Flooding Analysis Associated with Joseph M. Farley Nuclear
ML15092A114
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/10/2015
From: Robert Kuntz
Japan Lessons-Learned Division
To:
Kuntz R, NRR/JLD, 415-3733
References
TAC MF3037, TAC MF3038
Download: ML15092A114 (3)


Text

LICENSEE:

Southern Nuclear Operating Company, Inc. FACILITY:

Joseph M. Farley Nuclear Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF MARCH 4, 2015, CLOSED MEETING BETWEEN REPRESENTATIVES OF THE U.S. ARMY CORPS OF ENGINEERS, THE U.S. NUCLEAR REGULATORY COMMISSION, AND SOUTHERN NUCLEAR OPERATING COMPANY, INC. TO DISCUSS THE FLOODING ANALYSIS ASSOCIATED WITH JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 (TAC NOS. MF3037 AND MF3038) On March 4, 2015, the U.S. Nuclear Regulatory Commission (NRC) staff held a closed meeting with the U.S. Army Corps of Engineers (USAGE) and Southern Nuclear Operating Company, Inc. (SNC) to discuss the flooding hazard reevaluation (FHR) for Joseph M. Farley Nuclear Plant, Units 1 and 2 (Farley).

The meeting was held at USACE's offices in Mobile, Alabama. The closed meeting notice dated February 26, 2015, can be found in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML15055A562.

The participants in the meeting included the following individuals:

  • USAGE -Roger Kay, Chris Fassero, Niklas Hallberg, Randall Harvey, Micah Wiggins, Valerie Morrow, Bailey Crane
  • SNC -John Giddens, Ken Darby, Scott Walden, Stacey Graham
  • SNC contractors (AMEC FW) -Matthew Lehrer, Ben Zoeller
  • indicates individual participated via phone The purpose of the meeting was to discuss the portion of the FHR that the USAGE is performing under contract to the NRC for Farley. By letter dated September 26, 2013 (ADAMS Accession No. ML13274A343), SNC requested NRC assistance in having the USAGE perform a dam failure analysis to support SNC's development of an FHR in response to the March 12, 2012, request for information (ADAMS Accession No. ML12073A348).

The USAGE and NRC provided SNC with the preliminary results of the U$ACE dam failure analysis.

SNC presented the analysis of the watershed it has completed to the NRC and USAGE The NRC and USACE requested that SNC provide the information that it had developed related to topography near the Farley site. The licensee provided that information to the NRC by letter dated March 13, 2015 (ADAMS Accession No. ML15084A588). The NRC stated that the next action to be completed in the process is the transmittal of the final results to SNC. The NRC also stated that SNC could request another meeting with the NRC after receiving the results. The USACE was provided an opportunity to comment on this summary prior to its issuance and their comments were addressed in the final version of this summary. . . : Please direct any inquiries to me at or at Robert.Kuntz@nrc.gov.

c l4Uf for Docket Nos. 50-348 and 50-364 cc: Distribution via ListServ Robert F. Kuntz, Senior Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation The NRG stated that the next action to be completed in the process is the transmittal of the final results to SNC. The NRC also stated that SNC could request another meeting with the NRC after receiving the results. The USAGE was provided an opportunity to comment on this summary prior to its issuance and their comments were addressed in the final version of this summary. Please direct any inquiries to me at 301-415-3733 or at Robert.Kuntz@nrc.gov.

Docket Nos. 50-348 and 50-364 cc: Distribution via ListServ DISTRIBUTION:

PUBLIC JHMB R/F RidsNrrDorllpl2-1 Resource RidsNrrPMFarley Resource RidsNrrLASLent Resource CCook, NRO KSee, NRO SFlanders, NRO BHarvey, NRO ACampbell, NRO WSharp, NRO IRA by Victor Hall for! Robert F. Kuntz, Senior Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation ADAMS Accession Nos.: Meeting Notice ML15055A562, Meeting Summary ML15092A114

  • via e-mail OFFICE NRR/JLD/JHMB/PM NRR/JLD/JHMB/LA NRR/DORL/LPL2-1/PM*

NAME RKuntz SLent SWilliams DATE 04/02/15 04/02/15 04/08/15 OFFICE NRR/JLD/JHMB/BC NRR/JLD/JHMB/PM NAME MShams RKuntz DATE 04/10/15 04/10/15 OFFICIAL RECORD COPY