ML18114A558
| ML18114A558 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley, Surry, Maine Yankee, FitzPatrick |
| Issue date: | 05/08/1979 |
| From: | Erlewine J STONE & WEBSTER ENGINEERING CORP. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML18114A559 | List: |
| References | |
| NUDOCS 7905140239 | |
| Download: ML18114A558 (1) | |
Text
r e
STONE & WEBSTER ENGINEERING CORPORATION 245 SUMMER STREET, BOSTON, MASSACHUSETTS ADDRESS ALL CORRESPONDENCE TO P.O. BOX 2325, BOSTON, MASS. 02107 BOSTON NEW YORK CHERRY HILL, N.J.
DENVER CHICAGO HOUSTON PORTLAND, OREGON SAN DIEGO WASHINGTON, D.C.
Dr. Harold Denton,.Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
DOCUMENTS REQUESTED BY MR. ULDIS POTAPOVS NRC SPECIAL INSPECTION TEAM DESIGN CONSTRUCTION REPORTS EXAMINATIONS CONSULTING ENGINEERING May 8, 1979 so-.2-~o
.;i i I 3oq "3 33
-:33'f During the NRC Special Inspection at Stone & Webster Engineering Corporation, May 1-4, 1979, Mr. Potapovs requested copies of the attached proprietary Stone & Webster procedures.
Please arrange to have these procedures forwarded to Mr. Potapovs.
Thank you, V?jruly yours,
.*4t1.~
>John A. Erlewine
- Vice President Enclosures 7905140?--39