MONTHYEARML18215A1872018-06-29029 June 2018 Request for Partial Site Release Project stage: Request LIC-18-0030, Request for Partial Site Release Phase 22018-11-12012 November 2018 Request for Partial Site Release Phase 2 Project stage: Request ML19070A2462018-11-28028 November 2018 OPPD Presentation on Fort Calhoun Station Request for Partial Site Release Project stage: Request ML19070A3072018-11-28028 November 2018 FCS Partial Site Release Meeting Summary Project stage: Request ML19003A1172019-01-0303 January 2019 Transcript of Public Meeting Re Request by the Omaha Public Power District (OPPD) for a Partial Site Release from NRC Regulatory Control of the Fort Calhoun Station, Blair, Nebraska, November 28, 2018, Pages 1-27 Project stage: Request ML19065A2562019-02-27027 February 2019 Unit 1: Final Confirmatory Survey Summary and Results for the Non-Impacted Land Areas (License DPR-40, Docket No. 50-285) Project stage: Request ML19071A0302019-03-13013 March 2019 Summary of Public Meeting to Describe Requests Omaha Public Power District for Partial Site Release from NRC Control of the Fort Calhoun Station Project stage: Request ML19074A3012019-04-10010 April 2019 Approval of Partial Site Release Phase 1 and Phase 2 Project stage: Other 2019-01-03
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML19071A0302019-03-13013 March 2019 Summary of Public Meeting to Describe Requests Omaha Public Power District for Partial Site Release from NRC Control of the Fort Calhoun Station ML19070A3072018-11-28028 November 2018 FCS Partial Site Release Meeting Summary ML17167A2622017-06-27027 June 2017 Summary of 5/31/2017 Meeting at Double Tree Hotel, Omaha, Ne, to Discuss and Accept Comments Regarding the Fort Calhoun Station Post-Shutdown Decommissioning Activities Report ML16298A2912016-10-27027 October 2016 Summary of Presubmittal Teleconference with Omaha Public Power District to Discuss Decommissioning Licensing Actions for Fort Calhoun Station, Unit No. 1 ML16259A1132016-09-20020 September 2016 9/13/16 Summary of Presubmittal Teleconference with Omaha Public Power District to Discuss License Amendment Request for Use of a Different Methodology for Evaluating Certain Class 1 Structures at Fort Calhoun, Unit 1 ML16036A3502016-02-23023 February 2016 2/3/16 Summary of Teleconference Meeting with Omaha Public Power District to Discuss Proposed Request to Revise Table S-2, Plant Modifications Committed, for the NFPA 805 Amendment Issued 6/16/14 for Fort Calhoun Station, Unit 1 ML15114A3782015-05-0707 May 2015 4/23/15 Summary of Pre-application Meeting with Omaha Public Power District, Proposed License Amendment Requests to (1) Reclassify Systems Based on ANSI 58.14 and (2) Adopt American Concrete Institute Code ACI-318 (1971) for Fort Calhoun St ML15105A4702015-04-15015 April 2015 Summary of Category 1 Meeting Between NRC and Omaha Public Power District to Discuss Transition to the Normal Reactor Oversight Process and Actions for Continued Sustained Performance Improvements ML14344A0872014-12-19019 December 2014 12/2/2014 Summary of Meeting with Omaha Public Power District to Discuss Containment Internal Structures at Fort Calhoun Station, Unit 1 ML14230A0802014-08-21021 August 2014 Memorandum to File, Verbal Granting of Relief Request RR-14, Proposed Alternative for Temporary Acceptance of a Pin Hole Leak in Raw Water System 20-Inch Elbow Located in Room 19 of Auxiliary Building ML14175A5182014-08-11011 August 2014 Summary of Category 1 Public Meeting with Exelon to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons Learned Near-Term Task Force Recommendation 2.1, Seismic ML14192A9822014-08-0606 August 2014 Summary of Meeting with Omaha Public Power