ML17244A373

From kanterella
Revision as of 06:15, 19 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Info Re Arrangement & Actuation Logic for 1C Safety Injection Pump.Reports That Logic Arrangement Meets Separation & Single Failure Criteria
ML17244A373
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/13/1979
From: White L
ROCHESTER GAS & ELECTRIC CORP.
To: Ziemann D
Office of Nuclear Reactor Regulation
References
TASK-06-07.A3, TASK-06-07.C1, TASK-6-7.A3, TASK-6-7.C1, TASK-RR NUDOCS 7902210190
Download: ML17244A373 (5)


Text

BEGULAT(INFORMATION.

DISTRIBUTION STEM (BIDS)i.ACCESSION NBB i790221 0190 DOC.DATE<79/02/I 3 NOTARI ZED~NO DOCKET iI'ACIL!50-244 Robert Emmet Ginna Nucl,ear Power Plant, Unit'I, Roches 05000244 AUTH.NAME AUTHOR AFFILIATION WITE,L.D.Rochester Gas 8 Electric Corp.RECI.P-NAME RECIPIENT AFFILIATI.ON ZIEMANN,D.L.

.Opevating Rectory Branch 2

SUBJECT:

Forwards info re arrangement 8, actuation logic for IC Safety 0 In)ection Pump.Reports that logic arrangement meets separation 8.single failure criteria.DISTRIBUTION CODE~AOOI S COP IFS RECEIVED-'LTR

~ENCL~SIZE>TITLE.~GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LIC NOTES:t~~~~<<~~L.ACTIONS I NTEBNAL~BEG I P I ENT ID CODE/NAME 05 BC eg~~03 G FILE 1.2 15 COBE.PERF BR 17 ENGR BR 19.PLANT SYS BR 21 EFLT TRT SYS COPIES LTTR ENCL I 2.I I.I'EG IP I ENT ID CODE/NAME 02 NRC PDR.14 TA/EDO I 6 AD S YS/P RO J 1.8 REAC SFTY BR 20 FEB 22 BRINKMAN COPIES LTTR ENCL I.I I I.I I'XTERNAL<

03 LPDR 23 ACBS ,I ,16 I 04 NSIC FEB'2 R S7$TOTAL NUMBER OF COPI ES REQUI BED!LTTB 38 ENCL 38 p a h l.k Ih' RQCHES7ZR GAS 4,'(0 ELI=CTRIC CORPOQ4TIO,'4 89"-457 4V."=i'I(!8 ROC'" S7""2, H.Y.146~9 i.CON Q.WH IT K.J R.VJCt PRC910!NT tg, yea gag~ogA grot sic 0<<6 z i 00 February 13, 1979 Director of Nuclear Reactor Regulation Attention:

Mr.Dennis L.Ziemann, Chief Operating Reactors Branch No.2 U.S.Nuclear Regulatory Commission Washington, D.C.20555 Sub'ect: SEP To ic VII-7,"Acce tabilit of Swin Bus Desi n"

Dear Mr.Ziemann:

The information in this letter is being provided in response to a request from a member of your staff relative to the actuation logic for the 1C Safety Injection Pump.The logic scheme for this pump is such that it can be automatically tied to either safeguards bus 14 or 16, the two redundant sources of emergency onsite power.However, no single failure can cause parallel operation of the two redundant buses, or cause both buses to be rendered inoperable.

1)Actuation logic for the lA, 1B, and 1C pumps is shown on elementary wiring diagrams 10905-73, 10905-74, and 10905-75, which were included in a comprehensive package of Ginna electrical drawings transmitted to you on November 22, 1978;2)The arrangement and actuation logic for pump'1C is essentially this: when a safety injection signal is generated, Agastat timer 2/SIP1C2 automatically ties SI pump 1C to bus 14 after 5 seconds by closing breaker 52/SIP1C2.

A normally closed contact (b)off breaker 52/SIPlC2 opens when the breaker closes.The opening of this contact will prevent.breaker 52/SIPlCl, which would energize SI pump 1C from safeguards bus 16, from closing.If Agastat timer 2/SIPlC2 failed, another redundant timer 2/SIP1Cl, would tie Pump 1C to bus 16 by closing breaker 52/SIP1C1 after an additional 2 seconds.A normally closed contact (b)off 52/SIP1C1 would open when this breaker closed, thus further ensuring VBOKZ%0(Ct O gC'p 4 P%w 4 r I4~ROCHESTER CAS AND ELECTRIC CORP.DATE February 13, 1979 To Director of Nuclear Reactor Regulation SHEET NO.2 that Pump 1C could not be tied to bus 14.This arrangement meets separation and single failure criteria, since it would require the simultaneous failure of a breaker and a timing relay (Agastat)to tie buses 14 and 16 together through SI Pump 1C.Very truly yours,