Monthly Operating Rept for Apr 1999 for Shearon Harris Nuclear Plant,Unit 1.With 990513 Ltr
ML18016A958
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/30/1999
From: Alexander D, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-99-089, HNP-99-89, NUDOCS 9905200154
Download: ML18016A958 (7)


Text

carzaoar 1 REGULATO Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)II FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME AUTHOR AFFILIATION ROGERS,S.Carolina Power&Light Co.ALEXANDER,D.B.

Carolina Power&.Light Co.RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating re t Nuclear Plant, Unit..With'or Shearon Harris 90513 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED,:LTR I ENCL J SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:Application"for permit renewal filed.05000400 E RECIPIENT, ID CODE/NAME LPD2-2 PD INTERNAL: ACRS CENTER 0 COPIES LTTR ENCL 1 1 1 1 1'1 1 ,RECIPIENT ID CODE/NAME LAUFER,R.AEOD/SPD/RRAB OC/DBA/PAD COPIES LTTR ENCL 1 1 1 1 1 1 EXTERNAL: LMITCO MARSHALL NRC PDR 1 1 1 1 NOAC D'E NOTE TO ALL"RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 Carolina Power&Ught Company Harris Nocloar Plant P.O.Box 165 New Hill NC 27562 MAY 13 1999 United States Nuclear Regulatory Commission ATTENTION:

Document Control Desk Washington, DC 20555 Serial: HNP-99-089 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 MONTHLY OPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power&Light Company's Harris Nuclear Plant Technical Specification 6.9.L5, the report of operating statistics and shutdown experience for the month of April 1999 is provided.Sincerely, D.B.Alexander Manager, Regulatory Affairs Harris Plant SGR Enclosure Mr.J.B.Brady-NRC Senior Resident Inspector Mr.R.J.Laufer-NRC Project Manager Mr.L.A.Reyes-NRC Regional Administrator

~<~.:r'(.r:if'7905200i54 990430 PDR ADQCK 05000400 R PDR 5413 Shearon Harris Road Now Hill NC'l L 1~'7 Enclosure to Serial HNP-99-089 Sheet I of 2 CP&L CO.RUN DATE 05/05/99 RUN TIME 10:34:28 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1 RPD36-000 OPERATZNG STATUS DOCKET NO.050-400 COMPLETED BY SHEXLA ROGERS TELEPHONE (919)362-2573 1.UNIT NAME: HARRIS UNIT 1 2.REPORTING PERXOD: APRI'L 99 3.LICENSED THERMAL POWER (MWT): 2775 4.NAMEPLATE RATING (GROSS MWE): 950.9 5.DESIGN ELECTRICAL RATING (NET KfE): 900.0 6.MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.MAX DEPENDABLE CAPACITY (NET MWE): 860.0 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRXCTED XF ANY (NET MWE): 10.REASONS FOR RESTRICTION ZF ANY: THIS MONTH YR TO DATE CUMUL ATIVE 11.HOURS IN REPORTING PERIOD 12.NUMBER OF HOURS REACTOR CRITICAL 13.REACTOR RESERVE SHUTDOWN HRS 14.HOURS GENERATOR ON LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEN.(MWH)17.GROSS ELEC.ENERGY GEN (MWH)18.NET ELEC.ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILXTY FACTOR 21.UNIT CAP.FACTOR (USING MDC NET)22.UNIT CAP.FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 719.00 719.00.00 719.00.00 1990967.04 663910.00 625015.00 100.00 100.00 101.08 96.59.00 2879.00 2717.60.00 2643.11.00 7140971.88 2388368.00 2234161.00 91.81 91.81 90.23 86.22 8.19 105168.00 88943.21.00 88028.72.00 236560695.84 78732405.00 73471033.00 83.70 83.70 81.23 77.62 3.26 24.SHUTDOWNS SCHED.OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): 25.ZF SHUTDOWN AT END OF REPORT PERIOD, ESTXMATED DATE OF START UP: 26.UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERAT1ON):

FORECAST ACHIEVED INITIAL CRITICALITY ZNZTXAL ELECTRICITY COMMERCIAL OPERATION 1.16-9 4 p~4 l Enclosure to Serial: HNP-99-089 Sheet 2 of 2 CP&L CO.PLANT PERFORMANCE DATA SYSTEM RUN DATE 05/05/99 APPENDIX B-AVERAGE DAILY POWER LEVEL RUN TIME 10:34:28 HARRIS UNIT 1 PAGE 1 RPD39-000 APRIL 1999 DAY AVG.DAILY POWER LEVEL (MWE-NET)DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 DAY AVG.DAILY POWER LEVEL (MWE-NET)10 12 13 16 864 864 864 859 870 874 865 861 857 868 868 872 877 875 869 871 17 18 19 20 21 22 23 25 26 27 28 29 30 876 877 876 870 871 860 859 871 876 871 866 877 875 874 0 (o V I, s w&r..x~v.