Other: L-08-123, Drawing Lr 1-46-2, Rev. 5, Post DBA Hydrogen Analyzer System., L-08-189, Drawing Lr 2-27A-2, Rev. 4, Auxiliary Steam and Condensate System (Ass)., L-08-261, Schedule for Submittal of Annual Update for License Renewal Application, L-08-262, Drawing, Lr Drawing 2-31-1, Rev. 5, Demineralized Water System (Wtd)., L-08-263, Submittal of Revision to License Renewal Application Amendment No. 24, L-08-292, Lr Drawing 1-21-1, Rev. 7, Main Steam System (Ms)., L-08-316, License Renewal Application Amendment No. 26 (TAC Nos. MD6593 and MD6594), Revisions, L-08-393, License Renewal Application, Amendment No. 33, L-09-058, Comments on Safety Evaluation Report with Open Item Related to the License Renewal, L-09-138, License Renewal Application, Amendment No. 36, L-09-151, License Renewal Application Amendment No. 37, ML081000322, ML081000323, ML081000324, ML081000326, ML081000327, ML081000328, ML081000329, ML081000330, ML081000331, ML081000332, ML081640592, ML081640593, ML081640594, ML081640596, ML081640597, ML081640598, ML081640599, ML081640600, ML081640601, ML081640602, ML081640603, ML081640604, ML082550686, ML082550687, ML082550688, ML083010249, ML092740576, ML092920050, NRC-2009-0496, Beaver Valley Federal Register Notice - Record of Decision to Renew License
|
MONTHYEARL-07-130, Submittal of Pressure and Temperature Limits Report, Revision 42007-09-19019 September 2007 Submittal of Pressure and Temperature Limits Report, Revision 4 Project stage: Request ML0805902622008-03-0303 March 2008 Request for Additional Information, License Renewal Application (TAC Nos. MD6593 and MD6594) Project stage: RAI ML0806402162008-03-0505 March 2008 RAI for the Review of the Beaver Valley Power Station, Units 1 and 2, LRA Project stage: RAI ML0806010202008-03-0505 March 2008 RAI for the Review of the Beaver Valley Power Station, Units 1 & 2, LRA Project stage: RAI ML0807202882008-03-21021 March 2008 Request for Additional Information, Section B.2.35 Project stage: RAI ML0807907442008-03-26026 March 2008 Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application, for Sections B.2.6, B.2.19, and B.2.23 Project stage: RAI L-08-122, Reply to Request for Additional Information for the Review of the License Renewal Application and Revisions to License Renewal Application Boundary Drawings2008-03-31031 March 2008 Reply to Request for Additional Information for the Review of the License Renewal Application and Revisions to License Renewal Application Boundary Drawings Project stage: Response to RAI ML0807903922008-04-0101 April 2008 RAI for the Review of the Beaver Valley Power Station, Units 1 & 2, LRA Project stage: RAI ML0807905382008-04-0101 April 2008 RAI for the Review of the Beaver Valley Power Station, Units 1 & 2, LRA Project stage: RAI L-08-124, Reply to Request for Additional Information for Review of the License Renewal Application and License Renewal Application Amendment No. 52008-04-0202 April 2008 Reply to Request for Additional Information for Review of the License Renewal Application and License Renewal Application Amendment No. 5 Project stage: Response to RAI ML0807907352008-04-0303 April 2008 RAI for the Reveiw of the Beaver Valley, Units 1 and 2, License Renewal Application Project stage: RAI ML0810002962008-04-0303 April 2008 Reply to Request for Additional Information for the Review of License Renewal Application, Amendment No. 4, and Revised License Renewal Boundary Drawings Project stage: Response to RAI ML0810003222008-04-0303 April 2008 Drawing Lr 1-07-2, Rev. 4, Chemical and Volume Control System. Project stage: Other ML0810003232008-04-0303 April 2008 Drawing Lr 1-07-3, Rev. 6, Chemical and Volume Control System. Project stage: Other ML0810003242008-04-0303 April 2008 Drawing Lr 1-08-1, Rev. 4, Boron Recovery Degasifiers. Project stage: Other ML0810003262008-04-0303 April 2008 Drawing Lr 1-09-2, Rev. 4, Vent and Drain System. Project stage: Other ML0810003272008-04-0303 April 2008 Drawing Lr 1-12-1, Rev. 5, Containment Vacuum and Leakage Monitoring System. Project stage: Other ML0810003282008-04-0303 April 2008 Drawing Lr 1-14A-1, Rev. 7, Sample System. Project stage: Other ML0810003292008-04-0303 April 2008 Drawing Lr 1-14A-2, Rev. 5, Sample System. Project stage: Other ML0810003302008-04-0303 April 2008 Drawing Lr 1-19-1, Rev. 5, Gaseous Waste Disposal System. Project stage: Other ML0810003322008-04-0303 April 2008 Drawing Lr 1-30-1, Rev. 5, River Water System. Project stage: Other L-08-123, Drawing Lr 1-46-2, Rev. 5, Post DBA Hydrogen Analyzer System.2008-04-0303 April 2008 Drawing Lr 1-46-2, Rev. 5, Post DBA Hydrogen