ML071780459

From kanterella
Revision as of 10:31, 23 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Harris Proposed Schedule 2007. Handout Reference for May 30-June 1, 2007, Fire Protection Transition Pilot Plant Observation Visit
ML071780459
Person / Time
Site: Oconee, Harris  Duke Energy icon.png
Issue date: 05/30/2007
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
Oudinot D, NRR/DRA, 415-3731
References
Download: ML071780459 (2)


Text

Harris NFPA 805 Pilot Observation Meetings / Reviews Proposed Schedule Rev 6/1/2007 Page 1 of 2 Pilot Plant Meeting Location Date Topic Type of Review Harris Raleigh May 29, 1-5 pm May 30, 8-5pm May 31, 8-3pm June 1, 8-12

Send products May 15 th Fire PRA Products Task 7.5, Fire Induced PRA

Model Task 7.12 Post Fire HRA

SSA Products Task 4.2 Control Room B-3

Table Task 4.4 Update T-H Analysis Task 4.5 Recovery Action

Update Detail Review of Products / Results

Harris Phone Call June Time Frame as needed. Follow-up to previous reviews Detail Review of Products / Results Oconee Oconee July 10-13 Agenda to be determined by Duke Detail Review of Products / Results Harris &

Oconee NRC NRR August 6-9

(send products July 18)

Fire PRA Products Task 7.14 Fire Risk Quantification Selected Scenarios

FP Program Task 8.0 Change Evaluations Selected Items / Scenarios Meeting Presentations

Include Detail

Review of

Products / Results when available Harris & Oconee NEI Forum September 19, 20Note NEI Forum with NFPA 805

lessons learned and NEI task force added on TBD Meeting Presentations Harris & Oconee TBD Transmittal

2 weeks prior Nov 12-14

ANS meeting that week? Combined meeting general status, methodologies, LAR content, etc Meeting Presentations

Include Detail

Review of

Products / Results when available Harris NFPA 805 Pilot Observation Meetings / Reviews Proposed Schedule Rev 6/1/2007 Page 2 of 2 Pilot Plant Meeting Location Date Topic Type of Review Harris Harris

Transmittal

2 weeks prior -

locate models materials at NEI?? Feb 4-8, 2008 PRA Audit NRC Audit