Units, 1, 2, & 3, McGuire, Units 1 & 2, Catawba, Units 1 & 2, Response to NRC Regulatory Issue Summary 2011-08, Preparation and Scheduling of Operator Licensing ExaminationsML11227A024 |
Person / Time |
---|
Site: |
Oconee, Mcguire, Catawba, McGuire |
---|
Issue date: |
08/11/2011 |
---|
From: |
Glover R Duke Energy Carolinas |
---|
To: |
Document Control Desk, Office of Nuclear Reactor Regulation |
---|
References |
---|
RIS-11-008 |
Download: ML11227A024 (5) |
|
|
---|
Category:Letter
MONTHYEARIR 05000369/20240032024-11-0404 November 2024 Integrated Inspection Report 05000369/2024003 and 05000370/2024003 IR 05000413/20240032024-11-0404 November 2024 Integrated Inspection Report 05000413/2024003 and 05000414/2024003 IR 05000269/20240032024-10-31031 October 2024 Integrated Inspection Report 05000269/2024003 and 05000270/2024003 and 05000287/2024003 (2) ML24303A4212024-10-30030 October 2024 Mcguire Nuclear Station, Units 1 & 2, Notification of an NRC Fire Protection Team Inspection FPTI NRC 05000369/2025010, 05000370/2025010 and Request for Information RFI ML24255A3322024-10-16016 October 2024 SLRA - Revised SE Letter ML24297A6172024-10-11011 October 2024 PCA Letter to NRC Oconee Hurricane Helene ML24297A6222024-10-11011 October 2024 PCA Letter to NRC Catawba Hurricane Helene ML24269A0912024-10-0909 October 2024 Request for Withholding Information from Public Disclosure IR 05000369/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000369/2024402 05000370/2024402 IR 05000413/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000413/2024011 and 05000414/2024011 ML24255A8312024-09-23023 September 2024 Project Manager Assignment ML24261B9782024-09-19019 September 2024 Notification of an NRC Fire Protection Team Inspection NRC Inspection Report 05000413-2024010, 05000414-2024010 and Request for Information IR 05000414/20240912024-09-0505 September 2024 Final Significance Determination of a White Finding and Nov and Assessment Followup Letter-NRC Inspection Report 05000414-2024091 IR 05000413/20240052024-08-26026 August 2024 Updated Inspection Plan for Catawba Nuclear Station (Report 05000413/2024005 & 05000414/2024005) IR 05000369/20240052024-08-26026 August 2024 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2, (Report 05000369-2024005 and 05000370-2024005) ML24145A1782024-08-26026 August 2024 Issuance of Amendment Nos. 430, 432, and 431, to TS 5.5.2, Containment Leakage Rate Testing Program for a one-time Extension of the Type a Leak Rate Test Frequency IR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) ML24235A1542024-08-22022 August 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000413-2024402 and 05000414-2024402) IR 05000413/20240022024-08-0808 August 2024 Integrated Inspection Report 05000413-2024002 and 05000414-2024002 and Apparent Violation 05000287/LER-2024-001, Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation2024-08-0202 August 2024 Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation IR 05000413/20244032024-08-0101 August 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000413/2024403; 05000414/2024403 IR 05000369/20244042024-08-0101 August 2024 Cover Letter Security Baseline Inspection Report 05000369/2024404 and 05000370/2024404 IR 05000369/20253012024-07-29029 July 2024 Notification of Licensed Operator Initial Examination 05000369/2025301 and 05000370/2025301 IR 05000369/20244032024-07-25025 July 2024 – Cyber Security Inspection Report 05000369/2024403 and 05000370/2024403 Rev IR 05000269/20240022024-07-25025 July 2024 Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 IR 05000369/20240022024-07-24024 July 2024 Integrated Inspection Report 05000369/2024002 and 05000370/2024002 ML24192A1312024-07-15015 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000369/20244012024-07-0303 July 2024 – Security Baseline Inspection Report 05000369/2024401 and 05000370/2024401 ML24183A2352024-06-29029 June 2024 Update 3 to Interim Report Regarding a Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24179A1102024-06-27027 June 2024 Submittal of Updated Final Safety Analysis Report Revision 30, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification ML24178A0552024-06-26026 June 2024 Requalification Program Inspection – Catawba Nuclear Station ML24176A2802024-06-26026 June 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000369-2024404 and 05000370-2024404) IR 05000414/20240902024-06-24024 June 2024 NRC Inspection Report 05000414/2024090 and Preliminary White Finding and Apparent Violation ML24170A8632024-06-11011 June 2024 Flowserve June 11, 2024, Part 21 Notification - Redacted Version for Publishing IR 05000369/20240112024-06-0404 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000369/2024011 and 05000370/2024011 ML24144A1162024-05-28028 May 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24149A1772024-05-28028 May 2024 NRC Response to Duke Energy 2025 FOF Schedule Change Request (Catawba and McGuire) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000413/20240012024-05-10010 May 2024 Integrated Inspection Report 05000413/2024001 and 05000414/2024001 and