MONTHYEARML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22130A0092022-04-28028 April 2022 Duke Presentation for April 28, 2022 Public Meeting - Bolting Integrity ML22130A0102022-04-28028 April 2022 Duke Presentation for April 28, 2022 Public Meeting - Containment Liner ML22067A1992022-03-0303 March 2022 Annual Assessment Meeting Presentation ML22063A1142022-01-17017 January 2022 Duke Presentation for Public Meeting on February 17, 2022 ML21235A0452021-08-25025 August 2021 August 25, 2021, Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Public Environmental Scoping Meeting Presentation ML21102A0632021-04-14014 April 2021 ONS Slides for Pre-Application Meeting to Discuss Proposed Relief Request Related to Code Case N-853 ML21089A1732021-03-30030 March 2021 EOC Slides Final ML21081A1242021-03-22022 March 2021 EOC Slides Final ML20300A0902020-10-27027 October 2020 Subsequent License Renewal Environmental Pre-Application Meeting - NRC Presentation ML20300A0872020-10-27027 October 2020 Subsequent License Renewal Application NRC Environmental Pre-Application Meeting - Duke Energy Presentation ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19302E0512019-11-0606 November 2019 High Energy Line Break License Amendment Public Meeting ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML19207A0172019-07-30030 July 2019 Summary of Meeting with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment Request for Oconee Nuclear Station, Units 1, 2, and 3 Regarding High Energy Line Break Licensing Basis ML18227B3212018-09-0505 September 2018 Tornado License Amendment Pre-Application Meeting Slides ML18134A2292018-05-14014 May 2018 Summary of April 26, 2018, Public Teleconference with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment and 3 Regarding Technical Specification 3.8.1 ML17258A0122017-09-26026 September 2017 Presentation Slide Regarding Committee to Review Generic Requirements Meeting on Oconee Nuclear Station Cable Separation TIA ML15348A2032015-12-14014 December 2015 Duke Energy Presentation in Support of December 15, 2015, Public Meeting with NRC Staff Cable Testing Discussion for Proposed 50.55a Alternative Request ML15343A1142015-12-0808 December 2015 NRC Questions to Duke Energy Regarding Cable Testing in Support of Public Meeting on 12/15/15 ML15321A1782015-11-17017 November 2015 Presentation Material in Support of November 18, 2015 Pre-Application Meeting Between NRC and Duke 50.55a(z) Alternative to Code and Standards Requirements ML15286A0762015-10-13013 October 2015 Duke Energy Presentation in Support of October 13, 2015, Public Meeting with NRC Staff Pre-Application Meeting for LAR to Support Khu Stator Replacement. (Revised) ML15282A0722015-10-0909 October 2015 Duke Energy Presentation in Support of October 13, 2015, Public Meeting with NRC Staff Pre-Application Meeting for LAR to Support Khu Stator Replacement ML15148A2632015-05-27027 May 2015 Meeting Slides from the May 27, 2015 Oconee Major Projects Between Duke Energy and NRC ML15113A6262015-04-23023 April 2015 April 14, 2015 Summary of Public Meeting on Oconee Nuclear Station, Units 1, 2 and 3 to Discuss the Annual Assessment ML14356A0062014-12-0303 December 2014 Presentation at December 3, 2014, Category 1 Public Meeting with Duke Energy Carolinas, LLC to Discuss NTTF Recommendation 2.1, Flooding Response ML14211A2132014-07-31031 July 2014 Duke Energy Presentation for 2014-07-31 Meeting ML14211A2162014-07-31031 July 2014 NRC Meeting Slides 7-31-14 Reg Conference ML14147A3652014-05-27027 May 2014 Annual Assessment Public Meeting Summary Memo ML14058A0772014-02-0404 February 2014 Slides on Oconee Ssf Flood Barrier Breach SDP Lessons Learned ML14058A0742014-02-0404 February 2014 Slides on Oconee Ssf Flood Barrier Breach SDP - Lessons Learned ML14058A0482014-02-0404 February 2014 NRR Briefing on Oconee Flood Protection (Nrr/Dra) ML13336A5452013-11-13013 November 2013 Presentation Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Keowee Hydro Unit Generator Field Pole Rewind Project - License Amendment Request ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13275A2692013-10-0303 October 2013 10/3/13 Presentation Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Protected