District to Discuss License Amendment to Revise TS 2.0.1, General Requirements, and TS 2.7, Electrical Systems, for Inoperable System, Subsystem, or Component Due to Inoperable Power Source ML14163A0022014-06-16016 June 2014 Summary of Audit Conducted March 5-9, 2012, Request to Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML14156A2832014-06-16016 June 2014 Summary of 5/22/2014 Meeting with Omaha Public Power District and Nebraska Public Power District to Discuss Flooding Hazard Evaluation Extension Requests for Fort Calhoun, Unit 1, and Cooper Nuclear Station ML14147A3592014-06-0909 June 2014 Summary of Meeting Between Army Corps of Engineers, NRC, Omaha Public Power District, and Nebraska Public Power District - Discuss Flooding Analysis Associated with Fort Calhoun, Unit 1 and Cooper Nuclear Station ML14139A3582014-06-0505 June 2014 5/9/2014 Summary of Meeting with Omaha Public Power District and Nebraska Public Power District to Discuss Flooding Hazard Evaluation Extension Requests for Fort Calhoun, Unit 1, and Cooper Nuclear Station ML14139A3442014-05-29029 May 2014 Summary of Closed Meeting Between Representatives of the Nuclear Regulatory Commission, Omaha Public Power District and Nebraska Public Power District to Discuss Flooding Analysis ML14143A2892014-05-23023 May 2014 May 13, 2014 Summary of Meeting with Omaha Public Power District Presented the Status of Inspection Manual Chapter 0350 Oversight Activities at Fort Calhoun Station ML14065A2532014-03-0505 March 2014 Summary of Category 1 Public Meeting with Omaha Public Power District to Discuss Status of Oversight Activities at Fort Calhoun Station ML14031A1622014-02-10010 February 2014 Summary of Meeting Between Army Corps of Engineers, NRC, Omaha Public Power District, and Nebraska Public Power District - Discuss Flooding Analysis Associated with Fort Calhoun, Unit 1 and Cooper Nuclear Station ML13339A7242013-12-0505 December 2013 Meeting Summary Slides ML13338A2992013-12-0202 December 2013 Summary of Public Meeting in Omaha, Ne ML13220A7792013-08-0808 August 2013 Summary of July 24, 2013 Meeting with Omaha Public Power District ML13134A1862013-06-0303 June 2013 4/22/2013 - Summary of Meeting with Omaha Public Power District - Potential License Amendment Requests for Fort Calhoun, Unit 1 Related to Flood Protection for Raw Water System, Tornado Missile Protection, Piping/Code Use, and Alternate Sei ML13144A7762013-05-24024 May 2013 Summary of Meeting with Omaha Public Power District on Preliminary Results of a Manual Chapter 0350 Team Inspection ML13114A8812013-04-25025 April 2013 4/22/2013 - Summary of Closed Meeting with Omaha Public Power District to Discuss Flooding Issues Associated with Fort Calhoun, Unit 1 ML13093A4732013-04-0303 April 2013 Summary of Meeting with Omaha Public Power District ML12366A0322013-01-25025 January 2013 Summary of Meeting with Omaha Public Power District to Discuss Containment Internal Structures Issues to Support Restart of Fort Calhoun Station, Unit 1 ML12338A1912012-12-0303 December 2012 Meeting Summary with Omaha Public Power District to Discuss Update of Issues and Oversight Activities at Fort Calhoun Station ML12269A2242012-09-25025 September 2012 Meeting Summary of with Omaha Public Power District ML12220A3772012-08-0303 August 2012 Summary of Meeting with Omaha Public Power District ML12104A2642012-04-13013 April 2012 4/4/12 Summary of Meeting with Omaha Public Power District, Fort Calhoun Station ML1204004582012-02-0909 February 2012 Summary of Meeting with Omaha Public Power District to Discuss Specifics of the Transition of Fort Calhoun Station to Regulatory Oversight Under the NRC Inspection Manual Chapter 0350 Process