Apparent Violation IR 05000369/20240012024-05-0808 May 2024 Integrated Inspection Report 05000369-2024001 and 05000370-2024001 and 07200038-2024001 IR 05000269/20240012024-05-0303 May 2024 Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 ML24110A0382024-04-30030 April 2024 – Correction to Issuance of Amendment Nos. 330 and 309, Regarding Implementation of Technical Specifications Task Force (TSTF) Traveler TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf IR 05000269/20244022024-04-24024 April 2024 Security Baseline Inspection Report 05000269/2024402 and 05000270/2024402 and 05000287/2024402 ML24108A0792024-04-16016 April 2024 EN 57079 Paragon Energy Solutions Email Forwarding Part 21 Interim Report Re Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24100A8742024-04-10010 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000369/2024403; and 05000370/2024403 ML24095A1072024-04-0808 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report (C1R27) ML24052A3062024-04-0808 April 2024 Issuance of Amendment Nos. 331 & 310, Regarding Adoption of Title 10 of Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants IR 05000269/20244012024-03-28028 March 2024 – Security Baseline Inspection Report 05000269-2024401 and 05000270-2024401 and 05000287-2024401 ML24031A5402024-03-26026 March 2024 Issuance of Amendment Nos. 330 and 309 Regarding Implementation of TSTF 505,Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B 2024-09-05
[Table view] Category:Schedule and Calendars
MONTHYEARRA-23-0234, Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS)2023-09-28028 September 2023 Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS) ML22094A1902022-04-11011 April 2022 Schedule Revision for the Subsequent License Renewal Application Review ML22018A0292022-01-18018 January 2022 Region 2 RFI - 2022 Program Inspections ML21194A2452021-07-22022 July 2021 SLRA - Acceptance and Opportunity for Hearing - Letter ML19228A1012019-08-14014 August 2019 Baseline Security Inspection On-Site Schedule McGuire - 2019410 ML11227A0242011-08-11011 August 2011 Units, 1, 2, & 3, McGuire, Units 1 & 2, Catawba, Units 1 & 2, Response to NRC Regulatory Issue Summary 2011-08, Preparation and Scheduling of Operator Licensing Examinations ML1030803572010-11-17017 November 2010 NFPA 805 Pilot License Amendment Request Review Schedule Update, November 2010 ML1029805882010-10-26026 October 2010 NFPA 805 Pilot License Amendment Request Review Schedule Update, October 2010 ML0932400582009-11-19019 November 2009 NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, November, 2009 ML0916801952009-06-10010 June 2009 Interim 30-Day Response to Reference 2 ML0809900862008-04-0303 April 2008 Schedule for Providing Information Requested During March 18, 2008, Duke/Nrc Meeting Associated with the License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade.. ML0717804592007-05-30030 May 2007 Proposed Schedule 2007. Handout Reference for May 30-June 1, 2007, Fire Protection Transition Pilot Plant Observation Visit ML0711502362007-04-16016 April 2007 DPO-2006-002: DPO Followup Actions and Schedule ML0711502382007-04-16016 April 2007 DPO-2006-003: DPO Followup Actions and Schedule ML0711502242007-01-31031 January 2007 E-Mail from R. Pedersen, Dpopm, to EDO Extension Request, Subject: Extension Request for DPO (Atts.- 10/30/2006 e-mail to J. Grobe, Ades/Nrr, from R. Pedersen, Dpopm, Subject: DPOs 2006-002 and -003 Extension Request and Resolution Schedule ML0711502192006-12-18018 December 2006 Resolution Schedule for DPOs 2006-002 and 2006-003 ML0711502152006-11-0707 November 2006 Memo to L. Reyes, EDO, from R. Pedersen, Dpopm, Subject: Extension Request for DPOs 2006-002 and 2006-003, (Encl. 1-DPO-2006-002: DPO Milestones and Timeliness Goals, Encl. 2-DPO-2006-003: DPO Milestones and Timeliness Goals, Encl. 3.. ML0627103522006-09-20020 September 2006 Response to NRC Regulatory Issue Summary 2006-15 Preparation and Scheduling of Operator Licensing Examinations 2023-09-28
[Table view] |
Text
R. Michael Glover Duke General Manager, Nuclear Plant Support EkEnergy Nuclear Corporate Duke Energy Corporation 526 South Church Street Charlotte, NC 28202 Mailing Address:
P. 0. Box 1006 EC07H Charlotte, NC 28201-1006 August 11,2011 704-382-6108 Mike.Glover@duke-energy.com U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: Document Control Desk
Subject:
Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, 50-270, 50-287 McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369, 50-370 Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413, 50-414 Response to NRC Regulatory Issue Summary 2011-08 Preparation and Scheduling of Operator Licensing Examinations On May 25, 2011, the NRC issued Regulatory Issue Summary (RIS) 2011-08, "Preparation and Scheduling of Operator Licensing Examinations." The subject RIS requested an update to the NRC on projected schedules for site-specific operator licensing examinations, as well as the estimated numbers of applicants planning to take operator licensing examinations and the NRC's generic fundamentals examinations (GFEs).
