Notifies That Intent of Interim Actions Specified in Encl 2 to NRC 801222 Ltr Re Control of Heavy Loads Have Been Implemented.Addl Three Months,Until 810922,requested in Order to Respond to Section 2.1 Re Deviations
ML17258B150
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/22/1981
From: MAIER J E
ROCHESTER GAS & ELECTRIC CORP.
To: CRUTCHFIELD D
Office of Nuclear Reactor Regulation
References
NUDOCS 8106300406
Download: ML17258B150 (6)


Text

REGULATORY ORMATION DISTRIBUTION SYSOM (RIBS)ACCESSION NBR: 8106300006 DOC~DATE: 81/06/22 NOTARIZED:.

YES DOCKET tl FACIL'50-244 Robert Emmet'inna Nuclear Plant~Unit 1P Rochester>>

G 05000244 AUTH,NAMEi AUTHOR AFFILIATION MAIER<J,E~Rochester Gas 8 Electr ic Corp.RECIP~NAME', RECIPIENT AFFII IATION CRUTCHFIELD<D, Operating Reactors Branch 5

SUBJECT:

Notifies that intent of interim'ctions" specified in Encl 2'o NRC"'01222 ltr re control of heavy loads have been: implemented.Addi three months~until 810922irequestedI in order to respond to Section 2'.1 re deviations..

DISTRIBUTION CODE;: A033S COPIES RECEIVED:LTR

'NCL g SIZE: TITLE': Conrtol of Heavy Loads Near Spent: Fue'I (USI A-36)Operat7ng Reactor NOTES:1 copy:SEP Sects Ldr, 05000240 RECIPIENT ID CODE/NAMEY ACTION: ORB 05 BC COPIES LTTR ENCL REC IP IENT ID CODE'/NAME CLEMENSONtF

~00 COPIES LTTR ENCL INTERNAL: A/D CORE'CS11~NRC: PDR 02 RAD ASSESS BR10.REQUAPGB'9 1=.1 1 1 IEE REG.F 07 BR 12'1 EXTERNAL: ACRS NSIC 13-06 16 1 1 LPDR 03 JUL 0 S 198l)y 0 TOTAL NUMBER OF COPIES REQUIRED: LTTR Pf ENCL Pf P f II~~~I I t 1 CI U kg e J~I II f IIIIIIIIIIIIII IIIIIIIII~'IIIIIIIIIIII i!IIIIIIIII~!~raid(/E~

IIIIIIIIIIIII

~;-...(ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y.14649 JOHN E.MAIER VICE PRESIDENT TELEpHON C AREA CODE TIE 546.2700 June 22, 1981 Director of Nuclear Reactor Regulation Attention:

Mr.Dennis M.Crutchfield, Chief Operating Reactors Branch No.5 Division of Licensing U.S.Nuclear Regulatory Commission Washington, DC 20555 JUN 2 9 1981~)2 gDIIIIIIISSPS y E NIICLEAII QEQIILh

Subject:

Control of Heavy Loads R.E.Ginna Nuclear Power Plant Docket No.50-244

Dear Mr.Crutchfield:

This letter is in response to a letter dated December 22, 1980 from Darrell Eisenhut, USNRC, regarding control of heavy loads.Since receipt of the letter, the intent of interim actions specified in Enclosure 2 to Mr.Eisenhut's letter have been implemented.

These have included definition of safe load paths, plant procedure development and implementation, crane operator training and qualification, and crane inspection testing and maintenance.

In addition, special attention, as defined in Enclosure 2 was given to handling of heavy loads over the core during our recent, refueling.

Mr.Eisenhut's letter required submittal of a substantial amount of information at this time.Due to the magnitude of the evaluations required and due to the support required for our recent refueling outage, we have been unable to complete the evaluations.

Specifically, we require an additional three months, until September 22, 1981 to respond to Section 2.1 of Enclosure 3 to Mr.Eisenhut's letter.The requested confirmation of implementa-tion of modifications and the justification of deviations, which was requested, is directly related to the evaluations required by Sections 2.2, 2.3 and 2.4 of Enclosure 3.Since response to these three sections is not due for some time yet, we will defer assessment of modifications and justification of'eviations until that time.

(h A b ROCHESTER GAS AND ELECTRIC CORP.DATE June 22, 1981 To=-Mr.Dennis M.Crutchf ieldSHEET NO.Until the completion of our evaluations and implementation of any corrective actions which may be required, the implementation of the interim actions provides compensatory safety actions.Very truly yours, Subscribed and sworn to me on this~4~day of June 1981.SHARON G.CAVALER$NOTARY PUBLIC, State of N.Y., Monroe County My Commission Expires March 30le&

k e'