Analyzer System. Project stage: Other ML0810003312008-04-0303 April 2008 Drawing Lr 1-24-1, Rev. 6, Feedwater System. Project stage: Other ML0809804832008-04-17017 April 2008 Request for Additional Information, Review of License Renewal Application Project stage: RAI ML0810503332008-04-17017 April 2008 Request for Additional Information, Review of License Renewal Application Project stage: RAI L-08-143, Reply to Request for Additional Information for Review of License Renewal Application and License Renewal Application Amendment No. 62008-04-18018 April 2008 Reply to Request for Additional Information for Review of License Renewal Application and License Renewal Application Amendment No. 6 Project stage: Response to RAI L-08-144, Reply to Request for Additional Information for the Review of License Renewal Application2008-04-25025 April 2008 Reply to Request for Additional Information for the Review of License Renewal Application Project stage: Response to RAI ML0811303942008-04-28028 April 2008 Request for Additional Information, Review of License Renewal Application Project stage: RAI ML0810502702008-04-30030 April 2008 Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: RAI L-08-146, Reply to Request for Additional Information for Review, License Renewal Application and License Renewal Application Amendment No. 72008-04-30030 April 2008 Reply to Request for Additional Information for Review, License Renewal Application and License Renewal Application Amendment No. 7 Project stage: Response to RAI L-08-174, Request for Revised Submittal Date for Reply to Request for Additional Information for the Review of the License Renewal Application2008-05-0202 May 2008 Request for Revised Submittal Date for Reply to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI L-08-149, Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application2008-05-0505 May 2008 Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: Response to RAI ML0814104162008-05-0808 May 2008 Transmittal of Correction to Reply to RAI for the Review of License Renewal Application, License Renewal Application Amendment No. 8 & Revised License Renewal Boundary Drawings Project stage: Request ML0810505432008-05-0808 May 2008 Request for Additional Information, Sections 3.5.2.2, B.2.1, B.2.3 and 4.6 of License Renewal Application Project stage: RAI ML0811604672008-05-0808 May 2008 Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0812009202008-05-0808 May 2008 Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (TAC MD6593 and MD6594) Project stage: RAI ML0811205392008-05-15015 May 2008 Request for Additional Information, License Renewal Application (TAC Nos. MD6593 and MD6594) Project stage: RAI ML0814405432008-05-19019 May 2008 Reply to Request for Additional Information for the Review of the License Renewal Application Amendment No. 9. and Revised License Renewal Boundary Drawings Project stage: Response to RAI L-08-169, Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application2008-05-19019 May 2008 Reply to Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: Response to RAI ML0811304122008-05-22022 May 2008 Request for Additional Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0813605572008-05-22022 May 2008 Revision of Schedule for the Conduct of Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application Project stage: Approval ML0811505772008-05-28028 May 2008 Request for Additional Information for Sections B.2.27, 4.3 and 4.7.4 of the BVPS LRA Project stage: RAI L-08-180, Reply to Request for Additional Information for the Review of the License Renewal Application2008-05-28028 May 2008 Reply to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI L-08-147, Reply to Request for Additional Information for Renewal License Application2008-06-0202 June 2008 Reply to Request for Additional Information for Renewal License Application Project stage: Response to RAI ML0814306872008-06-0404 June 2008 Request for Additional Information the Review of Beaver Valley, Units 1 and 2, License Renewal Application Project stage: RAI L-08-181, Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application, Amendment No. 102008-06-0606 June 2008 Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application, Amendment No. 10 Project stage: Response to RAI ML0816405052008-06-0909 June 2008 Reply to Request for Additional Information for the Review of the License Renewal Application License Renewal Application Amendment No. 11, and Revised License Renewal Boundary Drawings Project stage: Response to RAI ML0816405922008-06-0909 June 2008 Drawing Lr 1-14A-1, Rev. 8, Sample System (Ss). Project stage: Other ML0816405932008-06-0909 June 2008 Drawing Lr 1-21-1, Rev. 6, Main Steam System (Ms). Project stage: Other ML0816405942008-06-0909 June 2008 Drawing Lr 1-22-1, Rev. 4, Condensate System (Cn). Project stage: Other 2008-04-03
