Monthly Operating Rept for Mar 1999 for Shearon Harris Nuclear Power Plant.With 990413 Ltr
ML18016A910
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/31/1999
From: Alexander D, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-99-066, HNP-99-66, NUDOCS 9904190252
Download: ML18016A910 (11)


Text

CATEGORY j.REGULATORY INFORMATION DISTRIBUTIO SYSTEM (RIDS)ACCESQXVh~NBR:9904190252 DOC.DAT.OTARIZED: NO FACIL:5'0-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NICE.I AUTHOR AFFILIATION ROGERS,S.Carolina Power&Light Co.ALEXANDER,D.B.

Carolina Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET¹05000400

SUBJECT:

Monthly operating re t or Shearon Harris Nuclear Power Pla.With 990413 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED: LTR i ENCL)SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:Application for permit renewal filed.0500040(P RECIPIENT ID CODE/NAME LPD2-2 PD COPIES LTTR ENCL 1 1 RECIPIENT ID CODE/NAME LAUFER,R.COPIES LTTR ENCL 1 1 R INTERNAL: ACRS CENTER 1 1 1 1 1 1 AEOD/SPD/RRAB OC/DBA/PAD 1 1 1 1 EXTERNAL: LMITCO MARSHALL NRC PDR 1 1 1 1 NOAC D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 Carolina Power&Light Company Harris Nuclear Plant P.O.Box 165 New Hill NC 27562 APR 18"999 United States Nuclear Regulatory Commission ATTENTION:

Document Control Desk Washington, DC 20555 Serial: HNP-99-066 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 MONTHLY OPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power&Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of March 1999 is provided.Sincerely, ,@z~..B.Alexande Manager, Regulatory Affairs Harris Plant SGR Enclosure 1 C"t i~I~+)Q c: Mr.J.B.Brady-NRC Senior Resident Inspector Mr.R.J.Laufer-NRC Project Manager Mr.L.A.Reyes-NRC Regional Administrator 5413 Shearon Harris Road New Hill NC 9904i'70252

'si9033i PDR AMCK OS000400 R PDR P

Enclosure to Serial HNP-99-066 Shcct 1 of 4 cprcL co.RUN DATE 04/07/99 RUN TIME 19:38:13 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1 RPD36-000 OPERATING STATUS DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 1.UNIT NAME: HARRIS UNIT 1 2.REPORTXNG PERXOD: MARCH 99 3.LICENSED THERMAL POWER (MWT): 2775 4.NAMEPLATE RATING (GROSS MWE): 950.9 5.DESIGN ELECTRICAL RATING (NET MWE): 900.0 6.MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.MAX DEPENDABLE CAPACITY (NET MWE): 860.0 8.IF CHANGES OCCUR XN CAPACITY RATINGS (XTEMS 3 THRU 7)SiNCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED ZF ANY (NET MWE): 10.REASONS FOR RESTRICTION IF ANY: THIS MONTH YR TO DATE CUMUL ATIVE 11.HOURS IN REPORTING PERXOD 12.NUMBER OF HOURS REACTOR CRITICAL 13.REACTOR RESERVE SHUTDOWN HRS 14.HOURS GENERATOR ON LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEN.(MWH)17.GROSS ELEC.ENERGY GEN (MWH)18.NET ELEC.ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.UNXT CAP.FACTOR (USING MDC NET)22.UNIT CAP.FACTOR (USING DER NET)23.UNXT FORCED OUTAGE RATE 24.SHUTDOWNS SCHED.OVER NEXT 6 MONTHS 744.00 606.92.00 551.68.00 1436029.20 478486.00 441262.00 74.15 74.15 68.96 65.90 25.85 (TYPE, DATE, 104449.00 88224.21.00 87309.72.00 234569728.80 78068495.00 72846018.00 83.59 83.59 81.10 77.49 3.29 2160.00 1998.60.00 1924.11.00 5150004.84 1724458.00 1609146.00 89.08 89.08 86.63 82.78 10.92 AND DURATXON OF EACH): 25.ZF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 26.UNITS ZN TEST STATUS (PRZOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRZTZCALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16-9

Enclosure to Serial: HNP-99-066 Sheet 2 of 4 CP&L CO.PLANT PERFORMANCE DATA SYSTEM RUN DATE 04/07/99 APPENDIX B-AVERAGE DAILY POWER LEVEL RUN TIME 19:38:12 HARRIS UNIT 1 PAGE 1 RPD39-000 MARCH 1999 DAY AVG.DAILY POWER LEVEL (M('rE-NET)

DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 DAY AVG.DAILY POWER LEVEL (MWE-NET)10 12 13 15 878 877 871 878 881 872 207 120 763 875 878 219-35-35-36-37 17 18 19 20 21 22 23 25 26 27 28 29 30 31-36-38 707 834 865 868 864 868 873 873 871 871 873 870 t~)I)F Cy Ca'j C;f~i lq 1 f-A ,t gt (I'I f I'f(r~C A J r>>',~P.".V r.~

E Enclosure to Serial: HNP-99-066

-'.Sheq>3 of 4 UNIT NAME: Hams DATE: 04/0l/99 COMPLETED BY: S.G.Rogers TELEPHONE:

(9I9)362-2573 REPORT MONTH: March l999 UNIT SHUTDOWNS AND POPOVER REDUCf ION NUMBER DATE 03/07/99 TYPE I DURATION (HOURS)18.25 REASON 2 MErHOD OF SHUITING DOWN REACTOR 3 LICENSEE EVENT REPORT¹NA SYSTEM CODE 4 Hl COMPONENT CODE 5 VALVEX CAUSE AND CORRECTIVE ACrlON TO PREVENT RECURRENCE Phnt reduced power and came off line 3/7/99 due to loss of Steam Generator blowdown flow fmm B Steam Generator caused by failure of I BD-20.Repairs were made and phnt was returned to l00%power on 3/9/99 I l2:00 I F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Explain)B.Maintenance or Test C.Refueling D-Regulatory Restriction E-Operator Training 8c License Examination F-Administrative G-Operational Error (Exphin)H-Other (Explain)3 Method: I-Manual 2.Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Rcport (LER)File (NUREG-OI6 I)5 Exhibit I-Same Source J

UNIT SHUTDOWNS AND POWER REDUCfION Enclosure to-Serial: HNP-99-066

~Shee@4 of 4 UNIT NAME: Harris DATE: 04/01/99 COMPLETED BY: S.G.Rogers TELEPHONE:

(919)362-2573 REPORT MONTH: March 1999 NUMBER 99-004 DATE TYPE I 03/12/99 DURATION (HOURS)174.07 REASON 2 MEI'HOD OF SHUTTING DOWN REACTOR 3 LICENSEE EVENT REPORT¹99-004 SYSTEM CODE 4 CH COMPONENT CODE 5 INSTRU CAUSE AND CORRECTIVE ACfION TO PREVENT RECURRENCE Phnt received auto turbine/reac(or trip from high steam generator level in"C'team generator.

Repairs were made and phnt was returned to 100%power 3/22/99 8 05:00.I F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Exphin)B-Maintenance or Test C-Refueling D-Reguhtory Restriction E-Operator Training 8c License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3 Method: I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161) 5 Exhibit I-Same Source fC>>r, gs.I 4*I I i