Oconee Nuclear Station Pre-Submittal Meeting - November 18, 2015 10 CFR 50.55a(z) - Alternatives to Codes and Standards Requirements

Duke Energy Participants Scott Batson, Site Vice President Ed Burchfield, Engineering General Manager Todd Grant, Assistant Operations Manager Ray Price, Electrical Engineering Manager Chris Wasik, Regulatory Affairs Manager Chris Nolan, Director, Nuclear Fleet Regulatory Affairs Art Zaremba, Licensing Manager, Nuclear Fleet Regulatory Affairs Steve Kimbrough, Lead Analyst, Nuclear Fleet PRA For Information Only 2

Agenda Opening Remarks Scott Batson Background and Submittal Overview Chris Wasik Quality and Safety of Proposed Alternatives Ed Burchfield Closing Remarks Scott Batson For Information Only 3

Opening Remarks Scott Batson Site Vice President For Information Only 4

Background and Submittal Overview Chris Wasik Regulatory Affairs Manager For Information Only 5

Background and Submittal Overview

Background

2014 Component Design Basis Inspection (CDBI) Report

- 125 VDC control cables for train A of the ESPS [Engineered Safeguards Protective System] and cables for supervisory control of both KHUs [Keowee Hydro Units]were installed in the same underground concrete raceway systems as the 4160 VAC auxiliary power cables, 13.8 kVAC power cables for both emergency power and protected service water (PSW), and were in close proximity to these power cables. The team was concerned that a short circuitin the 13.8 kVAC cables could induce voltage and currents in the DC control system which could potentially impact the functionality of the emergency power system...

- A similar issue exists in Manhole 6 of the PSW underground raceway where the new power supply to the PSW (adjacent to the 125 VDC control emergency power system) could short circuit or fault to ground.

- Unresolved issue (URI) opened to track the concern.

For Information Only 6

Background and Submittal Overview Background (cont.)

Task Interface Agreement (TIA) 2014-05

- TIA seeks technical support as to whether or not the cable configuration in the noted underground raceways meets the existing Oconee licensing basis, design basis.

In the interim, Oconee has conducted additional cable testing and is implementing plant modifications to address the concerns identified in the URI.

For all 3 units, the existing cable configuration is considered operable but nonconforming with the current licensing basis.

For Information Only 7

Background and Submittal Overview 10 CFR 50.55a(z) - Alternatives to Codes and Standards Requirements 10 CFR 50.55a(h)(2), Protection Systems For plants with Construction Permits issued before 1/1/1971, regulation requires compliance with the licensing basis (IEEE Std. 279-1971 for Oconee).

10 CFR 50.55a(z), Alternatives to Codes and Standards Requirements Alternativesmay be usedThe applicant or licensee must demonstrate that:

(1) Acceptable level of quality and safety. The proposed alternative would provide an acceptable level of quality and safety; or (2) Hardship without a compensating increase in quality and safety. Compliance with the specified requirements of this section would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.

For Information Only 8

Background and Submittal Overview 10 CFR 50.55a(z) - Alternatives to Codes and Standards Requirements (cont.)

10 CFR 50.55a(z) submittal will propose an alternative approach to meeting 10 CFR 50.55a(h)(2),

(i.e., IEEE Std. 279-1971).

Submittal will demonstrate that the proposed alternatives provide an acceptable level of quality and safety.

NRC approval would revise and clarify the Oconee licensing basis and allow for resolution of the nonconforming condition.

For Information Only 9

Quality and Safety of Proposed Alternatives Ed Burchfield Engineering General Manager For Information Only 10

Quality and Safety of Proposed Alternatives Trench 3 and PSW Ductbank Layout 11 For Information Only

Quality and Safety of Proposed Alternatives This discussion on the bases for acceptability of the proposed alternatives is divided in to two (2) main sections:

1. Common Elements (applicable to all four plant areas)

Cable Crush Testing Cable Fault Testing Risk Insights

2. Proposed Alternatives and Bases for Each of the Plant Areas Trench 3 PSW Ductbank Manholes 1-5 PSW Ductbank Manhole 6 and PSW Cable Spreading Area Keowee Mechanical Equipment Gallery For Information Only 12

Quality and Safety of Proposed Alternatives Cable Crush Testing Testing performed to confirm the mechanical properties of the bronze tape cable design employed at Oconee.