[Table View] |
|
---|
Category:Letter type:L
MONTHYEARL-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-053, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-04-14014 April 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-058, 180-Day Steam Generator Tube Inspection Report2023-03-27027 March 2023 180-Day Steam Generator Tube Inspection Report L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-036, Report of Facility Changes, Tests and Experiments2023-03-13013 March 2023 Report of Facility Changes, Tests and Experiments L-23-086, Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair2023-03-0404 March 2023 Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair L-23-087, Supplement to Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair (L-2023-LLA-0027)2023-03-0404 March 2023 Supplement to Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair (L-2023-LLA-0027) L-23-073, Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair2023-03-0101 March 2023 Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair L-23-016, Twenty-Eighth Refueling Outage Inservice Inspection Summary Report2023-02-21021 February 2023 Twenty-Eighth Refueling Outage Inservice Inspection Summary Report L-23-064, Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-02-21021 February 2023 Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-22-193, Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H2023-02-14014 February 2023 Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H L-22-286, Supplement to Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time2023-02-14014 February 2023 Supplement to Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time L-23-032, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Second Half of 20222023-01-23023 January 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Second Half of 2022 L-22-281, Discharge Monitoring Report (NPDES) Permit No. PA00256152022-12-16016 December 2022 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-246, Response to Request for Additional Information Regarding a Request to Consolidate Fuel Decay Time Technical Specifications to New LCO2022-12-0707 December 2022 Response to Request for Additional Information Regarding a Request to Consolidate Fuel Decay Time Technical Specifications to New LCO L-22-217, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-11-21021 November 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-226, Emergency Preparedness Plan2022-11-0404 November 2022 Emergency Preparedness Plan L-22-222, Cycle 29-1 Core Operating Limits Report2022-10-31031 October 2022 Cycle 29-1 Core Operating Limits Report L-22-228, Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2022-10-26026 October 2022 Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-22-200, Response to Request for Additional Information Regarding a 180-Day Steam Generator Tube Inspection Report Fall 2021 Refueling Outage2022-10-21021 October 2022 Response to Request for Additional Information Regarding a 180-Day Steam Generator Tube Inspection Report Fall 2021 Refueling Outage L-22-232, Withdrawal of a License Amendment Request Associated with Fire Protection Program Changes2022-10-21021 October 2022 Withdrawal of a License Amendment Request Associated with Fire Protection Program Changes L-22-238, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-10-20020 October 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-227, Revised August 2022 Outfall 003 & 004 NPDES Discharge Monitoring Report (Dmr), Revised Daily Effluent Monitoring Report Forms for Outfalls 003 & 004 and Corrective Action Letter from Eurofins2022-10-0303 October 2022 Revised August 2022 Outfall 003 & 004 NPDES Discharge Monitoring Report (Dmr), Revised Daily Effluent Monitoring Report Forms for Outfalls 003 & 004 and Corrective Action Letter from Eurofins L-22-219, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-09-26026 September 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-204, Submittal of Evacuation Time Estimates2022-09-0707 September 2022 Submittal of Evacuation Time Estimates L-22-137, Request for Fire Protection Program Changes2022-09-0606 September 2022 Request for Fire Protection Program Changes L-21-238, License Amendment Request for Addition of Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident2022-08-31031 August 2022 License Amendment Request for Addition of Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident L-22-188, Response to Request for Additional Information Regarding Steam Generator Inspection Report- Fall 2021 Refueling Outage2022-08-22022 August 2022 Response to Request for Additional Information Regarding Steam Generator Inspection Report- Fall 2021 Refueling Outage L-22-191, Spent Fuel Storage Cask Registration2022-08-17017 August 2022 Spent Fuel Storage Cask Registration 2023-09-14
