ML18031A027

From kanterella
Revision as of 02:33, 18 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Responds to 780920 NRC Request for Info & Forwards Sched for Kwu T-quencher Prog
ML18031A027
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 10/27/1978
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Parr O
Office of Nuclear Reactor Regulation
References
NUDOCS 7811170123
Download: ML18031A027 (7)


Text

Sus uehanna 1/2DOC DATE: 781027 ACCESSION NBR: '7811170123 COPIES RECEIVED=DOCKET NBR: RECIPIENT:

D~ORIGINATOR:

COMPANY NAME-PA Pwr&Li ht

SUBJECT:

ENCL 1 LTR 1 SIZE: 2 for KWU T-encher ro Res onds to 780920 NRC request for info 6 forwards sched DISTR7¹i~V?nN COnE>SOOt DISTR TRAIT Ig'4 Tl TLE I pSA~/FSAR 4'~oTS ANO RELATED cARESpONOENCE NOTARIZED NAIF ASST@7'R CH7FF pagd MrR LIC A NRC Pan I 4 E QFl D OPERATOR l JC HH E>ERGFNCY PLA'A8 nfRECTrlR>>RP"TPC Ao Fnp FNr,~ECH VNG SR STRUCTIIRAL ENG RR~ATERTAL FNI HR An FOR RE'AC SFTY F NCL'P LTR Pal Y LTR ONL Y'A/FNCL I 7R (1N)Y</E'4CL'w/ENCL>/2 E>CL LTR ONLY w/ENCL w/ENCL w/ENCL LTR l>NL Y LTR'NL Y l.TR ONLY</ENCL W/ENCL</2 ENCL LTR I'lNL Y.FOR ACTION~VASSALLO~LNRO3 BC s MINER~LWR03 LA NOV Ro 19<~)NOTES: Send.ISE 3cys, FSAR 6 all AMDTS 5 f IMAGE'DOCKET NBR: RECIPIENT:

ORIGINATOR:

'I REGULATO ,INFORMATION DISTRIBUTION YSTEM DOC DATE: ACCESSION NBR: COPIES RECEIVED:

SUBJECT:

LTR SIZE: ENCL FOR ACTION REACTna SVSTE~S BR ANALYiTS SR CORE CPAFnAt~ANCE HR AD FUA PLANT AYSTEwS AUX?LTAAY SYS Sa CONTA th'~E~'T SYSTEMS I L C-SYSTEMS RA POWER SYS HR AD FOA SITF, TFC~AD F'nA SiTE ANlvS ACCIDPhIT~NALYS'lS EFFI.UENT TREA,T SYS RAD ASSESSHFNT HP.KTRKwnnD GEOSCT f NCES HR I.PDR-TE'RA NSTC" ACRS w/ENCL w/ENCL w/ENCL LTR ONLY'/ENCL w/ENCL w/FNCL w/5 ENCL lTR ONI.Y I/ENCL"/FNCL W/EHCL w/ENCL w/ENCL w/ENCI.W/ENCt w/ENCL w/16 ENCL TOTAL NUMBER OF COPIES REQUIRED'TR EhiCL NOTES:

P~Pg, PP[~r~)~y;,I'I~~,'~

I,II I;TWO NORTH NINTH STREET, ALLENTOWN, PA.18101 PHONE((2)S)821-SISI October 27, l978 Mr.Olan D.Parr Lightwater Reactors Branch No.3 Division of Project Management U.S.Nuclear Regulatory Commission Washington>

D CD 20555 SUSQUEHANNA STEAM ELECTRIC STATION PPK-ISU T-QUENCHER PROGRAM STATUS ER 100t50 FILE 172, 840-2 PLA-297

Dear Mr.Parr:

Attached is-the status of PPK-KWU T-quencher program.Submittal of this information was requested by Dr.Mattson during the Staff's September 20, 1978 meeting with the members of the Mark II Owners Group executive committee.

Very truly yours, N.W.Curtis Vice President-Engineering Ee Construction DFR:GAF Attachment Copy to: Dr.Rodger Mattson U.S.Nuclear Regulatory Commission Washington, D.C.20555~sgyy vD L3-T PENNSYLVANIA POWER 8 LIGHT COMPANY

0 R N 1/78 SUBMITTAL OF THE TWENTY REPORTS WHICH FORM THE BASIS FOR THE'KNU T-9UENCHER DESIGN 0/78 ICBNITTAL OF THE SUSQUEHANNA STEAN ELECTRIC STATION R WHICH INCLUDES THE BASIC DESIGN LOAD SPECIF I CA" TION FOR THE Kdo T-qUENCHER 5/78 7/78 2/79 KARLSTEIN VERIFICATION TESTS BEGIN KARLSTEIN VERIFICATION TESTS COMPLETED KARLSTEIN TEST REPORT TO BE SUBMITTED NOTE: THIS MAY BE NORE THAN ONE DOCUMENT I