Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23341A152 | 7 December 2023 | December 11, 2023 Public Meeting - RIPE Exemption Request - Licensee Slides | Large early release frequency Exemption Request |
ML22251A235 | 14 September 2022 | Presentation Slides for September 14, 2022, Observation Public Meeting | |
ML22153A384 | 6 June 2022 | Duke Energy Presentation Material for June 6, 2022 Public Meeting on GSI-191 Closeout | Coatings |
ML22130A009 | 28 April 2022 | Duke Presentation for April 28, 2022 Public Meeting - Bolting Integrity | Aging Management License Renewal Subsequent License Renewal Biofouling Thermography |
ML22130A010 | 28 April 2022 | Duke Presentation for April 28, 2022 Public Meeting - Containment Liner | Subsequent License Renewal |
ML22091A133 | 1 April 2022 | Bru Har Combined 2021 Assessment Meeting Slides | Condition Adverse to Quality Coronavirus |
ML22067A199 | 3 March 2022 | Annual Assessment Meeting Presentation | Coronavirus |
ML22063A114 | 17 January 2022 | Duke Presentation for Public Meeting on February 17, 2022 | License Renewal Subsequent License Renewal Thermal fatigue |
ML21235A045 | 25 August 2021 | August 25, 2021, Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Public Environmental Scoping Meeting Presentation | License Renewal Subsequent License Renewal Environmental Justice |
ML21102A063 | 14 April 2021 | ONS Slides for Pre-Application Meeting to Discuss Proposed Relief Request Related to Code Case N-853 | Weld Overlay Stress corrosion cracking |
ML21089A173 | 30 March 2021 | EOC Slides Final | Coronavirus |
ML21081A124 | 22 March 2021 | EOC Slides Final | Coronavirus |
ML20300A087 | 27 October 2020 | Subsequent License Renewal Application NRC Environmental Pre-Application Meeting - Duke Energy Presentation | Probabilistic Risk Assessment Large early release frequency License Renewal Subsequent License Renewal |
ML20300A090 | 27 October 2020 | Subsequent License Renewal Environmental Pre-Application Meeting - NRC Presentation | License Renewal Subsequent License Renewal |
ML20100G634 | 9 April 2020 | Revised- Bru 2019 Annual Assessment Meeting Slides | COVID-19 |
ML19318F291 | 18 November 2019 | Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request | Finite Element Analysis Stress corrosion cracking |
ML19302E051 | 6 November 2019 | High Energy Line Break License Amendment Public Meeting | Safe Shutdown Time Critical Operator Action Affidavit |
ML19214A056 | 7 August 2019 | Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 | |
ML19207A017 | 30 July 2019 | Summary of Meeting with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment Request for Oconee Nuclear Station, Units 1, 2, and 3 Regarding High Energy Line Break Licensing Basis | Safe Shutdown Time Critical Operator Action GOTHIC Affidavit Manual Operator Action |
ML19077A367 | 14 March 2019 | March 14, 2019 Pre-submittal Meeting TS DNBR Safety Limit Change LAR Meeting Slides | Anticipated operational occurrence |
ML18351A134 | 20 December 2018 | December 20, 2018 Pre-submittal Meeting Slides for Escw Risk-Informed LAR | Probabilistic Risk Assessment Fire impairment Maintenance Rule Program |
ML18333A182 | 8 November 2018 | Pre-Submittal Meeting - November 8, 2018 - License Amendment Request for Shearon Harris Nuclear Power Plant Emergency Plan Revision | Siren |
ML18227B321 | 5 September 2018 | Tornado License Amendment Pre-Application Meeting Slides | Safe Shutdown Mission time Tornado Missile Probabilistic Risk Assessment TORMIS Affidavit |
ML18134A229 | 14 May 2018 | Summary of April 26, 2018, Public Teleconference with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment and 3 Regarding Technical Specification 3.8.1 | Manual Operator Action |
ML17331A627 | 29 November 2017 | Duke Energy Pre-Submittal Meeting Presentation, Brunswick, Harris, and Robinson License Amendment Requests Regarding 10 CFR 50.69 | High winds |
ML17258A012 | 26 September 2017 | Presentation Slide Regarding Committee to Review Generic Requirements Meeting on Oconee Nuclear Station Cable Separation TIA | Operability Determination Backfit |
