ML20133K571
ML20133K571 | |
Person / Time | |
---|---|
Site: | Surry |
Issue date: | 01/10/1985 |
From: | Warman E STONE & WEBSTER ENGINEERING CORP. |
To: | Silberberg M NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES) |
Shared Package | |
ML20133K572 | List: |
References | |
RTR-NUREG-0956, RTR-NUREG-956 NUDOCS 8508120283 | |
Download: ML20133K571 (2) | |
Similar Documents at Surry | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18152B3571999-10-22022 October 1999
[Table view]Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable ML18152B4211999-05-25025 May 1999 Forwards Rev 1 to Relief Request P-11 to Clarify Original Intent of Request by Specifically Requesting Relief from Requirements of Section 6.1 of OM-6 ML18152A4741999-05-19019 May 1999 Forwards Completed Registration Form for Renewal of ASTs at Surry Nuclear Power Station,Iaw Section 9VAC 25-91-100.F ML18152B4171999-05-17017 May 1999 Provides Notification of Number of Steam Generator Tubes That Were Plugged During Spring 1999 Refueling Outage Planned ISI ML20217D6621999-05-14014 May 1999 Forwards NRC Operator Licensing Exams 50-280/99-301 & 50-281/99-301 (Including Completed & Graded Exams) for Tests Administered on 990329-0401 & 990412-15.Nine Candidates Passed (& One Failed) Exam ML18152A3701999-05-13013 May 1999 Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion ML18152B4121999-05-0303 May 1999 Forwards Application for Renewal of License for SV Ross. Encl Withheld Per 10CFR2.790(a)(6) ML18152B4101999-04-29029 April 1999 Forwards Scope & Objectives for 990803 Surry Power Station Emergency Exercise.Without Encls ML18152B6561999-04-23023 April 1999 Forwards Annual Radioactive Effluent Release Rept for Surry Power Station,Jan-Dec 1998, Which Includes Summary of Quantities of Radioactive Liquid & Gaseous Effluents & Solid Waste Released During CY98 ML18152B6491999-04-13013 April 1999 Forwards MOR for Mar 1999 for Surry Power Station,Units 1 & 2.MOR for Feb 1999 Incorrectly Stated Gross Electrical Energy Generated (Mwh) for Unit 2.Rept Should Have Stated Monthly Figure as 568965.0 ML18151A5851999-03-31031 March 1999 Forwards Rept on Status of Decommissioning Funding for Each of Four Nuclear Power Reactors,Per 10CFR50.75(f)(1) ML18152A2801999-03-30030 March 1999 Forwards Summary of Structural Integrity Evaluation of Thermally Induced Over Pressurization of Containment Penetration Piping During DBA for SPS & Naps,Units 1 & 2,per GL 96-06.Draft Proposed UFSAR Revised Pages,Encl ML18153A2721999-03-29029 March 1999 Forwards LER 99-002-00 Per 10CFR50.73.Listed Commitments Contained in Ltr 1999-09-08 Category:ENGINEERING/CONSTRUCTION/CONSULTING FIRM TO NRC MONTHYEARML20245D9851989-06-22022 June 1989
[Table view]Forwards 21 Insp Rept Executive Summaries,Per NRC Contract NRC-03-87-029,Task Order 037.Individual Quality Evaluations of Insp Repts Also Prepared ML20236U5221987-10-19019 October 1987 FOIA Request for LERs for Listed Plants,Including All Attachments & Encls from Original Documents ML18150A1861987-05-0101 May 1987 Forwards EGG-NTA-7612, Conformance to Generic Ltr 83-28, Item 2.2.2 - Vendor Interface Programs for All Other Safety- Related Components,North Anna Units 1 & 2 & Surry Units 1 & 2, Final Informal Rept ML20215D0151987-04-29029 April 1987 FOIA Request for Listed Info Re Dec 1986 Accident at Facility That Killed Four Employees & Injured Four Other Employees When Pipe Burst ML18150A1201987-04-17017 April 1987 Forwards EGG-NTA-7378, Conformance to Generic Ltr 83-28, Item 2.2.1 - Equipment Classification for All Other Safety- Related Components:Surry 1 & 2, Final Informal Rept.Plant Conforms to Generic Ltr Item ML18150A1171987-04-14014 