ML18022B029

From kanterella
Revision as of 03:38, 18 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Rev 31 to PLP-201, Emergency Plan, IAW 10CFR50, App E.Changes Incorporated by Rev Includes Five Listed Categories
ML18022B029
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/16/1997
From: Robinson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18022B030 List:
References
HNP-97-184, NUDOCS 9709230195
Download: ML18022B029 (8)


Text

'CATEGORY 1 REUULAT INFORMATION DZSTRZBUTZONOISTEM (RIDE)ACCESSION NBR:9709230195 DOC.DATE: 97/09/16 NOTARIZED:

NO DOCKET¹FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME AUTHOR AFFILIATION ROBINSON,W.R.

Carolina Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION

/~~/~Document Control Branch (Document Control Desk)~

SUBJECT:

Forwards rev 31 to PLP-201,"Emergency Plan." W/summary of changing 6 filing instructions.

'ISTRIBUTION CODE: A045D COPIES RECEIVED:LTR I ENCL g SIZE: 4 t5 (TITLE: OR Submittal:

Emergency Preparedness Plans, Implement'g Procedures, C+NOTES:Application for permit renewal filed.05000400~RECIPIENT ID CODE/NAME PD2-1 LA ROONEYFV INTERNAL: AEOD/HAGAN,D NRR/DRPM/PERB EXTERNAL: NOAC COPIES LTTR ENCL 1'1 1 1 1 1, 1 1 1 RECIPIENT ID CODE/NAME PD2-1 PD CENT 1 UDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL 1 1 2 2 1 1 1 1 DE NOTE TO ALL"RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS-OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 n t k 1<

Carolina Power&Light Company PO Box 165 New Hill NC 27562 William R.Robinson Vice President Harris Nuclear Plant SEP 16 1997 SERIAL: HNP-97-184 10 CFR 50, Appendix E United States Nuclear Regulatory Commission ATTENTION:

Document Control Desk Washington, DC 20555 SHEARON HARRIS PIUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 CHANGE TO EMERGENCY PLAN (REVISION 31)

Dear Sir or Madam:

In accordance with 10 CFR 50, Appendix E, Carolina Power&Light Company hereby transmits one copy of Revision 31 to the Shearon Harris Nuclear Power Plant Emergency Plan (PLP-201).

This revision replaces all pages of the previous revision, except for the drawings and aperture cards.The changes incorporated by Revision 31 to the Emergency Plan include the following five (5)categories:

1.ERO Position Related-The description of responsibilities for the majority of the positions were minimized.

The Emergency Response Organization (ERO)Organization Charts were modified to show slight changes in chain-of-command.

2.Protective Actions-These changes were made to more accurately reflect the guidance provided in EPA-400.Recovery-These changes involve a complete rewrite of the recovery section.General Information

-These changes add or delete general information such as numbers of NRC personnel reporting to the EOF, agreement expiration dates, and so forth.5.Clerical-These changes involve revisions to titles, references, or clerical changes to Table of Contents, and so forth.A description of each change is included in the enclosure to this letter.The changes are listed by number in the order that the change occurs in the Emergency Plan.The enclosure provides a list of the changes grouped numerically into the five categories listed above.9709~~0~9S 97O9~6Ig PDR ADOCK 05000400t F PDRQ State Road 1134 New Hill NC Tel 919362-2502 Fax 919362-2095 e Document Control Desk SERIAL: HNP-97-184 Page 2 In accordance with 10 CFR 50.54(q), each of these changes has been evaluated by the plant staff as not decreasing the effectiveness of the Emergency Plan.Questions regarding this matter may be referred to Mr.J.H.Eads at (919)362-2646.Sincerely, AEC/aec Enclosure c: Mr.J.B.Brady (NRC Senior Resident Inspector, HNP)Mr.L.A.Reyes (NRC Regional Administrator, Region II)Mr.V.L.Rooney (NRR Project Manager, HNP)-two (2)copies of Emergency Plan ENCLOSURE TO HNP 97-184

SUMMARY

OF CHANGES IN PLP-201 REV.31 Below is a list of the changes grouped numerically into the five (5)change categories:

ERO Position Related 2, 3, 4 Protective Actions 6,7,8 Recoverer 10, 11 General Information 5, 13, 14 Clerical 1,9,12,15 Item~Pa e~Chan e 1.Pages 2-9, Table of Contents, These were updated to reflect changes made in this List of Figures and List of Tables revision.Pages 24-35, Sect.2.4, Assignment of Responsibilities This Section was completely rewritten and reformatted.

