ML18022A883

From kanterella
Revision as of 22:05, 5 May 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Change 3 to Rev 2 to Plant Emergency Procedures (Pep) PEP-100,Change 3 to Rev 5 to PEP-101,including One Oversize Drawing,Rev 0 to PEP-374 & Rev 18 to PLP-201, Emergency Plan, Page 2-9a
ML18022A883
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/08/1992
From: RICHEY R B
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18010A492 List:
References
CON-NRC-771 NUDOCS 9201130265
Download: ML18022A883 (17)


Text

ACCELERATED DI TIUBUTION DEMONS~TION SYSTEM P 0a PP REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9201130265 DOC.DATE: 92/01/08 NOTARIZED:

NO DOCKET 40 FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME AUTHOR AFFILIATION RICHEY,R.B.

Carolina Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (D'ocument Control Desk)

SUBJECT:

Forwards Change 3 to Rev 2 to Plant Emergency Procedures I (PEP)PEP-100,Change 3 to Rev 5 to PEP-101,including one oversize drawing,Rev 0 to PEP-374&Rev 18 to PLP-201, D"Emergency Plan," Page 2-9a.DISTRIBUTION CODE: A045D COPIES RECEIVED:LTR I ENCL P SIZE:+TITLE: OR Submittal:

Emergency Preparedness Plans, Imp ement'g Procedures, C NOTES:Application for permit.renewal filed.05000400 A RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: AEOD/DOA/IRB NUDOCS-ABSTRACT EXTERNAL: NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME MOZAFARI,B.

NRR/DREP PEPB9D BE~-0 NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISI'RIBUTION LIPID FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 8 ENCL 8 D D (I k n C: 1 f CHILL Carolina Power&Light Company P.O.Box 165~New Hiil, N.C.27562 R.B.RICHEY Vice President Harris Nuctear Project JAN 8 19m.Letter Number: HO-910251 (0)Document Control Desk United States Nuclear Regulatory Commission Washington, D.C.20555 NRC-771 CAROLINA POWER AND LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400 LICENSE NO.NPF-63 Gentlemen:

In accordance with 10CFR50, Appendix E, Carolina Power 6 Light Company hereby transmits one copy each of recent revisions to the Shearon Harris Nuclear Power Plant emergency procedures.

A list of the revisions to the plant emergency procedures is also enclosed (Attachment 1).Very t:ruly yours, R.B.Richey Vice President Harris Nuclear Project MGW: kj c Enclosure cc: Mr.S.D.Ebneter (NRC-RII)(w/two copies of procedures)

Ms.B.L.Mozafari (NRC)Mr.J.E.Tedrow (NRC)MEM/H0-910251.0/1/OS1 9201130265 920108 PDR'DOCK 05000400 F PDR Li t ATTACHMENT 1 CAROLINA POWER AND LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT-UNIT 1 REVISIONS TO PLANT EMERGENCY PROCEDURES PROCEDURE NUMBER TITLE DATE PEP-100 Rev.2 Change No.3 Emergency Action Levels Users Guide 12/15/91 PEP-101, Rev.5 Change No.3 Emergency Classification and Initial Emergency Actions 12/15/91 PEP-374, Rev.0 Radiological Controls for, the Emergency Operations Facility 12/09/91 PLP-201, Rev.18 Page 2-9a only Emergency Plan (Note: Page was inadvertently omitted from PLP-201, Rev.18 transmitted August 2, 1990.Please insert page accordingly.)

07/27/90 MEM/H0-910251.0/2/Osl 4

(1)2)(3 eason or t e ange che ADVANCE CEANGE POEN~~//g/g~Vol~'art 5 Proc.No.F'E F'00 Rev.2, Change 0 Procedure Title c foh.cue.5 sers u>'d8.(4)scrxptxon o t e ange J c nron.re'on u r.0 s ee, (5)Nuehe of Procedure pages Attached (6)Verify at the Technical Specifications Procedur Cross Reference, FSAR Coamitme Cross Reference and ANSI 18'Commit nt Cross Reference (AP-005)ve been reviewed and all discrepanc'es found have been resolved.C arne an xgnature gate OCT 1 6 199p If a revision is equired to the Techn cal Specification Procedure Cross Reference, verify hat a Task Change equest Form (PLP-103)has been submitted for Mana ent Approval~-Date gA egu atory omp nance ote: reparer may i not applicable (7)Submitted for Approval: rxgxnator s arne Date OCT 1"'99p (8)CPH Safety Review is.'irc o ke.One requi and attached/not required gate OCT 1 6 199p roce ure oor (9)Recommended for A roval: r s arne n xgnature Qualified Tec cal Reviewer Quali:fied T chnical R viewer Quality ssurance Ori nator's Supervisor nx,t ()Final'Approval