13.8 kV and 4.16 kV single conductor power cables tested.

Testing was conducted at Okonites High Voltage Laboratory in February 2015.

Performed impact, increasing crush and crush tests based on Underwriters Laboratories (UL)

Standard 1569, Metal Clad Cables.

Test report is documented in Oconee letter to NRC dated March 27, 2015 (ML15139A050).

Test results demonstrated the cable design with a bronze tape shield provides mechanical protection to perform as armored cable based on UL Test 1569, Sections 24, 25, and 26.

For Information Only 13

Quality and Safety of Proposed Alternatives Cable Fault Testing - Overview Between November 2-6, 2015, tests were conducted at the KEMA Laboratories outside of Philadelphia, PA.

The primary purpose of the cable fault testing was to determine if a single cable failure (line-ground fault) on a single medium voltage power cable would propagate to a multi-phase fault and damage adjacent cables.

A secondary purpose was to determine if low voltage control cables installed near the faulted cable would be damaged and if unacceptable voltage would be induced on the low voltage conductors.

Four (4) different configurations tested, five (5) times each (20 tests total).

No single cable failure resulted in propagation to a multi-phase fault.

No damage or adverse impacts on control cables.

For Information Only 14

Quality and Safety of Proposed Alternatives Cable Fault Testing - Setup The test setups used were configured in a manner to maximize the potential for a single cable phase to ground fault to propagate into a multi-phase fault.

Test fault currents and associated durations bound the Oconee plant fault currents and associated durations for cables of concern.

- Oconee configuration does not utilize breaker reclosure feature.

The tests were conducted on cables identical to existing plant cables installed in the following plant locations:

- 13.8 kV Keowee Underground Path (Keowee to Transformer CT-4),

- 4.16 kV Keowee Underground Path (Breaker 1TC-04 to Keowee Transformer CX),

- 13.8 kV Fant Path (Manhole 6 to PSW Switchgear),

- 13.8 kV PSW Underground Path (Keowee to PSW Switchgear).

For Information Only 15

Quality and Safety of Proposed Alternatives Cable Fault Testing - Setup (contd)

The cable fault was created by drilling a small hole into the cable, installing a small piece of wire, and orienting the hole directly at an adjacent power cable.

- This is a conservative arrangement in terms of directing the energy release into the adjacent phase power cable.

- Drilling the hole in the shield to induce the fault is conservative in that the barrier to help contain the fault currents is breached on purpose, thus creating a weak link.

Un-bonded cable tray utilized as specimen support with cable cleats to maintain minimal separation of power cables at the fault location and to minimize adjacent current paths.

For Information Only 16

Quality and Safety of Proposed Alternatives Test Arrangement Examples For Information Only 17

Quality and Safety of Proposed Alternatives Typical Faulted Cable Prep Typical Test Configuration (Pre-test)

For Information Only 18

Quality and Safety of Proposed Alternatives Cable Fault Testing - Results None of the 20 test cases resulted in cable damage that propagated to a multi-phase fault.

In some of the tests, the adjacent cable was indented slightly at the fault location but no jacket or shield damage occurred.

In one of the five 4 kV cable fault tests, there was damage to one of the adjacent power cables outer jacket and bronze tape shield; however, the internal insulation remained intact and no phase to phase fault occurred.