Service Water Alternate Cooling ML13275A2252013-09-24024 September 2013 9/24/13 Meeting Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Jocassee Dam Seismic Analysis ML13239A3372013-08-27027 August 2013 NRC Meeting Slides, Oconee Major Project Meeting - August 28, 2013 ML13239A3402013-08-27027 August 2013 Presentation for NRC Projects ML13099A4472013-04-10010 April 2013 Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Milestones for Corrective Actions for an Apparent Violation of a License Condition on Fire Protection ML13095A2132013-04-0909 April 2013 Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, External Flood Reevaluation ML13123A2042013-03-25025 March 2013 Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Concerning the Flooding Hazard Reevaluation Report ML13064A1022013-03-0505 March 2013 Slides from Predecisional Enforcement Conference with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Apparent Violation of a License Condition on Fire Protection ML13056A1042013-02-0606 February 2013 Briefing Slides on the Fliod Scenario Rupture of Jocassee Dam ML13056A1032013-02-0606 February 2013 Briefing on Draft Information Notice - Potential Nonconservative Screening Value for Dam Failure Frequency in Probabilistic Risk Assessments. ML13056A1022013-02-0606 February 2013 Meeting Slides on Oconee Flood Issue Jocassee Dam Failure Frequency ML13056A0992013-02-0606 February 2013 Meeting Slides on Oconee Ssf Flood Barrier Breach Sdsp - Lessons Learned ML13052A7822013-02-0606 February 2013 Slides on Oconee Ssf Flood Barrier Breach SDP - Lessons Learned ML13035A2442013-01-30030 January 2013 Projects Meeting - NRC Slides ML13035A2332013-01-30030 January 2013 Projects Meeting - Licensee'S Public Meeting Slides 2022-09-14
[Table view] Category:Slides and Viewgraphs
MONTHYEARML23087A2972023-04-17017 April 2023 Annual Assessment Meeting Presentation ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22130A0102022-04-28028 April 2022 Duke Presentation for April 28, 2022 Public Meeting - Containment Liner ML22130A0092022-04-28028 April 2022 Duke Presentation for April 28, 2022 Public Meeting - Bolting Integrity ML22109A2122022-04-20020 April 2022 Duke Energy Pre-Submittal Public April 20, 2022, Meeting Presentation ML22075A2012022-03-0707 March 2022 Duke 03/07/2022 Presentation - Bolting Integrity ML22067A1992022-03-0303 March 2022 Annual Assessment Meeting Presentation ML22301A1672022-02-0505 February 2022 Presentation 5 - Oconee Trip and Notification of Unusual Event on February 5, 2022 ML22063A1142022-01-17017 January 2022 Duke Presentation for Public Meeting on February 17, 2022 ML21322A3262021-11-29029 November 2021 Duke Energy November 29, 2021 Pre-Submittal Public Meeting Slides for EOF Relocation Licensing Amendment Request ML21235A0452021-08-25025 August 2021 August 25, 2021, Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Public Environmental Scoping Meeting Presentation ML21102A0632021-04-14014 April 2021 ONS Slides for Pre-Application Meeting to Discuss Proposed Relief Request Related to Code Case N-853 ML21089A1732021-03-30030 March 2021 EOC Slides Final ML21081A1242021-03-22022 March 2021 EOC Slides Final ML21034A5552021-01-26026 January 2021 SLRA - NRC Presubmittal Meeting Slides ML21034A5562021-01-26026 January 2021 SLRA - Duke Presubmittal Meeting Slides ML20300A0872020-10-27027 October 2020 Subsequent License Renewal Application NRC Environmental Pre-Application Meeting - Duke Energy Presentation ML20300A0902020-10-27027 October 2020 Subsequent License Renewal Environmental Pre-Application Meeting - NRC Presentation ML20134J0052020-05-13013 May 2020 EOC Slides (2) ML20125A2312020-05-0404 May 2020 EOC Slides ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19302E0512019-11-0606 November 2019 High Energy Line Break License Amendment Public Meeting ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML18086A7742018-02-21021 February 2018 LOR Program Biennial Inspection 71111.11B Exam Overlap Issues ML17296A1462017-10-24024 October 2017 Duke Energy Presentation to CRGR - Oconee Nuclear Station ML17258A0122017-09-26026 September 2017 Presentation Slide Regarding Committee to Review Generic Requirements