The various positions in the ERO were sorted by emergency facility and chain-of-command.This was a more logical sequence of presentation which now parallels Tables 2.2-1 and 2.4-1.In addition, detailed descriptions of the duties of the positions were deleted with a few exceptions (such as, Site Emergency Coordinator and Emergency Response Manager).The detailed descriptions of responsibilities were better placed in the implementing procedures actually used by the ERO members.For the majority of the positions a brief description of location, who they report to and primary responsibilities has been substituted.

Page 1 of 3 ENCLOSURE TO HNP 97-184

SUMMARY

OF CHANGES IN PLP-201 REV.31 Item~Pa e 3.Page 39, Figure 2.2-1~Chan e The following changes were made to this table: The position of Asst.Radiation Control Director (RCD)was deleted due to the addition in the TSC of display systems and a PC for the RCD's use.2.The position of TSC Computer Support was renamed TSC Telecom/Computer Support and now reports to the Communications Director rather than to the Technical Analysis Director.4.Page 40, Figure 2.4-1 The following changes were made to this table: 1.The News Coordinator now reports to the ERM, rather than the Communications Manager, and coordinates activities with the Site Media Manager (when that position is active).2.The Emergency Communicator-Corp.

Comm./JIC now reports to the News Coordinator rather than to the Communications Manager.3.The EOF Senior Reactor Operator now reports to the ERM rather than to the Technical Analysis Manager.4.The EOF ERFIS Operator now reports to the EOF SRO rather than to the Technical Analysis Manager.5.The JIC Director position no longer acts an intermediary for the Company Spokesperson.

The table now reflects this change.5.Page 44, Step 3.5.1.b."...including 10 NRC personnel." was changed to"...including 14 NRC personnel." to more accurately reflect the size of the NRC Site Response Team.Page 2 of 3

~~ENCLOSURE TO HNP 97-184

SUMMARY

OF CHANGES IN PLP-201 REV.31 Item~Pa e 6.Page 57, Sect.4.5.1~Chan e This section on Protective Action Guides (PAGs)was completely rewritten to more closely match the intent of guidance provided in EPA-400-R-92-001.

7.Page 57, Sect.4.5.2 This section on Protective Action Recommendations (PARs)was completely rewritten to more closely match the intent of guidance provided in EPA-400-R-92-001.

8.Page 58, Sect.4.5.3 This is a new Section.The"old" Section 4.5.3 was renumbered 4.5.4..9.Page 72, Table 4.5-1 This table was deleted since the information is now contained in 4.5.1.1.10.Pages 86-90, Sects.6.1-6.4 These sections on Recovery were completely rewritten.

11.Page 93, Figure 6.2-1 This Figure of the Recovery Organization was deleted since the new organization chart was incorporated into Section 6.3.12.Page 94, Item 7.0.16"Old" Item 16, IE Notice No.83-28, was deleted as no longer necessary.

13.Page 95, Annex A, Item 3"Expires 02-01-97-No Reconfirmation Necessary" was updated to"01-29-97, Expires 01-31-02." 14.Pages 110-115, Annex D The NUREG-0654 cross reference was updated to reflect the rewrite of Section 2.0.15.Page 116, Annex E The Title of PEP-440 was changed from"Tone Alert radios" to"Public Alerting and Notification System".Page 3 of 3 FILING INSTRUCTIONS FOR PLP-201 REVISION 31 Replace all pages in PLP-201, except for the drawings and aperture cards.EAL Flowpath Side 1 and Side 2 and ANNEX H were not revised with this revision.