For Information Only 19

Quality and Safety of Proposed Alternatives Fant Line -13.8 kV Faulted Cable KUG to CT4 / PSW - 13.8 kV Feed Faulted Cable (typical) (typical)

For Information Only 20

Quality and Safety of Proposed Alternatives Feed to Keowee CX XFMR - 4.16 kV Faulted Cable Feed to Keowee CX XFMR- Adjacent 4.16 kV Cable (typical) (Only instance of breached cable jacket in adjacent cable)

For Information Only 21

Quality and Safety of Proposed Alternatives Cable Fault Testing - Results (contd)

In each test case, the bronze tape performed its function of protecting the conductors and not allowing a fault to propagate.

In each test case there was no observable damage to the control cables in the tray section adjacent to the faulted power cables (control cable separation from power cables varied from 5 to no gap spacing between them and the power cables).

Low induced voltage levels observed on control cables was determined to be inconsequential.

Length of cable tested has negligible impact on the results due to cable design and installation.

For Information Only 22

Quality and Safety of Proposed Alternatives Risk Insights A risk analysis was performed to determine the potential risk impact of the current plant configuration with respect to cable separation in the locations of concern.

- Risk is different for each location based on specific cabling in each location.

The analysis considered the following aspects:

- Frequency of cable faults,

- Probability that a fault is a multi-phase or high energy arc fault (HEAF),

- Probability of a large imposed voltage on one or both Oconee vital 125 VDC trains,

- Probability of failure of one or both Oconee vital 125 VDC trains, given an imposed voltage,

- Probability of failure of mitigation strategies.

For Information Only 23

Quality and Safety of Proposed Alternatives Risk Insights (contd)

Analysis Results For Information Only 24

Quality and Safety of Proposed Alternatives Risk Insights (contd)

The analysis shows that the overall core damage frequency (CDF) increase for the five (5) cable locations is approximately 3E-10/year, using conservative values.

- Conservative likelihood of a large imposed voltage on DC control cables was assumed.

- Conservative likelihood of a loss of one or both trains of Oconee vital 125 VDC was assumed.

Risk values are low due to system design and mitigating capabilities.

- Grounding scheme reduces the likelihood of a severe fault.

- Failure of DC control cables (i.e., open circuit) does not impact normal power to Oconee.

- Mitigation strategies are still available in the event of a loss of offsite power and both vital 125 VDC trains.

Standby Shutdown Facility (SSF) is designed for standalone operation (i.e., has its own AC and DC power).

PSW power can be provided to the SSF in the event of failure of dedicated diesel generator (for some locations).

For Information Only 25

Quality and Safety of Proposed Alternatives Risk Insights (contd)

Differences in risk between locations are mostly driven by fault frequency.

- Number of energized AC power cables

- Length of exposed cable The CDF increase for Trench 3 is 2E-10/year.

- Three normally energized AC power cables and significant cable length (approximately 4100 feet)

- PSW power available to SSF The CDF increase for Manholes 1 through 5 is less than 1E-13/year.

- Very limited fault exposure due to normally de-energized power cables and short length of cable

- PSW power available to SSF For Information Only 26

Quality and Safety of Proposed Alternatives Risk Insights (contd)

The CDF increase from Manhole 6 and the PSW cable spreading area is 2E-11/year.

- These locations have relatively short lengths of cable, but contain the normally energized Fant power feed.

- SSF available, but PSW power NOT available to SSF The CDF increase for the Keowee Equipment Gallery is 5E-12/year.

- This location has a relatively short length of cable

- PSW power available to SSF CDF is the bounding metric.

- Oconee has a large, dry, containment, such that LERF is driven by bypass sequences (S/G tube ruptures, ISLOCAs) and isolation failure sequences.

- Loss of AC and/or DC does not create a bypass sequence.

- Most containment isolation valves fail closed on loss of AC/DC power.

- Large Early Release Frequency (LERF) is expected be at least an order of magnitude less than CDF.