April 1987 Forwards Final rept,EGG-NTA-7625, Conformance to Item 2.1 (Part 2) Generic Ltr 83-28,Reactor Trip Sys Vendor Interface,North Anna 1 & 2 & Surry 1 & 2. ML18150A1241987-03-23023 March 1987 Forwards EGG-NTA-7633, Technical Evaluation Rept TMI Action - NUREG-0737 (II.D.1) Relief & Safety Valve Testing, Surry Units 1 & 2. Util Submittals Reconfirm That GDC 14,15 & 30 Met ML20209A8551987-01-16016 January 1987 FOIA Request for Documents to Be Placed in Pdr,Including NRC Re Calibr of Test Equipment allegation,1986 Inservice Insp Repts for McGuire 1 & Surry 1 & NRC 830307 SALP on Nine Mile Point 2 ML20214J9761986-10-15015 October 1986 FOIA Request for Containment Event Trees for Listed Facilities,Technical Repts & Memoranda Re Interpretation & Quantification & Identification of FIN Numbers,Contractors & Investigators Involved in Creation/Analysis of Event Trees ML20214K0231986-10-15015 October 1986 FOIA Request for All Documentation Re Accident Sequence Evaluation Program Repts Re Listed Facilities in Preparation for NUREG-1150 ML20214K5261986-07-18018 July 1986 FOIA Request for SECY-86-174 Re ISFSI Using Dry Casks ML20155J6981986-04-23023 April 1986 FOIA Request That Encls 1 & 2 to NRC to VEPCO Re Surry 1 Fire Protection Be Made Available Through PDR ML20198H0761986-01-0202 January 1986 Responds to Item 7.3.2 Re Corrections to Shielding of Castor V/21 Tsar,Per L Rouse .Mod to Gamma Shielding Proposed,Based on Dose Rate Measurements Obtained During Demonstration Test at Inel.Figures Encl ML20137E1791985-11-22022 November 1985 FOIA Request for Three Categories of Documents Re Source Terms ML20133H0871985-10-10010 October 1985 Requests Ltr Stating That Listed Facilities Do Not Have Fuel Element Transfer Tubes.Documentation Needed for IE Bulletin 78-08 Closeout Rept ML20129A9861985-01-31031 January 1985 FOIA Request for Encls to Gulf State Utils 840820 Deficiency Rept Re ITE-Gould Type 2150 Overload Relays & Encls to NRC to VEPCO Re Request for Addl Info on SPDS to Be Placed in PDR ML20133K5711985-01-10010 January 1985 Forwards Improved Figure Depicting Results of Analysis of Iodine Leakage as Function of Containment Opening Size as Calculated by Sandia & S&W,Per to W Pasedag ML20133K6141984-12-26026 December 1984 Submits Observations on Results of Comparison of Sandia & S&W Analyses of AB-B Accident Sequence as Computed W/ March/Contain & Threed/Nausa Computer Programs.Results of Both Analyses Similar ML20133K6321984-12-20020 December 1984 Forwards Figure Presenting Results of Comparison of Cumulative Leakage Fractions of Iodine & Cesium as Function Size of Postulated Preexisting Opening in Containment ML20129A8681984-12-18018 December 1984 FOIA Request for Four Categories of Documents Including Info Re Exemption of Snubbers from Surveillance Requirements & OL Amends ML20107K8831984-11-16016 November 1984 FOIA Request for Six Categories of Documents to Be Available in Pdr,Including Control of Heavy Loads at Indian Point Unit 2 & VEPCO Re IE Bulletin 80-11 ML18139A3261980-06-12012 June 1980 Resubmitts Rept on Reanalysis of Safety-Related Sys,Surry Power Station,Unit 2, Revision 1.Original Submittal Contained Errors ML18136A3781980-01-0808 January 1980 Supplements 800103 Ltr Re SHOCK-II Computer Calculations Performed on Piping of Six Inches or Less.Surry & Me Yankee re-examined as Part of Show Cause Reanalysis Effort.One Piping Problem Remains at Fitzpatrick ML18136A4241980-01-0808 January 1980 Ack Receipt of NRC 791206 Ltr Re Wj Kennedy Request for Withholding Computer Programs W/Proprietary Info Concerning Pipe Stress Analysis.Will Notify When No Longer Necessary to Classify Info as Proprietary