[Table view] |
Text
Beaver Valley Power Station P.O. Box 4 Shippingport, PA 15077 Peter P. Sena III 724-682-5234 Site Vice President Fax: 724-643-8069 September 2, 2009 L-09-242 10 CFR 54 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Beaver Valley Power Station, Unit Nos. 1 and 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Supplemental Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (TAC Nos. MD6593 and MD6594), and License Renewal Application Amendment No. 40 Reference 1 provided the FirstEnergy Nuclear Operating Company (FENOC) License Renewal Application (LRA) for the Beaver Valley Power Station (BVPS). Reference 2 provided Amendment No. 39 to Reference
- 1. This letter clarifies and expands information provided in Reference 2 as discussed in a September 1, 2009 telephone conference call between FENOC and the U. S. Nuclear Regulatory Commission (NRC).The Attachment provides the clarification and expanded information.
The Enclosure provides Amendment 40 to the BVPS LRA.There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Clifford I. Custer, Fleet License Renewal Project Manager, at 724-682-7139.
I declare under penalty of perjury that the foregoing is true and correct. Executed on September c ,2009.Since]ly, Peter P. Sena III Beaver Valley Power Station, Unit Nos. 1 and 2 L-09-242 Page 2
References:
- 1. FENOC Letter L-07-113, "License Renewal Application," August 27, 2007.2. FENOC Letter L-09-205, "Supplemental Information for the Review of the Beaver Valley Power Station, Units 1 and 2, License Renewal Application (TAC Nos.MD6593 and MD6594), and License Renewal Application Amendment No. 39," July 28, 2009.
Attachment:
Supplemental Information Regarding Beaver Valley Power Station, Units 1 and 2, License Renewal Application, Section B.2.3
Enclosure:
Amendment No. 40 to the BVPS License Renewal Application cc: Mr. K. L. Howard, NRC DLR Project Manager Mr. S. J. Collins, NRC Region I Administrator cc: w/o Attachment or Enclosure Mr. B. E. Holian, NRC DLR Director Mr. D. L. Werkheiser, NRC Senior Resident Inspector Ms. N. S. Morgan, NRC DORL Project Manager Mr. D. J. Allard, PA BRP/DEP Director Mr. L. E. Ryan, PA BRP/DEP ATTACHMENT L-09-242 Supplemental Information Regarding Beaver Valley Power Station, Units 1 and 2, License Renewal Application, Section B.2.3 Page 1 of 4 1. Describe the failure criteria for volumetric (UT) examination which will trigger the UT scanning at additional locations.
In establishing the criteria, distinguish between the criteria used; (1) if the metal thinning is attributed to degradation on the inside surface of the liner, and (2) if the metal thinning is attributable to the exterior surface (in contact with the containment concrete)of the liner.Metal thinning attributed to degradation on the inside surface of the liner will be managed in accordance with the American Society of Mechanical Engineers (ASME)Boiler and Pressure Vessel Code Section Xl, Subsection IWE Program. The statistical sampling program is not applicable to degradation of the inside surface of the liner.The statistical sample failure criteria for volumetric (ultrasonic testing (UT))examinations of the concrete to liner interface is defined as greater than 10% loss of material from the nominal thickness that is characterized through engineering evaluation as pitting corrosion degradation indicative of foreign material.
Industry and site specific operating experience (OE) has demonstrated that pitting corrosion degradation due to foreign material manifests with pits that have measurable breadth and shape. Locations with identified loss of material less than 10% but with a breadth and shape that potentially indicates the presence of foreign material will be entered into the corrective action program and tracked as a point of interest for monitoring during subsequent outages until dispositioned by trending.FENOC intends to characterize locations with greater than 10% loss of material and displaying breadth and shape as statistical failures unless through engineering evaluation it is determined that indications are attributed to fabrication/erection practices.
Samples with greater than 10% loss of material would be entered into the corrective action program and re-examined during subsequent outages until dispositioned by trending.Unit 1 inspections for the initial sample lot of a minimum of 75 random samples will be completed in the next three refueling outages, beginning with the next Unit 1 refueling outage in 2010. Results will be available for on-site review and included in the summary report letter as described in Question 3.
Attachment L-o9-242 Page 2 of 4 2. Describe how you intend to statistically analyze the results of the UT examinations of the random and non-random samples (e.g., Kriging analysis or similar method) to determine the general state of the liner. Provide justification that your approach will adequately characterize the general state of the liner.The purpose of the random sampling plan is to make valid characterizations about the general state of the containment liner. The random sampling plan includes 100% UT of a minimum of seventy-five (75) 1-ft x 1-ft square areas randomly selected on the accessible ultrasonically untested portion of the containment liner per unit. The completion of the random sampling is designed to provide a confidence level of 95%that 95% of the ultrasonically untested containment liner is not experiencing localized pitting corrosion degradation that would challenge the integrity of the containment liner.FENOC will evaluate if an appropriate/applicable statistical method exists to gain additional insight into potential liner degradation.
Data gathered will be evaluated and used to determine the general state of the liner.
Attachment L-09-242 Page 3 of 4 3. Discuss your plans to submit the results of the UT examinations, and any associated analyses, to the NRC.The results (data and analysis) of random sample testing and non-random sample testing, will be maintained as program/plant records. Data or evaluations that constitute failed acceptance criteria will be documented in the corrective action program. FENOC will provide a summary of the UT testing results as docketed information after each completed outage where sampling has been performed.
Unit 1 inspections for the initial sample lot of 75 random samples will be completed in the next three refueling outages, beginning with the next Unit 1 refueling outage in 2010. Results will be available for on-site review.4. Provide additional details on the criteria for selecting the locations of the minimum of 8 non-random samples, e.g., the location of the through-wall hole identified in April 2009, areas that have required coating, and areas where the wood spacers are likely to have been placed during construction based on a review of construction drawings.
Provide justification for the adequacy of using 8 samples.The initial non-random sample population will be a minimum of 8 selected locations as determined by engineering judgment.
These locations will be selected from locations that are in UT accessible locations and are not previously ultrasonically tested locations.
Additionally, site-specific and industry OE is to be used to determine locations that are susceptible to localized foreign material induced corrosion.
The following criteria will be considered for selection of the Unit 1 non-random sample population:
- 1. Locations that have required re-painting more than once. These are areas where the inside liner topcoat has required rework. The primer coat was intact at these locations.
- 2. Locations that have irregular contour.3. The area approximately five feet below the lower one-third of the 2006 Steam Generator Replacement construction opening. This area was exposed to water from hydro-demolition-of the exterior concrete.4. The containment liner surface between Elevations 725' and 735' (final grade level). External surface of the concrete in this area has a greater potential for exposure to moisture.
The liner surface area with adjoining buildings will not be considered for non-random sampling.5., An area approximately 4.5-square feet horizontal to the 2009 through wall location on either side.
Attachment L-09-242 Page 4 of 4 The following criteria will be considered for selection of the Unit 2 non-random sample population:
- 1. Locations that have required re-painting more than once. These are areas where the inside liner topcoat has required rework. The primer coat was intact at these locations.
- 2. Locations that have irregular contour.3. The containment liner surface between Elevations 725' and 735' (final grade level). External surface of the concrete in this area has a greater potential for exposure to moisture.
The liner surface area with adjoining buildings will not be considered for non-random sampling.5. Describe your plans to share your results and findings with Electric Power Research Institute and other industry groups.FENOC plans to share the results of the containment liner sampling plan with the industry through contact with industry groups. The FENOC contact person would normally be the program owner.
