ML18017A836

From kanterella
Revision as of 06:10, 18 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Rept for July 1999 for Shearon Harris Nuclear Power Plant.With 990811 Ltr
ML18017A836
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/31/1999
From: Alexander D, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-99-126, NUDOCS 9908170166
Download: ML18017A836 (5)


Text

ORY 1 REGULAT Y INFORMATION DISTRIBUTIO YSTEM (RIDS)FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina RUTH.NAME AUTHOR AFFILIATION ROGER,S.Carolina Power&.Light Co.ALEXANDER,D.B.

Carolina Power 8 Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET I 05000400 9 for Shearon Harris NOTES:Application for permit renewal filed.

SUBJECT:

Monthly operating re Ju Nuclear Power Pla.With 9'908 t DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR I ENCL X SIZE: TITLE: Monthly Operating Report (per Tech Specs)osooo4oo E RECIPIENT ID CODE/NAME LAUFER,R.COPIES LTTR ENCL 1 1 RECIPIENT ID CODE/NAME COPIES LTTR ENCL INTERNAL: ACRS OC/DBA/PAD RGN2 1 1 1 1 1 1 FILE Cgggg~KS DRAA/OERAB 1 1 1 1 EXTERNAL: LMITCO MARSHALL NRC PDR 1 1 1 1 NOAC 1 1 D'E N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OP COPIES REQUIRED: LTTR 9 ENCL 9

'c Carolina Power&Light Company Harris Nuclear Plant P.O.8ox 165 New Hill NC 27562 Serial: HNP-99-126 United States Nuclear Regulatory Commission ATTENTION:

Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 MONTHLY OPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power&Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of July 1999 is provided.Sincerely, D.B.Alexander Manager, Regulatory Affairs Harris Plant SGR Enclosure~Q'Mr.J.B.Brady-NRC Senior Resident Inspector Mr.R.J.Laufer-NRC Project Manager Mr.L.A.Reyes-NRC Regional Administrator 5413 Shearon Harris Road New Hill NC'st'st08'l70166 st90731 PDR'ADOCK 05000400 R","'PDR'

  • e f e e~

Enclosure to Serial HNP-99-126 Sheet 1 of 2 CPEcL CO.RUN DATE 08/06/99 RUN TIME 12:23:04 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1 RPD36-000 OPERATING STATUS DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 1.UNIT NAME: HARRIS UNIT 1 2.REPORTING PERIOD: JULY 99 3.LICENSED THERMAL POWER (MWT): 2775 4.NAMEPLATE RATING (GROSS MWE): 950.9 5.DESIGN ELECTRICAL RATXNG (NET MWE): 900.0 6.MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.MAX DEPENDABLE CAPACITY (NET MWE): 860.0 8.ZF CHANGES OCCUR XN CAPACITY RATINGS (ITEMS 3 THRU 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRXCTED ZF ANY (NET MWE): 10.REASONS FOR RESTRlCTION ZF ANY: THIS MONTH YR TO DATE CUMUL ATIVE r 11.HOURS IN REPORTXNG PERIOD 12.NUMBER OF HOURS REACTOR CRITICAL 13.REACTOR RESERVE SHUTDOWN HRS 14.HOURS GENERATOR ON LlNE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEN.(MWH)17.GROSS ELEC.ENERGY GEN (MWH)18.NET ELEC.ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.UNIT CAP.FACTOR (USXNG MDC NET)22.UNXT CAP.FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 744.00 744.00.00 744.00.00 2060091.18 673755.00 632165.00 100.00 100.00 98.80 94.41.00 5087.00 4925.60.00 4851.11.00 13252993.74 4402034.00 4126640.00 95.36 95.36 94.33 90.13 4.64 107376.00 91151.21.00 90236.72.00 242672717.70 80746071.00 75363512.00 84.04 84.04 81.61 77.99 3.18 24.SHUTDOWNS SCHED.OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): 25.I'F SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 26.UNITS 1N TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16-9 Enclosure to Serial: HNP-99-126 Sheet 2 of 2 CPEcL CO.PLANT PERFORMANCE DATA SYSTEM RUN DATE 08/06/99 APPENDIX B-AVERAGE DAILY POWER LEVEL RUN TIME 12:23:03 HARRIS UNIT 1 PAGE 1 RPD39-000 JULY 1999 DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 DAY AVG.DAILY POWER LEVEL (MWE-NET)DAY AVG.DAILY POWER LEVEL (MWE-NET)10 12 13 14 15 16 852 853 850 847 843 843 850 850 847 860 866 865 861 858 854 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 850 848 847 847 847 845 842 845 849 846 848 846 849 846