ML1122116172011-08-0505 August 2011 7/27/2011- Summary of Public Meeting with Omaha Public Power District to Discuss Post-Flooding Recovery Actions for Fort Calhoun Station ML1116801512011-07-11011 July 2011 5/26/11 Summary of Prelicensing Meeting with Omaha Public Power District to Discuss License Amendment Request to Adopt Risk-Informed National Fire Protection Association Standard NFPA 805 or Fort Calhoun Station, Unit 1 ML1116600272011-06-14014 June 2011 Summary of Meeting with Omaha Public Power District Regarding a Preliminary Substantial Finding ML1110204072011-05-17017 May 2011 Summary of 03/02/11 Closed Pre-Licensing Teleconference with Omaha Public Power District to Discuss Its Plans to Submit an Extended Power Uprate for Fort Calhoun Station and Issues Related to Control Rod Withdrawal at Power ML1111014372011-05-17017 May 2011 Summary of Pre-Licensing Meeting with Omaha Public Power District to Discuss Its Plans to Submit an Extended Power Uprate for Fort Calhoun Station and Issues Related to Equipment Environmental Qualification ML1110201362011-04-12012 April 2011 Summary of Public Meeting with Omaha Public Power District to Discuss the Fort Calhoun Station 2010 Performance ML1102600062011-02-0707 February 2011 Summary of 1/13/2011 Pre-Licensing Meeting with Omaha Public Power District to Discuss Fort Calhoun Station'S Extended Power Uprate, Spent Fuel Pool Criticality, and Proposed License Amendment Request Modeled After TSTF-493 ML1023802302010-08-26026 August 2010 Summary of Meeting with Omaha Public Power District Regarding a Preliminary Substantial Finding ML1021101372010-08-0606 August 2010 Summary of 7/16/2010 Conference Call with Licensee to Discuss the 10/14/2008 Response to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems ML1019403012010-07-29029 July 2010 6/30/2010 Summary of Teleconference Meeting with Omaha Public Power District to Discuss NRC Staff Request for Additional Information Dated 2/12/2010 on Generic Letter 2004-02 for Fort Calhoun Station, Unit 1 ML1014606292010-05-26026 May 2010 Summary of Public Meeting with Omaha Public Power District on the Fort Calhoun Station 2009 Performance ML1006200722010-03-23023 March 2010 Summary of Category 1, Teleconference with Omaha Public Power District to Discuss NRC Staff Request for Additional Information on Generic Letter 2004-02 for Fort Calhoun Station, Unit 1 ML0931401772009-11-18018 November 2009 Summary of November 5, 2009, Category 1 Meeting with Omaha Public Power District to Discuss Plans for Extended Power Uprate License Amendment Request for Fort Calhoun Station, Unit 1 ML0916801382009-06-30030 June 2009 Summary of Conference Call Regarding Issues Related to the Cracking of Mitsubishi Heavy Industries Ltd.-Fabricated Replacement Steam Generators for San Onofre Nuclear Station, Unit 3 ML0912405962009-05-0404 May 2009 Meeting Summary, 2008 EOC Public Meeting with Omaha Public Power District on Fort Calhoun Station ML0903706432009-02-13013 February 2009 Summary of Meeting with Omaha Public Power District, to Discuss the Fort Calhoun Station'S Transition to National Fire Protection Association (NFPA) 805 ML0903704112009-02-13013 February 2009 Summary of Meeting with Omaha Public Power District to Discuss Oppd'S Plans to Submit an Extended Power Uprate Request for the Fort Calhoun Station, Unit 1 2019-03-13
[Table view] |
Text
March 13, 2019 U.S. Nuclear Regulatory Commission Public Meeting Summary Title: Omaha Public Power District Request s for Approval for Partial Site Release from NRC Regulatory Control of the Fort Calhoun Station Meeting Identifier:
20181232 Date of Meeting:
November 28, 2018 Location:
Residence Inn Omaha Downtown/Old Market Area 106 South 15th St.
