MONTHYEARML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staffs Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230112023-08-25025 August 2023 Comprehensive Engineering Team Inspection Report 05000269/2023011 and 05000270/2023011 and 05000287/2023011 IR 05000269/20230052023-08-25025 August 2023 Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005) IR 05000269/20230022023-07-28028 July 2023 Integrated Inspection Report 05000269/2023002, 05000270/2023002 and 05000287/2023002 ML23208A0972023-07-27027 July 2023 Subsequent License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000269/20230102023-07-19019 July 2023 Biennial Problem Identification and Resolution Inspection Report 05000269/2023010 and 05000270/2023010 and 05000287/2023010 and Notice of Violation ML23178A0682023-07-0303 July 2023 Audit Plan Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 & 3 Systems Section XI, Division 1 ML23132A2392023-06-0101 June 2023 Summary of the April 2023 Remote Environmental Audit Related to the Review of the Subsequent License Renewal Application ML23144A0192023-05-25025 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report (O3R31) IR 05000269/20230012023-05-12012 May 2023 Integrated Inspection Report 05000269/2023001 and 05000270/2023001 and 05000287/2023001 ML23121A0552023-05-0303 May 2023 Acknowledgement of Withdrawal Request to Revise TS 5.5.2 Containment Leakage Rate Testing Program ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23117A0432023-04-20020 April 2023 Framatome, Inc., Part 21 Notification of Existence of a Defect ML23075A0732023-04-0505 April 2023 License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application Supplement (EPID Number L-2021-SLE-0002) ML23045A1332023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Achp Letter ML23045A1402023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - Shpo Letter ML23045A1432023-03-15015 March 2023 Request for Scoping Comments Concerning the Supplemental Environmental Review of Oconee Nuclear Station, Units 1, 2, and 3, Subsequent License Renewal Application - State Tribe Letter ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML23069A1102023-03-10010 March 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML23061A1772023-03-0303 March 2023 Notification of Oconee Nuclear Station Comprehensive Engineering Team Inspection - NRC Inspection Report 05000269/2023011, 05000270/2023011 and 05000287/2023011 IR 05000269/20220062023-03-0101 March 2023 Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006) ML23039A1632023-02-0808 February 2023 Requalification Program Inspection ML23037A0772023-02-0606 February 2023 402 Cyber Notification and RFI Letter Final IR 05000269/20220042023-02-0202 February 2023 Integrated Inspection Report 05000269 2022004 and 05000270/2022004 and 05000287/2022004 ML22363A3942023-01-12012 January 2023 Subsequent License Renewal Environmental Report Supplement - Proposed Review Schedule ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22321A0492022-12-0808 December 2022 Issuance of Amendment Nos. 426, 428 and 427, Additional Mode Change Limitations Applicable to the Adoption of TSTF- 359, Revision 9, Increase Flexibility in Mode Restraints ML22329A1042022-11-29029 November 2022 Review of the Fall 2021 Steam Generator Tube Inspection Report ML22321A1582022-11-22022 November 2022 Summary of Conference Call Regarding the Fall 2022 Steam Generator Tube Inspections ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000269/20220032022-11-0707 November 2022 Integrated Inspection Station 05000269/2022003 and 05000270/2022003 and 05000287/2022003 ML22301A0112022-11-0303 November 2022 Request for Withholding Information from Public Disclosure Regarding the SLR Application - September 2, 2022 ML22298A0752022-10-27027 October 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application Duke Energy Letter Dated July 25, 2022 ML22264A0322022-10-20020 October 2022 _Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application - Duke Energy Letter Dated July 8, 2022 IR 05000269/20220112022-09-26026 September 2022 NRC Inspection Report 05000269/2022011 and 05000270/2022011 and 05000287/2022011 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22222A0072022-09-14014 September 2022 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application ML22231B1362022-09-0101 September 2022 Review of the Draft Environmental Assessment and Findings of No Significant Impact for Catawba Nuclear Station, H.B. Robinson Steam Electric Plant, and Oconee Nuclear Station Independent Spent Fuel Storage Installation Decommissioning Fundi ML22234A0062022-08-30030 August 2022 SLRA - Closed Public Meeting Summary - August 18, 2022 2024-02-01