Meeting on Oconee Nuclear Station Cable Separation TIA ML15348A2032015-12-14014 December 2015 Duke Energy Presentation in Support of December 15, 2015, Public Meeting with NRC Staff Cable Testing Discussion for Proposed 50.55a Alternative Request ML15282A0722015-10-0909 October 2015 Duke Energy Presentation in Support of October 13, 2015, Public Meeting with NRC Staff Pre-Application Meeting for LAR to Support Khu Stator Replacement ML15148A2632015-05-27027 May 2015 Meeting Slides from the May 27, 2015 Oconee Major Projects Between Duke Energy and NRC ML15113A6262015-04-23023 April 2015 April 14, 2015 Summary of Public Meeting on Oconee Nuclear Station, Units 1, 2 and 3 to Discuss the Annual Assessment ML14356A0062014-12-0303 December 2014 Presentation at December 3, 2014, Category 1 Public Meeting with Duke Energy Carolinas, LLC to Discuss NTTF Recommendation 2.1, Flooding Response ML14211A2132014-07-31031 July 2014 Duke Energy Presentation for 2014-07-31 Meeting ML14211A2162014-07-31031 July 2014 NRC Meeting Slides 7-31-14 Reg Conference ML14147A3652014-05-27027 May 2014 Annual Assessment Public Meeting Summary Memo ML14058A0512014-02-0404 February 2014 Slides on Oconee Nuclear Station - Standby Shutdown Facility (Ssf) Flood Barrier Breach Violation SDP Assessment ML14058A0352014-02-0404 February 2014 Meeting Slides on Oconee Flood Protection and the 10 CFR 50.54(f) Response ML14055A4102014-02-0404 February 2014 Meeting Slides on Standby Shutdown Facility Flood Barrier Breach Violation Informal Reassessment ML14058A0742014-02-0404 February 2014 Slides on Oconee Ssf Flood Barrier Breach SDP - Lessons Learned ML14058A0772014-02-0404 February 2014 Slides on Oconee Ssf Flood Barrier Breach SDP Lessons Learned ML13336A5452013-11-13013 November 2013 Presentation Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Keowee Hydro Unit Generator Field Pole Rewind Project - License Amendment Request ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13275A2692013-10-0303 October 2013 10/3/13 Presentation Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Protected Service Water Alternate Cooling ML13275A2252013-09-24024 September 2013 9/24/13 Meeting Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Jocassee Dam Seismic Analysis ML13239A3402013-08-27027 August 2013 Presentation for NRC Projects ML13239A3372013-08-27027 August 2013 NRC Meeting Slides, Oconee Major Project Meeting - August 28, 2013 ML13226A2662013-05-0303 May 2013 E-mail from J. Boska, NRR to S. Hicks, Ois FW: Change in Public Availability of Slide Package ML13226A2592013-04-23023 April 2013 E-mail from D. Hubbard, Duke to J. Boska, NRR on Non-Security Sensitive Version of March 25th Presentation ML13226A2652013-04-23023 April 2013 E-mail from D. Hubbard, Duke to J. Boska, NRR on Security Sensitive Version ML13099A4472013-04-10010 April 2013 Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Milestones for Corrective Actions for an Apparent Violation of a License Condition on Fire Protection 2023-04-17
[Table view] |
Text
Oconee Nuclear Station High Energy Line Break License Amendment Public Meeting One White Flint, Rockville, MD November 6, 2019
Attendees Duke Attendees:
Howard T Grant (Todd), General Manager, Oconee Engineering Dean M Hubbard (Dean), Director, Oconee Regulatory Projects Timothy D Brown (Tim), Manager, Oconee Regulatory Projects Christopher P King (Chris), Manager, Oconee Regulatory Projects Jason A Patterson (Jason), Lead Engineer, Oconee Regulatory Projects McLain M Hubbard (McLain), Senior Engineer, Oconee Regulatory Projects Michael E Henshaw (Eric), Principal Engineer, Corporate Safety Analysis Christopher J Wasik (Chris), Licensing Consultant, Corporate Regulatory Affairs and Licensing 2
Agenda Opening Remarks Oconee High Energy Line Break (HELB) Current Licensing Basis (CLB)
HELB Licensing Timeline Existing HELB Commitments New HELB Licensing Basis (LB)
New HELB Licensing Documentation Discussion of HELB LAR New HELB Conforming Actions Closing Remarks 3
Opening Remarks High Energy Line Break License Amendment Request Oconee Nuclear Station submitted a license amendment on 8/28/2019 to clarify and update the High Energy Line Break (HELB) licensing basis.