ML20133M5231980-01-0303 January 1980 Submits Info Re Other Facilities Affected by 790313 Order to Show Cause Concerning Use of Pipe Supports on 2 1/2 to 6 Inch Piping Designed for Loads Derived from Shock 2 Computer Calculations.Supporting Documentation Encl ML18114A6121979-05-18018 May 1979 Summarizes Procedures & Calculational Techniques Used in Reanalysis of Piping Sys Designed W/Shock II Computer Program.Reanalysis Will Satisfy 790313 Order to Show Cause ML18114A5751979-05-14014 May 1979 Forwards Shock 1 Computer Program Listing.Supersedes Submittal of 790406.Program Listing Withheld (Ref 10CFR2.790) ML18114A5691979-05-11011 May 1979 Notifies That Review of Computer Deck Is Completed.Shock 0 Program Still Unrecovered.Piping Sys Conservatively Designed & Will Perform Intended Function ML18114A5611979-05-0909 May 1979 Confirms 790504 Telcon W/Wt Russell Re Computer Deck Associated W/Shock 0 Program ML18114A5581979-05-0808 May 1979 Forwards Proprietary Documents Requested During 790501-04 Special Insp ML18114A5601979-05-0404 May 1979 Requests Withholding Technical Guideline EMTG-22-0 & Technical Rept EMTR-612 (Ref 10CFR2.790).Affidavit Encl ML18114A5171979-04-27027 April 1979 Forwards Status Rept on 790427 Plan for Verification of Dynamic Analysis Codes. ML18114A4591979-04-13013 April 1979 Forwards Affidavit of Tj Pashos of Nuclear Svcs Corp Re Application for Withholding Proprietary Info from Public Disclosure ML18114A4441979-04-13013 April 1979 Forwards Update Rept on Plan for Verification of Dynamic Analysis Codes Dtd 790406 ML18114A4281979-04-0606 April 1979 Forwards Computer Programs & Info Related to Shock 1,2 & 3 Pstress & NUPIPE-SW.Requests Info Be Withheld (Ref 10CFR2.790).Forwards Affidavit & Supporting Documentation ML18114A4451979-04-0606 April 1979 Forwards Plan for Verification of Dynamic Analysis Codes, for Listed Dockets in Response to NRC 790402 Ltr 1989-06-22 Category:INCOMING CORRESPONDENCE MONTHYEARML18152B3571999-10-22022 October 1999
[Table view]Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 ML18152B4261999-05-28028 May 1999 Provides Formal Notification of Effect of Recent Organizational Restructuring on OLs of North Anna & Surry Power Stations,Per NRC 990513 Telcon Request ML18152B4221999-05-27027 May 1999 Forwards Info Concerning Changes to ECCS Evaluation Models & Application in Existing Licensing Analyses for Surry & North Anna Power Stations,Units 1 & 2 ML18152B4231999-05-26026 May 1999 Informs That Vepc Will Revise 180 Day Response to NRC GL 96-05,within 120 Days of Date of Ltr to Incorporate Commitment to Participate in Joint Owners Group Program as Applicable ML18152B4211999-05-25025 May 1999 Forwards Rev 1 to Relief Request P-11 to Clarify Original Intent of Request by Specifically Requesting Relief from Requirements of Section 6.1 of OM-6 ML18152B4171999-05-17017 May 1999 Provides Notification of Number of Steam Generator Tubes That Were Plugged During Spring 1999 Refueling Outage Planned ISI ML18152A3701999-05-13013 May 1999 Submits Proposal to Use Provisions of ASME Section XI Code Case N-597 for Analytical Evaluation of Class 1,2 & 3 Carbon & Low Alloy Steel Piping Components Subjected to Wall Thinning as Result of Flow Accelerated or Other Corrosion ML18152B4121999-05-0303 May 1999 Forwards Application for Renewal of License for SV Ross. Encl Withheld Per 10CFR2.790(a)(6) ML18152B4101999-04-29029 April 1999 Forwards Scope & Objectives for 990803 Surry Power Station Emergency Exercise.Without Encls ML18152B6561999-04-23023 April 1999 Forwards Annual Radioactive Effluent Release Rept for Surry Power Station,Jan-Dec 1998, Which Includes Summary of Quantities of Radioactive