For Information Only 27

Quality and Safety of Proposed Alternatives Proposed Alternatives For Information Only 28

Quality and Safety of Proposed Alternatives Keowee Underground Power Path (Trench 3)

Proposed Alternative Until modifications are completed, temporary acceptance pursuant to 10 CFR 50.55a(z)(1) of the existing Trench 3 configuration is requested as an alternative to meeting the requirements of 10 CFR 50.55a(h)(2) to allow for the completion of modifications to relocate the safety related control cable functions outside of Trench 3, thereby eliminating the potential for any adverse effects from a cable fault.

For Information Only 29

Quality and Safety of Proposed Alternatives Keowee Underground Power Path (Trench 3) (contd) 10 CFR 50.55a(z)(1) Acceptable Level of Quality and Safety Robust power cable design and cables procured to QA-1 standards High impedance grounding system limits fault current Satisfactory cable crush test results Satisfactory cable fault test results Station power cables are periodically tested and inspected as described in UFSAR Section 18.3.14, Insulated Cables and Connections Aging Management Program.

Protection from the environment. The cables are enclosed in a steel-reinforced concrete trench engineered to withstand earthquakes, tornado missiles, and to minimize water entry.

Passive drains and inspection ports are provided at trench low points.

Calculated negligible CDF risk increase from a damaging cable fault (2E-10/year)

For Information Only 30

Quality and Safety of Proposed Alternatives PSW Ductbank Manholes 1 through 5 Proposed Alternative Modification of the Oconee licensing basis pursuant to 10 CFR 50.55a(z)(1) & (2) to accept, pursuant to 10 CFR 50.55a(z), the as-is configuration as an alternative configuration to meeting the requirements of 10 CFR 50.55a(h)(2).

For Information Only 31

Quality and Safety of Proposed Alternatives PSW Ductbank Manholes 1 through 5 (contd) 10 CFR 50.55a(z)(1) Acceptable Level of Quality and Safety Satisfactory cable crush test results Satisfactory cable fault test results The potential for power cable to control cable interaction in the manholes represents a significantly small portion of the overall cable run (approximately 150 feet out of 5200 feet).

Cables not normally energized Station power cables are periodically tested and inspected as described in UFSAR Section 18.3.14, Insulated Cables and Connections Aging Management Program.

Protection from the environment - the cables are housed in a steel-reinforced concrete ductbank engineered to withstand earthquakes, tornado missiles, and to minimize water entry.

Robust power cable design and cables procured to QA-1 standards High impedance grounding system limits fault current Calculated negligible CDF risk increase from a damaging cable fault (< 1E-13/year)

For Information Only 32

Quality and Safety of Proposed Alternatives PSW Ductbank Manholes 1 through 5 (contd) 10 CFR 50.55a(z)(2) Hardship without a Compensating Increase in the Level of Quality and Safety There are several rigging and lifting concerns associated with opening the manholes, including concerns for overhead 230 kV and 525 kV power lines, special crane requirements, potential for damage to the manhole cover seal and concrete edges.

Work activities within the confined space of a manhole (e.g., drilling, rebar scanning, expansion anchor installation, ingress and egress of personnel and materials, modification implementation) could damage cables.

Manholes outside the protected area are required to be fenced (Security). Any cranes would need to be moved/disassembled/locked every evening.

PSW system is unavailable during work in manholes.

For Information Only 33

Quality and Safety of Proposed Alternatives PSW Ductbank Manhole 6 (MH-6) & PSW Cable Spreading Area Proposed Alternative Modification of the Oconee licensing basis pursuant to 10 CFR 50.55a(z)(1) to accept a proposed modification to meet the separation requirements for a Limited Hazard Area as noted by IEEE 384-1992, Paragraph 6.1.4 with respect to the normally energized Fant line power supply feeder and adjacent control cables is requested as an alternative configuration to meeting the requirements of 10 CFR 50.55a(h)(2). Oconee will install industry standard designs to address the power and control cable separation concerns.

Modification of the Oconee licensing basis pursuant to 10 CFR 50.55a(z)(1) to accept the as-is configuration of the normally de-energized 13.8 kV power feed from Keowee to the PSW building as an alternative configuration to meeting the requirements of 10 CFR 50.55a(h)(2).