[Table view] Category:Project Plans and Schedules
MONTHYEARML0916801952009-06-10010 June 2009 Interim 30-Day Response to Reference 2 2009-06-10
[Table view] Category:Schedule and Calendars
MONTHYEARRA-23-0234, Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS)2023-09-28028 September 2023 Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS) ML22094A1902022-04-11011 April 2022 Schedule Revision for the Subsequent License Renewal Application Review ML21194A2452021-07-22022 July 2021 SLRA - Acceptance and Opportunity for Hearing - Letter ML11227A0242011-08-11011 August 2011 Units, 1, 2, & 3, McGuire, Units 1 & 2, Catawba, Units 1 & 2, Response to NRC Regulatory Issue Summary 2011-08, Preparation and Scheduling of Operator Licensing Examinations ML1030803572010-11-17017 November 2010 NFPA 805 Pilot License Amendment Request Review Schedule Update, November 2010 ML1029805882010-10-26026 October 2010 NFPA 805 Pilot License Amendment Request Review Schedule Update, October 2010 ML0932400582009-11-19019 November 2009 NFPA 805 Pilot License Amendment Request Review and Infrastructure Update, November, 2009 ML0916801952009-06-10010 June 2009 Interim 30-Day Response to Reference 2 ML0809900862008-04-0303 April 2008 Schedule for Providing Information Requested During March 18, 2008, Duke/Nrc Meeting Associated with the License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade.. ML0717804592007-05-30030 May 2007 Proposed Schedule 2007. Handout Reference for May 30-June 1, 2007, Fire Protection Transition Pilot Plant Observation Visit ML0711502382007-04-16016 April 2007 DPO-2006-003: DPO Followup Actions and Schedule ML0711502362007-04-16016 April 2007 DPO-2006-002: DPO Followup Actions and Schedule ML0711502242007-01-31031 January 2007 E-Mail from R. Pedersen, Dpopm, to EDO Extension Request, Subject: Extension Request for DPO (Atts.- 10/30/2006 e-mail to J. Grobe, Ades/Nrr, from R. Pedersen, Dpopm, Subject: DPOs 2006-002 and -003 Extension Request and Resolution Schedule ML0711502192006-12-18018 December 2006 Resolution Schedule for DPOs 2006-002 and 2006-003 ML0711502152006-11-0707 November 2006 Memo to L. Reyes, EDO, from R. Pedersen, Dpopm, Subject: Extension Request for DPOs 2006-002 and 2006-003, (Encl. 1-DPO-2006-002: DPO Milestones and Timeliness Goals, Encl. 2-DPO-2006-003: DPO Milestones and Timeliness Goals, Encl. 3.. ML0627103522006-09-20020 September 2006 Response to NRC Regulatory Issue Summary 2006-15 Preparation and Scheduling of Operator Licensing Examinations 2023-09-28
[Table view] |
Text
Pk Duke DA VE BAXTER Vice President avEnergy Oconee Nuclear Station Duke Energy ON01 VP / 7800 Rochester Highway Seneca, SC 29672 864-873-4460 864-873-4208 fax June 10, 2009 dabaxter@dukeenergy,com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C., 20555-0001
Subject:
Duke Energy Carolinas, LLC Oconee Nu6lear Station, Units 1, 2, and 3 Renewed Facility Operating License, DPR-38, DPR-47, and DPR-55 Docket Numbers 50-269, 50-270, and 50-287 Interim 30-Day Response to Reference 2.
References:
- 1. Duke Letter from Dave Baxter to NRC Document Control Desk, ý"Request for Extension of Duke Response Time to Referenced Letter [Reference 2]" dated May 20, 2009.
- 2. NRC Letter from Joseph G. Giitter to Dave Baxter, "Evaluation of Duke Energy Carolinas, LLC (Duke), September 26, 2008, Response to Nuclear Regulatory Commission (NRC) Letter dated August 15, 2008, Related to External Flooding at Oconee Nuclear Station, Units 1, 2, and 3 (Oconee) (TAC Nos. MD8224, MD8225, and MD8226)," dated April 30, 2009.