The submittal supersedes the original 1973 HELB current licensing basis and the 2011 LAR submittal.
This is the culmination of many hours of analysis, plant surveys, and meetings with the NRC technical staff.
The revised LAR is based on over 3600 breaks/cracks postulated per unit and over sixty new calculations that were created in the reconstitution project.
The remaining 2017 re-baselined HELB commitments are to be completed. New conforming actions are provided in this LAR.
4
Oconee HELB CLB HELB was originally licensed during the 1973 timeframe to the Giambusso/Schwencer requirements.
Safe shutdown capability maintained following HELB.
No structural damage preventing ability to reach cold shutdown.
Single active failure required.
Environmental conditions shall not impact mitigating electrical equipment.
5
Oconee HELB CLB Oconee responded to the Giambusso/Schwencer letters through design report MDS OS-73.2, Analysis of Effects Resulting from Postulated Piping Breaks Outside Containment for Oconee Nuclear Station, Units 1, 2, & 3.
High Energy (HE) Systems are defined as systems whose normal service (100% power) operating temperature is greater than 200 degrees F or normal service operating pressure greater than 275 psig.
Approximately 40 break locations were postulated and descriptions were provided of the safe shutdown strategies for those breaks that affect the response of the core and Reactor Coolant System (e.g. Postulated ruptures in the Main Steam and Main Feedwater systems).
HELB was not defined as a design basis event in the Oconee CLB.
The Atomic Energy Commission approved the design report as part of the initial Units 2 & 3 SER (7/6/1973).
6
HELB Licensing Timeline July 1998 Oconee completes a self assessment of the HELB Design Basis.
December 1998 NRC Inspection Report violations - Oconee committed to reconstitute the HELB licensing basis.
2001-2005 Oconee worked with the NRC to gain agreement on criteria for identifying high energy systems, postulated break and crack locations, modes of plant operations applicable to the postulation of breaks, and application of single failures.
2007 NRC letter provided general agreement with the criteria to be used in the HELB analyses (McGinty Letter).
2008-2009 Oconee submitted unit specific LARs.
7
HELB Licensing Timeline 2011 The Unit specific LARs were consolidated into one LAR and resubmitted.
2012 The NRC suspended review of the HELB LAR to concentrate on licensing PSW (which was credited in the HELB LAR).
PSW SER Received - August 13, 2014.
PSW Installation Complete - December 22, 2015.
Revised HELB LAR submitted - August 28, 2019.
NRC accepted revised HELB LAR for review - October 1, 2019.
8
HELB Commitments HELB Commitments from 2017 Re-baseline 45 Original Commitments.
8 Remain to be completed.
Notable HELB Commitments Completed Protected Service Water.
Flood outlet devices, flood impoundment, and exterior door improvements for the Units 1, 2, & 3 East Penetration Room (EPR) and Auxiliary Building.
9
HELB Commitments Notable HELB Commitments Completed / continued Remote operators for Unit 1 and 3 valves HP-103 & HP-107 on the individual suction-lines to the 'A' & 'B' High Pressure Injection (HPI) pumps.
Operator change out of Unit 2 and 3 normal letdown valves HP-1 & HP-2.
10
HELB Commitments Remaining HELB Commitments Structural modifications to selected columns in the Turbine Building.
Control Complex Cooling modifications.
Remote operators for Unit 2 valves HP-103 & HP-107 on the individual suction-lines to the 'A' & 'B' High Pressure Injection (HPI) pumps.
Operator change out of Unit 1 normal letdown valves HP-1 & HP-2.
11
New HELB LB Proposes the PSW system or SSF for HELB mitigation when a HELB results in the loss of plant systems needed for safe shutdown (SSD) inside the turbine building (TB).
Proposes normal plant systems (i.e., high pressure injection (HPI),
emergency feedwater (EFW)) or the SSF for HELB mitigation when a HELB results in the loss of plant systems needed for SSD inside the auxiliary building (AB).
