ROP8 - Change to the Inspection Plan for the Calvert Cliffs Nuclear Power Plant
ML073470724
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 12/13/2007
From: Dentel G T
Reactor Projects Branch 1
To: Spina J A
Calvert Cliffs
Dentel, G RGN-I/DRP/BR1/610-337-5233
References
Download: ML073470724 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406 December 13, 2007 Mr. James A. Spina, Vice President Calvert Cliffs Nuclear Power Plant, Inc.

1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702

SUBJECT:

CHANGE TO THE INSPECTION PLAN FOR THE CALVERT CLIFFS NUCLEAR POWER PLANT

Dear Mr. Spina:

As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed the inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.

The enclosed inspection plan details the inspections (less those related to physical protection) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspector(s) arrival onsite. Routine resident inspections are not listed due to their continuous nature.

In accordance with 10 CFR 2.390 of the NRC's "Rules and Practices" a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).

J. Spina 2 Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/ Mr. Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects

Docket Nos. 50-317, 50-318 License No. DPR-53, DPR-69

Enclosures:

Calvert Cliffs Nuclear Power Plant Inspection/Activity Plans

cc w/encl:

M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer

President, Calvert County Board of Commissioners

C. W. Fleming, Esq., Senior Counsel, Nuclear Generation Group J. Gaines, Director, Licensing Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel R. Hickok, NRC Technical Training Center

S. Patterson, SLO (2)

J. Spina 2 Please contact me at 610-337-5233 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/ Mr. Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects, Region I

Docket Nos. 50-317, 50-318 License No. DPR-53, DPR-69

Enclosures:

Calvert Cliffs Nuclear Power Plant Inspection/Activity Plans

cc w/encl:

M. J. Wallace, President, Constellation Generation J. M. Heffley, Senior Vice President and Chief Nuclear Officer

President, Calvert County Board of Commissioners

C. W. Fleming, Esq., Senior Counsel, Nuclear Generation Group J. Gaines, Director, Licensing

Director, Nuclear Regulatory Matters R. McLean, Manager, Nuclear Programs K. Burger, Esquire, Maryland People's Counsel R. Hickok, NRC Technical Training Center

S. Patterson, SLO (2)

Distribution: see next page

SUNSI Review Complete: BAB4 (Reviewer

=s Initials)

DOCUMENT NAME: T:\DRP\BRANCH1\ROP 8 Letters\Rop8 Letter - CC.doc After declaring this document AAn Official Agency Record

@ it will be released to the Public. To receive a copy of this document, indicate in the box:

" C" = Copy without attachment/enclosure " E" = Copy with attachment/enclosure " N" = No copy OFFICE RI/DRP RI/DRP NAME BBickett/BAB4 GDentel/GTD

DATE 12/06/07 12/06/07 OFFICIAL RECORD COPY J. Spina 3 Distribution w/encl: S. Collins, RA M. Dapas, DRA

G. West, RI OEDO (Acting)

J. Lubinski, NRR

D. Pickett, PM, NRR M. David, PM, NRR G. Dentel, DRP B. Bickett, DRP S. Kennedy, DRP, SRI M. Davis, DRP, RI C. Newgent, DRP, Resident OA Region I Docket Room (with concurrences)

J. Trapp, DRS J. Rogge, DRS M. Sykes, DRS J. White, DRS L. Doerflein, DRS

R. Conte, DRS L. Scholl, DRS P. Frechette, DRS D. Silk, DRS D. Screnci, PAO

N. Sheehan, PAO

R. Barkley, ORA D. Holody, ORA J. Thompson, NRR (JWT1@nrc.gov)

Calvert Cliffs Inspection / Activity Plan 01/01/2008

-12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 12/11/2007 14:25:40 Report 22 4 5/19 EXM-INITIAL OPERATOR LICENSING EXAMS Not Applicable 05/19/2008 05/23/2008 1 U01633 CALVERT CLIFFS UNIT 1 & 2 INITIAL EXAM (FY08)

Not Applicable 06/16/2008 06/20/2008 1 U01633 CALVERT CLIFFS UNIT 1 & 2 INITIAL EXAM (FY08) 1 7111108P-U1 INSERVICE INSPECTION Baseline Inspections 02/18/2008 02/22/2008 1 7111108P IP Inservice Inspection Activities - PWR Baseline Inspections 02/25/2008 02/29/2008 1 7111108P IP Inservice Inspection Activities - PWR 1 71121-OCC RAD SAFETY Baseline Inspections 02/25/2008 02/29/2008 1, 2 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 02/25/2008 02/29/2008 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 02/25/2008 02/29/2008 1, 2 71151 IP Performance Indicator Verification 1 TI-166-CONTAINMENT SUMP MODIFICATION INSPECTION Safety Issues 03/03/2008 03/09/2008 1 2515/166 IP Pressurized Water Reactor Containment Sump Blockage [NRC GENERIC LETTER 2004-02

]1 7112103-OCC RAD SAFETY - INSTRUMENTS Baseline Inspections 03/17/2008 03/21/2008 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 03/17/2008 03/21/2008 1, 2 71151 IP Performance Indicator Verification 1 ISFSI-ISFSI - ANNUAL SAMPLE Other Routine 04/01/2008 06/30/2008 1 60855 IP Operation Of An ISFSI 1 71121-OCC RAD SAFETY Baseline Inspections 05/19/2008 05/23/2008 1, 2 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 05/19/2008 05/23/2008 1, 2 7112102 IP A LARA Planning and Controls Baseline Inspections 05/19/2008 05/23/2008 1, 2 71151 IP Performance Indicator Verification 10 7111121-CDBI Baseline Inspections 06/02/2008 06/06/2008 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 06/16/2008 06/20/2008 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 06/23/2008 06/27/2008 1, 2 7111121 IP Component Design Bases Inspection 1 7112201-PUB RAD SAFETY - RETS Baseline Inspections 06/16/2008 06/20/2008 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 06/16/2008 06/20/2008 1, 2 71151 IP Performance Indicator Verification 1 71121-OCC RAD SAFETY Baseline Inspections 08/25/2008 08/29/2008 1, 2 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 08/25/2008 08/29/2008 1, 2 7112102 IP A LARA Planning and Controls Baseline Inspections 08/25/2008 08/29/2008 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 08/25/2008 08/29/2008 1, 2 71151 IP Performance Indicator Verification 1 71121-OCC RAD SAFETY Baseline Inspections 11/03/2008 11/07/2008 1, 2 7112101 IP A ccess Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Calvert Cliffs Inspection / Activity Plan 01/01/2008

-12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 12/11/2007 14:25:40 Report 22 1 71121-OCC RAD SAFETY Baseline Inspections 11/03/2008 11/07/2008 1, 2 7112102 IP A LARA Planning and Controls Baseline Inspections 11/03/2008 11/07/2008 1, 2 71151 IP Performance Indicator Verification 2 EP-EP PROGRAM INSP EP Baseline Inspecti o 11/17/2008 11/21/2008 1, 2 7111402 IP A lert and Notification System Testing EP Baseline Inspecti o 11/17/2008 11/21/2008 1, 2 7111403 IP Emergency Response Organization Augmentation Testing EP Baseline Inspecti o 11/17/2008 11/21/2008 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes EP Baseline Inspecti o 11/17/2008 11/21/2008 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 11/17/2008 11/21/2008 1, 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 11/17/2008 11/21/2008 1, 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 11/17/2008 11/21/2008 1, 2 71151-EP03 IP A lert & Notification System This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.