On May 11, 2009, Duke Energy Carolinas, LLC (Duke), Federal Energy Regulatory Commission (FERC) and Hydropower Consultant HDR-DTA personnel participated in a closed meeting at NRC headquarters with representatives from the Office of Nuclear Reactor Regulation (NRR) and Region II. At that meeting, Duke presented information regarding preliminary inundation studies and sensitivity analyses involving a postulated failure of the Jocassee Dam and potential flooding at Oconee.
By letter dated April 30, 2009 (Reference 2), the NRC requested that Duke provide its plan and schedule for completing the final inundation studies and sensitivity analyses within 30 days following the May 11, 2009, meeting. In addition, the letter stated that the NRC and Duke This letter and attachment contain security sensitive information.
Withhold from Public Disclosure under 10 CFR 2.390 (d)(1) 4Tha www.duke-energy.com
U. S. Nuclear Regulatory Commission June 10, 2009 Page 2 will begin holding monthly status meetings in June 2009 to further discuss these issues. On May 20, 2009, Duke responded to the April 30, 2009, letter by committing to provide an interim response within 30 days following the May 11, 2009, meeting and a final response within 60 days following that meeting.
The purpose of this letter is to provide Duke's interim 30 day response which includes , "Tentative Project Schedule for Completing the Final Inundation Studies and Sensitivity Analyses." This schedule will be discussed with the NRC staff during the monthly meeting scheduled for June 11, 2009.
Since this letter and the attachment contain commercially sensitive information, Duke hereby requests the NRC withhold the letter and the attachment from public disclosure pursuant to 10 CFR 2.390 (d) (1), "Public inspections, exemptions, requests for withholding."
If you have any questions on this matter, please contact Jeff Thomas, Fleet Regulatory Compliance Manager, at 864-873-2790 (Oconee) or 704-382-3438 (Charlotte).
Sincerely, Dave Baxter, Vice President Oconee Nuclear Station
Attachment:
- 1. Tentative Project Schedule for Completing the Final Inundation Studies and Sensitivity Analyses This letter and attachment contain security sensitive information.
Withhold from Public Disclosure under 10 CFR 2.390 (d)(1)
U. S. Nuclear Regulatory Commission June 10, 2009 Page 3 bc:
Mr. Luis Reyes USNRC - Region II Sam Nunn Atlanta Federal Center, Suite 23T85, 61 Forsyth St., SW, Atlanta, GA 30303-8931 Mr. J. F. Stang, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8 G9A Washington, DC 20555 Mr. Andy Hutto NRC Senior Resident Inspector Oconee Nuclear Station Susan E. Jenkins, Manager, Infectious and Radioactive Waste Management, Bureau of Land and Waste Management Department of Health & Environmental Control 2600 Bull Street, Columbia, SC 29201
Attachment I Tentative Project Schedule for Completing the Final Inundation Studies and Sensitivity Analyses ID 0 Apr Jun Jul Aua Se -I Oct Nov ____
1 Simplified Analysis of West Oconee Yard Inundation 2 ...... : 6130 Origination of Analysis 3 711................. 7120 Verification of Analys 4 7121 F: 8117 Final Report 5
w 2D Modeling and Analysis of West Oconee Yard Inundation 6/22 7/15 7 Development of Boundary Cortions 7116 1-h8131 20 Hydraulic Analysis 8 911 9/15 Preliminary Rep 9M16 9130 Duke Review 10 1011 1Re 1o Final Report Key Parametei Selection and Determination of Variation 12 5/18 6/26 Identification of Key" Parameters 13 6129 17115 Determination of Variation of k Parameters 14 7116 7131
- Documentation of Selected Parameters and their Variation 15
'w HEC-RAS Sensitivity Inundation Analysis 16 5/25 Preliminary Analysis Results 9115 17 Duke Review 18 11012 115 Final Report 19 20 22 23 24 25 DateWWed 6/10109 task Progress Summary External Tasks Deadline Split Milestone Project Summary ýExternal Milestone
.Thi hlttlr and attarhmpnt rnntain ;Pnirity tpn~itivu inqnrmatinn Withhold from Public Disclosure under 10 CFR 2.390 (d)(1)