ML18139A326

From kanterella
Revision as of 23:40, 19 January 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Resubmitts Rept on Reanalysis of Safety-Related Sys,Surry Power Station,Unit 2, Revision 1.Original Submittal Contained Errors
ML18139A326
Person / Time
Site: Surry Dominion icon.png
Issue date: 06/12/1980
From: NELSON H W
EBASCO SERVICES, INC.
To: DENTON H R
Office of Nuclear Reactor Regulation
Shared Package
ML18139A327 List:
References
CON-NRC-1 NUDOCS 8006180247
Download: ML18139A326 (3)


Text

I \ . , e EBASCO

  • SERVICES IN CDRPDFi.ATED ENGINEERS

-CONSTRUCTORS

-CONSULTANTS ONE JERICHO PLAZA JERICHO, N. Y. 11753 CABLE ADDRESS '"EBASCOE

.. Mr Harold R Denton, Director Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555

Dear Mr Denton:

Subject:

References:

SHOW CAUSE ORDER REANALYSIS REPORT REVISION NO. 1 SURRY POWER STATION UNIT 2 Serial No.: Docket No.: License No. : 138B 50-281 DPR-37 June 12, 1980 NRC.,...l Ebasco Services, Inc is resubmitting forty-five (45) copies of Revision 1 of the "Report on the Reanalysis of Safety-Related Piping Systems, Surry Power Station Unit 2, Virginia Electric and Power Company," originally hand delivered April 11, 1980. Please replace the forty-five (45) copies submitted on April 11, 1980 (white cover) with those enclosed (beige cover)

  • The resubmittal is for two (2) reasons: 1) General illegiliility of Appendix B flow diagrams 2) Errata on Appendix B, Page B-2 Main Steam Drawing No. 11548-FM-14A Feedwater Drawing No. 11548-FM-18A are Revision 1 but were not indicated as such. . 8 0 0 6 1 8* 0 i L/ 1 p

.. EHAS Ca SERVICES e

  • INCDRPDRATEll Mr Harold R Denton Jurie l2, . I980 We apologize for any inconvenience this way have caused. HWN/JNR/bfl Enclosures Very truly yours, 11~~ H W Nelson Project :Manager cc: Mr Victor Stello, Director Office of Inspection and Enforcement Mr James P O'Reilly, Director Office of Inspection and Enforcement, Region II

-4' * ., .. ..

  • be: Mr. J. H. Ferguson Mr. G. A. Helm Mr. D. F. Cochran Mr. Sam C. Brown, Jr. Mr. A. L. Parrish, III Mr. G. L. Strickler Mr. w. C. Spencer Mr. R. H. Wood a 11 , II I Mr. M. W. Maupin Mr. C. M. Sta 11 i ngs Mr. F. M. Alligood, Jr. Mr. H. W. Nelson -Ebasco Mr. E. A. Baum Mr. R. M. Berryman Mr. J. M. Daly Mr. J. w. Waddi 11 . Mr. C. M . Robinson, Jr. Mr. R. K. MacManus Mr. D. W. Speidell, Jr. Mr. w. T. Davidson -Surry Mr. J. L. Perkins Mr. w. C. Daley Mr. J. L. Wilson -Surry Mr. T. A. Peebles -Surry Mr. B. R. Sylvia Mr. B. R. Crowe -S&W Mr. s. C. Rossier -S&W Mr. J. C. Harris, Jr. L