Until modifications are completed, temporary acceptance of the as-is configuration pursuant to 10 CFR 50.55a(z)(1) of the Fant line feeder and adjacent Keowee control cables is requested as an alternative to meeting the requirements of 10 CFR 50.55a(h)(2) until the above proposed modification is complete.

For Information Only 34

Quality and Safety of Proposed Alternatives PSW Ductbank Manhole 6 (MH-6) & PSW Cable Spreading Area (contd) 10 CFR 50.55a(z)(1) Acceptable Level of Quality and Safety Satisfactory cable crush test results Satisfactory cable fault test results Modification of Fant and adjacent control cable raceway to meet enclosed raceway separation requirements for a Limited Hazard Area as noted by IEEE 384-1992, endorsed by NRC RG 1.75 Station power cables are periodically tested and inspected as described in UFSAR Section 18.3.14, Insulated Cables and Connections Aging Management Program.

Protection from the environment - the cables are housed in a steel-reinforced concrete ductbank engineered to withstand earthquakes, tornado missiles, and to minimize water entry.

Robust power cable design and cables procured to QA-1 standards Calculated negligible CDF risk increase from a damaging cable fault (2E-11/year)

For Information Only 35

Quality and Safety of Proposed Alternatives Keowee Mechanical Equipment Gallery Proposed Alternative Modification of the Oconee licensing basis pursuant to 10 CFR 50.55a(z)(1) to accept a proposed modification to meet the separation requirements for a Limited Hazard Area as noted by IEEE 384-1992, paragraph 6.1.4 with respect to the auxiliary power feed to Keowee, the Keowee underground emergency power feeder, the PSW KPF switchgear line side bus power cables and adjacent control cables is requested as an alternative configuration to meeting the requirements of 10 CFR 50.55a(h)(2). Oconee will install industry standard designs to address the power and control cable separation concerns.

Until modifications are completed, temporary acceptance pursuant to 10 CFR 50.55a(z)(1) of the as-is configuration in the Keowee Mechanical Equipment Gallery as an alternative configuration to meeting the requirements of 10 CFR 50.55a(h)(2) until the above proposed modification is complete.

Modification of the Oconee licensing basis pursuant to 10 CFR 50.55a(z)(1) to accept the as-is configuration of the normally de-energized 13.8 kV power feed from Keowee to the PSW building as an alternative configuration to meeting the requirements of 10 CFR 50.55a(h)(2).

For Information Only 36

Quality and Safety of Proposed Alternatives Keowee Mechanical Equipment Gallery (contd) 10 CFR 50.55a(z)(1) Acceptable Level of Quality and Safety Satisfactory cable crush test results Satisfactory cable fault test results Modifications to meet enclosed raceway separation requirements for a Limited Hazard Area as noted by IEEE 384-1992, paragraph 6.1.4 Station power cables are periodically tested and inspected as described in UFSAR Section 18.3.14, Insulated Cables and Connections Aging Management Program.

Robust power cable design and cables procured to QA-1 standards Protective environment, cables are below grade in the Keowee powerhouse not exposed to environmental hazards.

Calculated negligible CDF risk increase from a damaging cable fault (5E-12/year)

For Information Only 3737

Quality and Safety of Proposed Alternatives Summary Oconee is taking action to address the NRCs concerns.

Submittal seeks to clarify the Oconee licensing basis with respect to the cables noted in this presentation.

Submittal seeks NRC approval per 10 CFR 50.55a(z).

Submittal demonstrates an acceptable level of quality and safety for the proposed alternatives based on several factors, including:

- Cable Crush Test Results

- Cable Fault Test Results

- Modifications per Accepted Standards

- Environmental Factors

- Aging Management Program

- Risk Significance For Information Only 38

Closing Remarks Scott Batson Site Vice President For Information Only 39