|
---|
Category:Annual Operating Report
MONTHYEARML23083B3402023-03-24024 March 2023 GEH Annual Shutdown Reactor Reports for the Year 2022 ML22089A2232022-03-25025 March 2022 GEH Annual Shutdown Reactor Reports for the Year 2021 ML20086K7692020-03-25025 March 2020 GEH Annual Shutdown Rector Reports for the Year 2019 ML20091H5822020-03-25025 March 2020 GE-Hitachi Nuclear Energy Americas, LLC - Transmittal of Annual Shutdown Reactor Reports for the Year 2019 M200045, GE-Hitachi Nuclear Energy Americas, LLC - Transmittal of Annual Shutdown Reactor Reports for the Year 20192020-03-25025 March 2020 GE-Hitachi Nuclear Energy Americas, LLC - Transmittal of Annual Shutdown Reactor Reports for the Year 2019 M190066, GE-Hitachi Nuclear Energy Americas, LLC - Annual Shutdown Reactor Reports for the Year 20182019-03-27027 March 2019 GE-Hitachi Nuclear Energy Americas, LLC - Annual Shutdown Reactor Reports for the Year 2018 M180070, GEH Annual Shutdown Reactor Reports for the Year 20172018-03-29029 March 2018 GEH Annual Shutdown Reactor Reports for the Year 2017 M170076, GE-Hitachi Nuclear Energy Americas, LLC - Annual Shutdown Reactor Reports for 20172017-03-23023 March 2017 GE-Hitachi Nuclear Energy Americas, LLC - Annual Shutdown Reactor Reports for 2017 ML16300A1202016-10-26026 October 2016 GEH Annual Shutdown Reactor Report for 2016 - Getr Revision 1 ML16082A4512016-03-22022 March 2016 GE-Hitachi Nuclear Energy - Annual Shutdown Reactor Reports for 2015 ML15092A2722015-03-31031 March 2015 Boiling Water (Deactivated), Annual Report No. 50, Esada-Vallecitos Experimental Superheat Reactor (Deactivated), Annual Report No. 47 and General Electric Test Reactor(Deactivated), Annual Report No. 56 for the Year 2014 ML13088A1662013-03-25025 March 2013 GE Hitachi Nuclear Energy - Annual Report for Getr, 2012 ML12111A2632012-03-30030 March 2012 GE Hitachi Nuclear Energy - Annual Report No. 44 for the Deactivated ESADA-Vallecitos Experimental Superheat Reactor ML12111A2642012-03-30030 March 2012 GE Hitachi Nuclear Energy, Submittal of Annual Report No. 53 for the Year 2011 ML1109400352011-03-31031 March 2011 2010 Annual Report No. 43 for the Deactivated ESADA Experimental Superheat Reactor ML1109400362011-03-30030 March 2011 Submittal of 2010 Annual Report No. 52 for the Deactivated GETR-2010 ML1009103292010-03-30030 March 2010 Submittal of Annual Report No. 51 for Deactivated General Electric Test Reactor for 2009 ML1009004662010-03-30030 March 2010 Annual Report for ESADA-Vallecitos Experimental Superheat Reactor for the Year 2009 ML0809201292008-03-28028 March 2008 GE-Hitachi Nuclear Energy - Annual Report No. 40 for EVESR, 2007 ML0608602132006-03-23023 March 2006 Annual Report for ESADA-Vallecitos Experimental Superheat Reactor (EVESR) for 2005 ML0409702742004-03-30030 March 2004 Transmittal of Annual Report No. 45 for the Deactivated General Electric Test Reactor 2023-03-24
[Table view] Category:Letter
MONTHYEARIR 05000018/20240022024-10-29029 October 2024 GE Hitachi Nuclear Energy - NRC Inspection Report 05000018/2024-002, 05000070/2024002, 05000183/2024002, and 050-00073/2024002 ML24299A0682024-10-25025 October 2024 GEH Notification of GE Company Stock Beneficial Ownership Filing ML24284A1182024-10-10010 October 2024 GEH - Notification of GE Company Stock Beneficial Ownership Filing ML24271A1572024-09-27027 September 2024 Notification of Planned Closing, Trust Fund Balance at Transfer and Proof of Insurance ML24270A2242024-09-26026 September 2024 License Amendment Request - Historic and Cultural Resources Review Vallecitos Boiling Water Reactor and General Electric Test Reactor ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24165A2812024-06-13013 June 2024 Northstar Vallecitos, LLC, Documentary Evidence of Insurance Vallecitos Nuclear Center ML24157A0882024-06-0505 June 2024 GE-Hitachi Nuclear Energy Americas, LLC, Vallecitos Nuclear Center (Vnc) Organization Change ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000018/20240012024-05-29029 May 2024 GE Hitachi Nuclear Energy - NRC Inspection Report 05000018/2024-001, 050 00070/2024-001, 050-00183/2024-001, and 050-00073/2024-001 ML24039A0192024-04-25025 April 2024 Order Approving Transfer of the Vallecitos Nuclear Center Licenses and Conforming License Amendments ML24088A2392024-03-28028 March 2024 GE-Hitachi Nuclear Energy Americas, LLC, NRC Notice Before Actions Necessary to Accomplish the Indirect Transfers of Control Are Completed - Step Two ML24051A1802024-02-22022 February 2024 Boiling Water