ENCLOSURE Beaver Valley Power Station (BVPS), Unit Nos. 1 and 2 Letter L-09-242 Amendment No. 40 to the BVPS License Renewal Application Page 1 of 4 License Renewal Application Sections Affected Table A.4-1 Table A.5-1 The Enclosure identifies the correction by Affected License Renewal Application (LRA)Section, LRA Page No., and Affected Paragraph and Sentence.
The count for the affected paragraph, sentence, bullet, etc. starts at the beginning of the affected Section or at the top of the affected page, as appropriate.
Below each section the reason for the change is identified, and the sentence affected is printed in italics with deleted text lined-eutand added text underlined.
Enclosure L-09-242 Page 2 of 4 Affected LRA Section LRA Page No.Affected Paragraph and Sentence New Item No. 34 Table A.4-1 Page A.4-9 LRA Table A.4-1, "Unit 1 License Renewal Commitments," is amended to add new Item No. 34, regarding examinations of the containment liner, as follows: Related LRA Item Implementation Sectio No.Number Commitment Schedule Source Section No./Comments 34 A summary of results for each phase January 29, FENOC None of volumetric testing (described in 2016 Letter Unit I Commitments No. 32 and L-09-242 No. 33 in LRA Amendment No. 39)will be documented in a letter to the NRC.Affected Paragraph Affected LRA Section LRA Page No. and Sentence Table A.4-1 Page A.4-9 New Item No. 35 LRA Table A.4-1, "Unit 1 License Renewal Commitments," is amended to add new Item No. 35, regarding examinations of the containment liner, as follows: Item Implementation Sectio No.Number Commitment Schedule Source Section No./Comments 35 FENOC will evaluate if an January 29, FENOC None appropriate/applicable statistical 2016 Letter method exists to gain additional L-09-242 insiqht into potential liner degradation.
Data gathered will be evaluated and used to determine the general state of the liner.
Enclosure L-09-242 Page 3.of 4 Affected Paragraph and Sentence Affected LRA Section LRA Page No.Table A.4-1 Page A.4-9 Item No. 32 Commitment No. 32 in LRA Table A.4-1, "Unit 1 License Renewal Commitments," is revised as follows: Related LRA Item ImplementationRead A temCommitment Ipeme Source Section No./Number CSchedule Comments 32 Supplemental volumetric E*aminatiens FENOC None examinations will be performed on the wigl -cmmncncc Letter Unit 1 containment liner prior to the b, te-- end ef the L-09-205 period of extended operation.
Un"it Seventy-five (one foot square) O"utag-e in an randomly selected (as described in Unit 1 FENOC FENOC Letter L-09-205) sample inspections for Letter locations will-be examined (as the initial sample L-09-242 described in FENOC Letter L-09-242).
lot of 75 random If degradation is identified, it will be ultrasonic addressed through the corrective examinations will action program. be completed in the next three refueling outages, beginning with the Unit I refueling outage in 2010.Examinations will be completed by January 29, 2016 Enclosure L-09-242 Page 4 of 4 Affected LRA Section LRA Page No.Page A.5-10 Affected Paragraph and Sentence New Item No. 35 Table A.5-1 LRA Table A.5-1, "Unit 2 License Renewal Commitments," is amended to add new Item No. 35, regarding examinations of the containment liner, as follows: Related LRA Item ImplementationRead A Nmem Commitment Smpeme Source Section No./Number Schedule Cmet Comments 35 A summary of results for each phase May 27, 2027 FENOC None of volumetric testing (described in Letter Unit 2 Commitments No. 33 and L-09-242 No. 34 in LRA Amendment No. 39)will be documented in a letter to the NRC.Affected Paragraph Affected LRA Section LRA Page No. and Sentence Table A.5-1 Page A.5-10 New Item No. 36 LRA Table A.5-1, "Unit 2 License Renewal Commitments," is amended to add new Item No. 36, regarding examinations of the containment liner, as follows: Related LRA Item Commitment Source Section No./Number Schedule Comments 36 FENOC will evaluate if an May 27, 2027 FENOC None appropriate/applicable statistical Letter method exists to gain additional L-09-242 insight into potential liner degradation.
Data gathered will be evaluated and used to determine the general state of the liner.