ML17250B238 | 30 August 2017 | TMRE Presubmittal NRC | Safe Shutdown High winds Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Incorporated by reference Tornado-Generated Missile Tornado Generated Missile Tornado Missile Protection Tornado Missile Risk Evaluator Earthquake |
ML17044A089 | 2 March 2017 | EDG SR Presubmittal Meeting March 2, 2017 | Safe Shutdown Stroke time |
ML16267A029 | 29 September 2016 | SFP Pre-Submittal Meeting Slides - BWR Storage Rack Inserts, Updated NCS Analysis at Harris Nuclear Plant | |
ML16112A293 | 2 May 2016 | 05/02/2016 Presentation for Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson And Shearon Harris Plants (CAC Nos. MF7443 And MF7444) | |
ML15348A203 | 14 December 2015 | Duke Energy Presentation in Support of December 15, 2015, Public Meeting with NRC Staff Cable Testing Discussion for Proposed 50.55a Alternative Request | Arc flash |
ML15343A114 | 8 December 2015 | NRC Questions to Duke Energy Regarding Cable Testing in Support of Public Meeting on 12/15/15 | Arc flash |
ML15321A178 | 17 November 2015 | Presentation Material in Support of November 18, 2015 Pre-Application Meeting Between NRC and Duke 50.55a(z) Alternative to Code and Standards Requirements | Tornado Missile Aging Management Large early release frequency Earthquake Weak link |
ML15286A076 | 13 October 2015 | Duke Energy Presentation in Support of October 13, 2015, Public Meeting with NRC Staff Pre-Application Meeting for LAR to Support Khu Stator Replacement. (Revised) | Safe Shutdown Mission time FLEX |
ML15282A072 | 9 October 2015 | Duke Energy Presentation in Support of October 13, 2015, Public Meeting with NRC Staff Pre-Application Meeting for LAR to Support Khu Stator Replacement | Safe Shutdown Mission time FLEX |
RA-15-0041, Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted) | 18 September 2015 | Attachment 1, Affidavit and Attachment 3, Pre-Submittal Meeting Presentation Materials on DPC-NF-2010-A and DPC-NE-2011-P Methodologies (Redacted) | Affidavit |
ML15148A263 | 27 May 2015 | Meeting Slides from the May 27, 2015 Oconee Major Projects Between Duke Energy and NRC | Fire Barrier Probabilistic Risk Assessment Cyber Security NFPA 805 FLEX Fire Protection Program |
ML15113A626 | 23 April 2015 | April 14, 2015 Summary of Public Meeting on Oconee Nuclear Station, Units 1, 2 and 3 to Discuss the Annual Assessment | |
ML14356A006 | 3 December 2014 | Presentation at December 3, 2014, Category 1 Public Meeting with Duke Energy Carolinas, LLC to Discuss NTTF Recommendation 2.1, Flooding Response | |
ML14211A213 | 31 July 2014 | Duke Energy Presentation for 2014-07-31 Meeting | Non-Destructive Examination Safe Shutdown Earthquake Probabilistic Risk Assessment Condition Adverse to Quality Pressure boundary leak Through-Wall Leak Downpower Unidentified leakage Thermal fatigue |
ML14211A216 | 31 July 2014 | NRC Meeting Slides 7-31-14 Reg Conference | Condition Adverse to Quality |
ML14147A365 | 27 May 2014 | Annual Assessment Public Meeting Summary Memo | |
ML14129A335 | 9 May 2014 | Summary of Category 1 Public Meeting - Annual Assessment of Shearon Harris Nuclear Plant | |
ML14058A077 | 4 February 2014 | Slides on Oconee Ssf Flood Barrier Breach SDP Lessons Learned | Backfit |
ML14058A074 | 4 February 2014 | Slides on Oconee Ssf Flood Barrier Breach SDP - Lessons Learned | Backfit |
ML14058A048 | 4 February 2014 | NRR Briefing on Oconee Flood Protection (Nrr/Dra) | Significance Determination Process License Renewal Backfit |
ML13336A545 | 13 November 2013 | Presentation Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Keowee Hydro Unit Generator Field Pole Rewind Project - License Amendment Request | Safe Shutdown Mission time |
ML13312A988 | 8 November 2013 | Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications | |
ML13308A007 | 1 November 2013 | Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. | |
ML13275A269 | 3 October 2013 | 10/3/13 Presentation Slides from Meeting with Duke Energy Carolinas, LLC, Oconee Nuclear Station Units 1, 2, and 3, Protected Service Water Alternate Cooling | Safe Shutdown GOTHIC |