ML071150238
Jump to navigation
Jump to search
| ML071150238 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 04/16/2007 |
| From: | NRC/OE |
| To: | |
| References | |
| DPO-2006-003, FOIA/PA-2007-0162 | |
| Download: ML071150238 (2) | |
Text
DPO-2006-003: Oconee Use of Leak Before Break in ECCS
Subject:
This DPO raises concerns about the installation of an ECCS LPI cross tie header at the Oconee facility. The submitter contends that the licensee should not have been allowed to use Leak Before Break technology for ECCS.
Assigned to:
Jim Dyer, NRR OD DPO Decision: 2/17/2007 DPO Follow Up Actions and Schedule Recommendation Number/Action Item Original Revised Lead Schedule Schedule*
Office
- 1. Develop a knowledge management document 03/16/07 04/16/071 NRR describing the NRC's policy and practice on the application of LBB (NRR Yellow Ticket 020060239) 1Division of Component Integrity needed more time to get this completed due to their work load.
NRC FORM 8C (7-94)
NRCMD 3.57 COVER SHEET FOR CORRESPONDENCE USE THIS COVER SHEET TO PROTECT ORIGINALS OF MULTI-PAGE CORRESPONDENCE