-Approved By: rve~c.7C&'AGRIC, arne xt e Remarks.'rne an C, Gf'n.1gna arne an xgnat re arne an xgnature signature am an x na e C lZ.Gf'bgo arne an xgnature OCT 16 1ggp~ate/8/~d4~ate mvE Oy~8~>yg/o-/<Ho ate (Form AP-007-4-8) on>890 HNP"

~.$,~

OS4 List of Effective Pa es~Pa e!.%e'Ii (-'wp."eJ'meepfwl e, f~~ma.I ep tfwc*';rreee'=.;~eee; e~+v~%~~ggwn~ve

'ree~+g~i~~v~I~ee''e".>r-" eeeee r.".~":-)i i~e".-r Ie"'-tire'w'v"i"-+++'z~~>>

~'R'e~e;i II I I r l r r,~Revision NI pi ,I r e)IV, I I,i 1-2 3 4-17 17a, 17b 17c, 17d 2 AC-2/1, AC-2/2 2 AC-2/1 AC-2/2 e e.lf<>tt">>w-~i~&~ADVANCE CHANGE FORM i~~a-p-(2)Procedure Title a s5 I'c<<R Pert Rev.~Chacga d n/r cS (3)eason or t e ange v f e,c ac r Iq/cc ef fcf'P-Clf'n.a'&AS L I LV AI tecIR ppqf.n orccclq"<<)'4 F ytqRr," c)r" 7h<<efr c sre/yrwd r//'/I recJ"c'csgh'~pen

~C)$n r t E L)(cth.I>>cue

" Ccrfec e)s t c t rhftt>IA.urt(~lost orq s'Iqt/Id&cr (8)Neater of Procedure pages Attached R (6)Verify that the Technical Specifications Procedure Cross Reference, FSAR Coamitment Cross Reference and ANSI 18.7 Commitment Cross Reference (AP-005)have been reviewed and all discrepancies found have been resolved.(4)escrxptzon o t e ange~-/yd/,e wh/c/sA'"C'cnI'rtos'~

AC//'cn'o>>q<<III ton.Cether't(V<<'

for)IO tvtlnq flttds 5 t Ie Frster s EIAL<<z)(ch.'R<<I<<.'<<

'A<<sn s'gtf'~kar r/7 Date 2-//-1/arne an xgnature If a revision is required to the Technical Specification Procedure Cross Reference, verify that a Task Change Request Form (PLP-103)has been submitted for Management Approval..

QA egu atory omp rance ote: reparer may applicable 1 not Date 2,-II-c(I (7)Submitted for Approval: T N'Icckel" rxgxnator s arne (8)CP&i Safety Review is: (Circ(a Cce)requ'red d attached/uot required~ocker roce ure oor xn r s arne an (9)Recommended for Approval: signature Date 2-//-q l Qualified Technical Reviewer Quali.fied Technical Reviewer Qua1.ity Assurance 8 Originator's Supervisor Fl fs F'rokecfl'on.

nest M t/oker.M/3@c:M arne an C R.Gs'iso n arne an xgnature arne an xgnat 8ibs c.i (arne an agnature gA arne an xgnature 2-/-//ate gA~ate~pe,/ply~ate Remarks.'rne ate I G-w (10)Final'pproval

-Approved By.s x natur EFFECT f VE FEB f j f9gf Z.-/2-v/~ate (Form AP-007-4-8) hav'n no r'~acf done urI"e~</Iv 4 Jue.Ho r I/e d Auntie ha lr'y Bo rnIpac o>>I Fife P>>orwcr>>'o>>p

>>I~I I 4 OS4 t l List of Effective Pa es~Pa e 1, 2 4-8 10 Revision AC-5/1, AC-5/2 AC-5/1, AC-5/2 PEP-101 Rev.5 Page 3 of 10

))~l.~