Omaha, NE Type of Meeting:
Category 3 Purpose of the Meeting
- The purpose of the meeting was to describe: 1) the request s by the Omaha Public Power District (OPPD or the licensee
), to release from regulatory control non
-impacted of parts of the Fort Calhoun Station site for unrestricted use
, and; 2) th e U.S. Nuclear Regulatory Commission (NRC) process for partial site releases of nuclear power facilities
, for members of the public. In compliance with the regulations in 10 CFR 50.83 , this meeting was also held to answer any questions and take comments from the public. The request s by OPPD are in the Agencywide Documents Access and Management System (ADAMS) accession nos. ML18215A187 (dated June 29, 2018
) and ML18316A036 (dated November 12, 2018). The meeting announcement is in ADAMS at accession no. ML18319A273
. The Federal Register Notice announcing NRC consideration of the requests, a 30-day opportunity to comment and holding of a public meeting was published on November 26, 2018 (83 FR 60508). No comments were received during the comment period.
General Details:
The meeting was attended by 19 individuals including OPPD representatives, representatives from the States of Nebraska and Iowa, an OPPD contractor, members of the public, and NRC staff. Presentations were made on the partial site release request made by OPPD and the NRC's regulatory process and confirmatory surveys for partial site releases. A question and answer session with the public was then conducted before concluding the meeting.
2 List of Meeting Attendees:
Last Name First Name Organization Pruett Troy US NRC Brad Blome OPPD Joseph Nowa k Energy Solutions Uehling Tim OPPD Averett Cris OPPD Maine Ted OPPD Barker Andi OPPD Steve Giebel US NRC Parrott Jack US NRC O'Brien Tim OPPD Fisher Mary OPPD Meisinger Kevin OPPD Dvorak Kevin public Dvorak Morgan public Shuman Howard State of Nebraska Danelle Cram OPPD Vovolka Alan public Lohmuller Kris OPPD Stodola Kathy State of Iowa Summary of Presentations:
The OPPD and NRC meeting slides are in ADAMS at accession no s. ML19070A246 and ML19070A307 respectively. The meeting transcript is in ADAMS at accession no. ML19003A117
. The meeting started with welcome, introductions, and meeting information and ground rules. An OPPD representative made a presentati on on their request to release some non-impacted land areas of their site
, or land areas under easement, for unrestricted use (i.e., partial site release). The NRC staff then made a presentation on the power reactor partial site release review and approva l process, and the NRC surveys done to confirm the licensee's designation of the release areas as non
-impacted. Public Participation Themes:
The meeting was attended by three members of the public and two members of State Agencies
. The members of the public asked questions on what control OPPD would still have on the land area s next to the Missouri River in order to monitor erosion if those land areas were released by the NRC for unrestricted use.
An OPPD representative 3 explained that while further control of those land areas would be outside of NRC's jurisdiction, OPPD would still own the property.
Other member s of the public asked question s on what other observations of the land other than soil testing happen at the site. An OPPD representative described environmental monitoring that the Fort Calhoun Station does under its NRC license such as direct radiation and vegetation, milk, water, and air sampling.
Action Items/Next Steps:
The NRC's confirmatory survey report is complete and is in ADAMS at accession no. ML 19065A256. The report has confirmed that the land areas proposed for unrestricted release meet the definition of non
-impacted. NRC will finalize the NRC safety evaluation and process the partial site release request per the regulations in 10 CFR 50.83 for release of non
-impacted areas.
The NRC's decision on approval and the safety evaluation of the request will be communicated by letter to the licensee that will be publicly available once delivered to the licensee
.
ML19071A030
- via email OFFICE DUWP DUWP DUWP NAME JParrott BWatson JParrott DATE 3/12/19 3/13/19 3/13/19