Liquid & Gaseous Effluents & Solid Waste Released During CY98 ML18152B6491999-04-13013 April 1999 Forwards MOR for Mar 1999 for Surry Power Station,Units 1 & 2.MOR for Feb 1999 Incorrectly Stated Gross Electrical Energy Generated (Mwh) for Unit 2.Rept Should Have Stated Monthly Figure as 568965.0 ML18151A5851999-03-31031 March 1999 Forwards Rept on Status of Decommissioning Funding for Each of Four Nuclear Power Reactors,Per 10CFR50.75(f)(1) ML18152A2801999-03-30030 March 1999 Forwards Summary of Structural Integrity Evaluation of Thermally Induced Over Pressurization of Containment Penetration Piping During DBA for SPS & Naps,Units 1 & 2,per GL 96-06.Draft Proposed UFSAR Revised Pages,Encl ML18153A2721999-03-29029 March 1999 Forwards LER 99-002-00 Per 10CFR50.73.Listed Commitments Contained in Ltr ML18153A3421999-03-26026 March 1999 Provides Updated Medical Status Rept for Wb Gross in Accordance with License SOP-20476-02,Docket 55-5228,as Amended by 980320 License Amend.Informs That Gross Exhibits No Performance Problems & Will Continue on Current Medicine ML20204H0331999-03-17017 March 1999 Forwards Rev 5 to PSP for Surry & North Anna Power Stations & Associated Isfsis.Description & Justification for Changes Included with Plan Rev.Rev 5 to PSP Withheld Per 10CFR73.21 ML18153A3411999-03-15015 March 1999 Forwards Signed Applications & Medical Certificates for Initial License at Surry Power Station Units 1 & 2 for Listed Individuals.Without Encls 1999-09-08 |
Text
n
- j,wuly~ I-
, MU EJ & ([q c e STONE 6 WEBSTER ENGINEERING CORPORATION 245 SUMMER STREET. BOSTON. M ASS ACH U SETTS ADDRESS ALL CORRESPONDENCE TO P.O. BOX 2325, BOSTON. M ASS 02107 W U. TELEX 94-0001 sosTON 94-0977 CEslGN C mR H L L. N J PORT nZ'"o
"'.I'^rin"
]T[.No,.oacGo.4 W ASM6NGTON D C.
Dr. M. Silberberg January 10, 1985 Accident Source Term Program Office U.S. Nuclear Regulatory Commission 7915 Eastern Avenue Silver Springs, MD 20910 RESULTS OF SANDIA/SWEC CODE COMPARISON As noted in my letter of December 26, 1984 to Dr. Walter Pasedag, I promised to send an improved figure which depicts the results of the analysis of iodine leakage as a function of containment opening size as calculated by Sandia National Laboratories and Stone & Webster Engineering Corporation SWEC. The enclosed figure presents these results.
I
~
Several notes are in order pertaining to this figure. First, it was re-drawnin log / log format to better illustrate the important region of opening sizes less than 1.0 ft2 Secondly, it should be pointed out that these analyses are based on a single control volume representation of the Surry containment and there-fore do not include any effects of multicompartments within the containment or structures outside the containment.
The Sandia data were provided by Dr. David C. Williams of Sandia, whose cooperation in this activity is gratefully acknowledged. Any questions on the Sandia analyses should,be directed to him. Any questions on the SWEC analyses should be directed to the undersigned.
Sincerely, Edward A. Warman j Enclosure CC: DrDCWilliams-Sandia National Laboratories DrWRStratton-Stratton & Associates ProfRWilson-Harvard University 850812O203 850110 PDR NUREC 0956 C PDR L ___--___-___-____-_-_a
I 1.0 z -
S
's N (* %
g
~
/, ~ y --T-- ""'
T, %
u- _
,/
- ,- - s
< s
[ \
- e al '
- e
_5
/ N s w
- - 44
-[- h d -
2 .
3 - --
s go; I I I I I I I II I I I I I I I I O.1 1.0 10 SIZE OF PRE-EXISTING OPENING (f t2)
LEGEND:
CONTAIN ANALYSIS WITH HeBURNS CONTAIN ANALYSIS WITHOUT He BURNS
-- ANS/ SWEC STUDY THREED/NAUA (NO Ha BURNS PREDICTED)
SIZE ON CUMULATIVE LEAKAGE AS CALCULATED BY SANDIA AND ANS / STONE & WEBSTER SURRY AB-S SEQUENCE
.