Proposes normal plant systems for HELB mitigation when a HELB occurs outside of the TB or AB.
Excludes certain systems and subsystems from HELB consideration due to the short time these systems operate at HE conditions.
12
New HELB LB Modifies break selection criteria as allowed by Generic Letter (GL) 87-11 and portions of the Standard Review Plan (SRP) Branch Technical Position (BTP) Mechanical Engineering Branch (MEB) 3-1.
Proposes the use of NUREG/CR-2913 for the determination of effective length of jets from a HELB or critical crack.
Proposes the use of a repair strategy for establishment of cold shutdown (CSD) for breaks postulated to occur in the TB.
Maintains HELB as a separate and distinct requirement versus the pipe ruptures considered as design basis events (e.g. Main Steam Line Breaks).
13
New HELB Licensing Documentation Licensing Document Changes Supersedes original 1973 CLB responses to the Giambusso/Schwencer letters.
Supersedes the 2011 LAR submittal and associated RAIs.
Significant rewrite of UFSAR Chapter 3.6, including:
Methodology for the identification of HE systems.
Methodology for the identification of break/crack locations.
Methodology for the determination of break types.
Shutdown Sequence Evaluation Criteria.
Interaction Evaluation Criteria.
Overall HELB Mitigation Strategy (including Safe Shutdown objectives and functions to meet those objectives).
No changes to Technical Specifications.
14
Discussion of HELB LAR LAR Composition (NEI 06-02 guidelines)
Cover Letter Enclosure 1.0 Summary Description.
2.0 Detailed Description.
System Design and Operation.
Current Technical Specifications Requirements.
Reason for the Proposed Change.
Description of the Proposed Change.
UFSAR Changes.
15
Discussion of HELB LAR LAR Composition / continued Enclosure / continued 3.0 Technical Evaluation.
Purpose and Methodology.
HELB Strategy.
Regulatory Requirements.
Arbitrary Intermediate HELBs and Critical Cracks.
Excluded Systems.
Operations Response, Training and Procedures.
Thermal Hydraulic Analyses.
16
Discussion of HELB LAR LAR Composition / continued Enclosure / continued 4.0 Regulatory Evaluation.
Applicable UFSAR.
Precedent.
Significant Hazards Consideration.
5.0 Environmental Consideration.
6.0 References.
7.0 Acronyms.
17
Discussion of HELB LAR LAR Composition / continued Attachments Attachment 1 Commitments/Conforming Actions Attachment 2 UFSAR Markups.
Attachment 3 UFSAR Retypes.
Attachment 4 Thermal Hydraulic Models for High Energy Line Break Transient Analysis (Proprietary).
Attachment 5 Thermal Hydraulic Models for High Energy Line Break Transient Analysis (Non-Proprietary).
Attachment 6 Thermal Hydraulic Transient Analysis for Evaluation of High Energy Line Breaks.
18
Discussion of HELB LAR LAR Composition / continued Attachments / continued Attachment 7 Duke Proprietary Affidavit.
Attachment 8 Framatome Proprietary Affidavit.
Attachment 9 Regulatory Requirements.
Attachment 10 Definitions.
Attachment 11 Time Critical Operator Actions.
Attachment 12 Feasibility Assessment for New Time Critical Operator Actions.
19
New HELB Conforming Actions New HELB Conforming Actions QA-1 SSF CR Instrumentation for Steam Generator pressure, nuclear instrumentation, core exit thermocouples, pressurizer temperature, and temperature compensated pressurizer level.
Elimination of cross connect Control Rod Drive power between units.
Upgraded SSF Letdown line.
Environmental Qualification of SSF related components located in the West Penetration and the Cask Decontamination Tank Rooms.
Modification to isolate Low Pressure Service Water valves 1,2,3LPSW-1119 and 1120.
Time Critical Operator Action Validation 20
Closing Remarks Oconee Nuclear Station license amendment on High Energy Line Break will clarify and update the sites license basis for HELB.
Substantial resources and time have been invested to address regulatory questions and to assure that the site is prepared to respond to an unlikely HELB event.
A majority of the prior HELB commitments have been met including significant plant modifications that have already been completed.
Additional modifications to support an updated HELB response are planned and budgeted to complete the sites HELB response.
The site looks forward to working with the NRC to complete the HELB LAR review.
21
22