ML18012A128

From kanterella
Jump to navigation Jump to search
Forwards TS Bases Change for TS 3.2.3,which Incorporates Insp Guidance from NRC Procedure 61706, Core Thermal Power Evaluation.
ML18012A128
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/08/1996
From: Robinson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18012A129 List:
References
HNP-96-014, HNP-96-14, NUDOCS 9602130078
Download: ML18012A128 (3)


Text

CATEGORY j.

REGULATOR INFORMATION DISTRIBUTION SFEM (RIDE)

ACCESSION NBR:9602130078 DOC.DATE: 96/02/08 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION ROBINSON,W.R. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Docume'nt Control Desk)

SUBJECT:

Forwards TS bases change for TS 3.2.3,which incorporates inspection guidance fom NRC procedure 61706, "Core Thermal Power Evaluation."

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES:Application for permit renewal filed. 05000400 E Q

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 1 LE,N 1 1 INTERNAL: ACRS 6 6 FILE CE 1 1 NRR/DE/EMCB 1 1 DRCH/HICB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS2 1 0 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL 17

Carolina Power & Light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant FEB 8 1996 SERIAL: HNP-96-014 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 TECHNICAL SPECIFICATION BASES CHANGE - RATED THERMALPOWER Gentlemen:

In accordance with 10 CFR 50.36(a), the Harris Nuclear Plant is proposing to implement a change to the Bases section for Technical Specification (TS) 3.2.3. The proposed change is submitted in preparation for implementing a continuous calorimetric capability. This change incorporates the inspection guidance from NRC Inspection Procedure 61706, "Core Thermal Power Evaluation," except that shifts at the Harris Nuclear Plant are 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

The attached retyped Bases pages B 3/4 2-5 and B 3/4 2-6 are provided for your information.

Questions regarding this matter may be referred to Mr. T. D. Walt at (919) 362-2711.

Sincerely, Enclosure LSR/lsr c: Mr. S. D. Ebneter Mr. N. B. Le Mr. D. J. Roberts i 3CCvg 9602i30078 960208 PDR ADOCK 05000400, P PDR State Road 1134 New Hill NC Tel 919362-2502 Fax 919362.2095

C

~ )

i( 4