NRC Form 536, "Operator Licensing Examination Data" is attached as requested for Oconee, McGuire, and Catawba Nuclear Stations.
Please direct any questions to L. B. Jones at (704) 382-4753' Sincerely, R. Michael Glover Attachments pAc3o www. duke-energy.corn
U. S. Nuclear Regulatory Commission August 11, 2010 Page 2 xC:
V. M. McCree, Region II Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, Georgia 30303-1257 J. F. Stang, Jr., Senior Project Manager (ONS)
U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738 J. H. Thompson, Project Manager (CNS & MNS)
U. S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738 A. T. Sabisch NRC Senior Resident Inspector Oconee Nuclear Station J. Zeiler NRC Senior Resident Inspector McGuire Nuclear Station A. Hutto, III NRC Senior Resident Inspector Catawba Nuclear Station
COPY OF U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 NRC FORM 536 (10-2008) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Oconee A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 13 CY 14 CY 15 CY 16 ESTIMATED NUMBER OF LICENSEE-PREPARED 2 2 2 2 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED CY13 CY14 CY15 CY16 NUMBER NUMBER OF REACTOR 5 4 5 4 5 4 5 4 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS- 0 0 1 1 1 1 1 1 INSTANT NUMBER OF SENIOR REACTOR OPERATORS - 4 5 3 4 3 4 3 4 UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - 0 0 0 0 0 0 0 0 LIMITED PROPOSED DATES PRIMARY DATE 6-10-13 12-09-13 6-09-14 12-08-14 6-08-15 12-17-15 6-13-16 12-05-16 ALTERNATE DATE 6-24-13 12-02-13 6-23-14 12-01-14 6-22-15 11-30-15 6-20-16 12-12-16 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE)
PROPOSED CY13 CY 14 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 9 11 CANDIDATES COPY OF NRC FORM 536 (10-2008)
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, orby internet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION McGuire Nuclear Station II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 13 Cy 14 Cy 15 Cy 16 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 13 Cy 14 Cy 15 CY 16 NUMBER OF REACTOR 8 9 9 8 OPERATORS NUMBER OF SENIOR REACTOR 1 2 2 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 08/05/2013 08/04/2014 07/27/2015 07/25/2016 ALTERNATE DATE 07/08/2013 08/11/2014 08/03/2015 08/01/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 1*
NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER
NRC'FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 110-2008) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet EXAMINATION DATA e-mail to infoc0llects@nrc.gov, and to the Desk Officer, Office of Information and Regulatoiy Affairs, NEOB-10202. (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose'an information collection does not display a currently valid OMB control number,,the NRC may notcoriduct or sponsor, and a person is not required to respond to, the information collection.
FACIUTY Catawba Nuclear Station A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 13 CY 14 CY 15 Cy 16 ESTIMATED NUMBER OF LICENSEE-PREPARED I I 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 13 Cy 14 Cy 15 Cy 16 NUMBER OF REACTOR 6 6 6 9 OPERATORS NUMBER;OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 06/24/2013 05/12/2014 03/30/2015 02/29/2016 ALTERNATE DATE 07/08/2013 05/19/2014 04/06/2015 03/07/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I
NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER