ML18012A128

From kanterella
Revision as of 07:07, 18 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards TS Bases Change for TS 3.2.3,which Incorporates Insp Guidance from NRC Procedure 61706, Core Thermal Power Evaluation.
ML18012A128
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/08/1996
From: Robinson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18012A129 List:
References
HNP-96-014, HNP-96-14, NUDOCS 9602130078
Download: ML18012A128 (3)


Text

CATEGORY j.REGULATOR INFORMATION DISTRIBUTION SFEM (RIDE)ACCESSION NBR:9602130078 DOC.DATE: 96/02/08 NOTARIZED:

NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROBINSON,W.R.

Carolina Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Docume'nt Control Desk)

SUBJECT:

Forwards TS bases change for TS 3.2.3,which incorporates inspection guidance fom NRC procedure 61706,"Core Thermal Power Evaluation." DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:

General Distribution NOTES:Application for permit renewal filed.DOCKET 05000400 05000400 E Q RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL: NOAC COPIES LTTR ENCL 1 1 1 1 6 6 1 1 1 1 1 1 1 1 FILE CE DRCH/HIC B NRR/DSSA/SRXB OGC/HDS2 NRC PDR RECIPIENT ID CODE/NAME PD2-1 PD COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 0 1 1 D N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL17 Carolina Power&Light Company PO Box 165 New Hill NC 27562 William R.Robinson Vice President Harris Nuclear Plant FEB 8 1996 SERIAL: HNP-96-014 United States Nuclear Regulatory Commission ATTENTION:

Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 TECHNICAL SPECIFICATION BASES CHANGE-RATED THERMAL POWER Gentlemen:

In accordance with 10 CFR 50.36(a), the Harris Nuclear Plant is proposing to implement a change to the Bases section for Technical Specification (TS)3.2.3.The proposed change is submitted in preparation for implementing a continuous calorimetric capability.

This change incorporates the inspection guidance from NRC Inspection Procedure 61706,"Core Thermal Power Evaluation," except that shifts at the Harris Nuclear Plant are 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.The attached retyped Bases pages B 3/4 2-5 and B 3/4 2-6 are provided for your information.

Questions regarding this matter may be referred to Mr.T.D.Walt at (919)362-2711.Sincerely, Enclosure LSR/lsr c: Mr.S.D.Ebneter Mr.N.B.Le Mr.D.J.Roberts i 3CCvg 9602i30078 960208 PDR ADOCK 05000400, P PDR State Road 1134 New Hill NC Tel 919362-2502 Fax 919362.2095 C~)i(4