Monthly Operating Rept for Aug 1999 for Harris Nuclear Plant.With 990908 Ltr
ML18017A862
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/31/1999
From: Alexander D, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-99-137, NUDOCS 9909140188
Download: ML18017A862 (5)


Text

ATEGORY 1 FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina A/JTH.NPLME

.AUTHOR AFFILIATION ROGERS,S.Carolina Power&Li.ght Co.ALEXANDER,D.B.

Carolina Power E Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400

SUBJECT:

Monthly o eratin for Aug 1999 for Harris Nuclear Plan.z.th 9909 8 lt DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:Application for permit renewal filed.C A osooo4ooE RECIPIENT ID CODE/NAME LAUFER,R.COPIES LTTR ENCL 1 1 RECIPIENT ID CODE/NAME COPIES LTTR ENCL p'INTERNAL: ACRS OC/DBA/PAD RGN2 1 1 1 1 1 1 E CENTRE 1.1 ws RES/DRAA/OERAB 1 1 EXTERNAL: LMITCO MARSHALL NRC PDR 1 1 1 1 NOAC 1 1 D p i'C'E'NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083\TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 n4 C V~E~pg$~

Carolina Power 8 Light Company Harris Nuclear Plant P.O.Box 165 New Hill NC 27562 SEP 8 1999 Serial: HNP-99-137 United States Nuclear Regulatory'Commission ATTENTION:

Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 MONTHLY OPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power A Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of August 1999 is provided.Sincerely, D.B.Alexander Manager, Regulatory Affairs Harris Plant SGR Enclosure c: Mr.J.B.Brady-NRC Senior Resident Inspector Mr.R.J.Laufer-NRC Project Manager Mr.L.A.Reyes-.NRC Regional Administrator 5413 Shearon Harris Road New Hill NC 9 P09$.40i88 99083K PDR'ADQCK 05000400 R PDR I Enclosure to Serial HNP-99-137 Sheet 1 of 2 CP&L CO.RUN DATE 09/01/99 RUN TIME 11:12:36 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1 RPD36-000 OPERATING STATUS DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 1.UNIT NAME: HARRIS UNIT 1 2.REPORTING PERIOD: AUGUST 99 3.LICENSED THERMAL POWER (MWT): 2775 4.NAMEPLATE RATING (GROSS MWE): 950.9 5.DESIGN ELECTRICAL RATING (NET MWE): 900.0 6.MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.MAX DEPENDABLE CAPACITY (NET MWE): 860.0 8.ZF CHANGES OCCUR ZN CAPACITY RATINGS (ITEMS 3 THRU 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): 10.REASONS FOR RESTRICTION IF ANY: THIS MONTH YR TO DATE CUMUL ATIVE 11.HOURS ZN REPORTING PERIOD 12.NUMBER OF HOURS REACTOR CRITICAL 13.REACTOR RESERVE SHUTDOWN HRS 14.HOURS GENERATOR ON LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEN.(MWH)17.GROSS ELEC.ENERGY GEN (MWH)18.NET ELEC.ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.UNIT CAP.FACTOR (USING MDC NET)22.UNIT CAP.FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 744.00 744.00.00 744.00.00 2059751.52 674952.00 634095.00 100.00 100.00 99.10 94.70.00 5831.00 5669.60.00 5595.11.00 15312745.26 5076986.00 4760735.00 95.95 95.95 94.94 90.72 4.05 108120.00 91895.21.00 90980.72.00 244732469.22 81421023.00 75997607.00 84.15 84.15 81.73 78.10 3.16 24.SHUTDOWNS SCHED.OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): 25.IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 26.UNITS ZN TEST STATUS (PRIOR TO COMMERCIAL OPERATZON):

FORECAST ACHIEVED INITIAL CRIT1CALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16-9

~~~1~Enclosure to Serial: HNP-99-137 Sheet 2 of 2 CP&L CO.PLANT PERFORMANCE DATA SYSTEM RUN DATE 08/06/99 APPENDIX B-AVERAGE DAILY POWER LEVEL RUN TIME 12:23:03 HARRIS UNIT 1 PAGE 1 RPD39-000 JULY 1999 DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 DAY AVG.DAILY POWER LEVEL (MWE-NET)DAY AVG.DAILY POWER LEVEL (MWE-NET)10 13 15 16 852 853 850 847 843 843 850 850 844 847 860 866 865 861 858 854 17 18 19 20 22 23 25 26 27 28 29 30 31 850 848 847 847 847 845 842 845 849 846 848 846 849 846 844