Reactor License Termination Plan Request for Additional Information - Letter ML24032A1082024-02-0101 February 2024 GEH Notification of GE Company Stock Beneficial Ownership Filing ML24022A3232024-01-22022 January 2024 Geha/Northstar Response to NRC Request for Additional Information Regarding Direct Transfer of Vnc Licenses IR 05000018/20230022024-01-0909 January 2024 GE Hitachi Nuclear Energy - NRC Inspection Report 05000018/2023002, 05000070/2023002, and 05000183/2023002 ML23345A1222023-12-21021 December 2023 Request for Additional Information Regarding the Direct Transfer of Control of Vallecitos Nuclear Center Licenses and Conforming License Amendments ML23345A0812023-12-11011 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A1312023-12-0404 December 2023 GE-Hitachi Nuclear Energy Americas, LLC, Additional Information to Geha and GNF-A Application for Order Consenting to Indirect Transfer of Control (Reference 1) ML23334A2222023-11-30030 November 2023 GE Hitachi Nuclear Energy - NRC Notice Before Actions Necessary to Accomplish the Indirect Transfers of Control Are Completed ML23283A3292023-11-30030 November 2023 NRC Issuance of Order Consenting to Indirect Transfer of Control of Ge/Geha/Gnfa Licenses ML23279A1322023-11-13013 November 2023 GE Hitachi Nuclear Energy - Vallecitos Nuclear Center, Getr Decommissioning Plan – (License Number TR-1, Docket Number 50-70) ML23310A1132023-11-0909 November 2023 FRN-Notice of Consideration of Approval of Direct Transfer of Control of Vallecitos Nuclear Center Licenses Conforming License Amendments Opportunity for a Hearing Transmittal Letter ML23305A0522023-11-0101 November 2023 GE Hitachi Nuclear Energy Additional Supplemental Information - Revised Exhibit H ML23275A1742023-10-26026 October 2023 Acceptance Review of Application for Consent to Direct Transfer of Control of Vallecitos Nuclear Center Licenses and Conforming License Amendments ML23292A3362023-10-19019 October 2023 Northstar Vallecitos, LLC, Supplemental Information - Financial Qualifications ML23276B3952023-10-13013 October 2023 The U.S. Nuclear Regulatory Commission Staff Assessment of Ge/Geha/Gnfa Reponses to Acceptance Observations Application for the U.S. Nuclear Regulatory Commission Consent to Indirect Transfer of Licenses ML23269A1062023-09-26026 September 2023 GEH Description of Process for Decommissioning the Vallecitos Nuclear Center (Vnc) Shutdown Reactors - Getr Decommissioning Plan ML23261A5922023-09-15015 September 2023 GE-Hitachi Nuclear Energy Americas, LLC, License Termination Plan for the Vallecitos Boiling Water Reactor License DPR-1 ML23257A2492023-09-14014 September 2023 Cultural Resources Report ML23248A2322023-09-0505 September 2023 GE Hitachi Nuclear Energy - Supplemental Information - Proposed Conforming Amendments & License Conditions ML23244A2472023-09-0101 September 2023 GE-Hitachi Nuclear Energy Americas, LLC and Northstar Vallecitos, LLC, Application for Consent to Direct Transfers of Control of Licenses and Related Conforming License Amendments ML23229A5122023-08-17017 August 2023 GE-Hitachi Nuclear Energy Americas, LLC, Response to NRC Staff Observations Enclosed with NRC Acceptance Letter (Reference 2) Related to GE, Geha and GNF-A Application (Reference 1) ML23191A8592023-07-27027 July 2023 Acceptance Letter GE GNFA and Geha Application for NRC Consent to Indirect Transfer of Licenses ML23150A0962023-05-30030 May 2023 GE Hitachi Nuclear Energy, Nuclear Center (Vnc) Organization Change ML23152A1162023-05-30030 May 2023 Application for Order Consenting to Indirect Transfer of Control with Respect to Reactor Licenses, Materials Licenses, and Export Licenses, and Notification Regarding Other Approvals IR 05000018/20230012023-05-0505 May 2023 GE Hitachi Nuclear Energy - NRC Inspection Report 05000018/2023001, 05000070/2023001, and 05000183/2023001 ML23123A0752023-04-12012 April 2023 Response to NRC Request for Inspection Documents ML23104A4172023-03-31031 March 2023 GNF-AGEH Financial Assurance of Decommissioning Funds - Surety Bond Riders Cover Letter and Affidavit ML23090A1802023-03-31031 March 2023 GEH - Financial Assurance Status Reports ML23083B3402023-03-24024 March 2023 GEH Annual Shutdown Reactor Reports for the Year 2022 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23054A3332023-02-23023 February 2023 GEH Notification of GE Company Stock Beneficial Ownership Filing ML23018A2832023-01-19019 January 2023 GE-Hitachi Nuclear Energy Americas, LLC Response to NRC Inspection Report 050-00018/2022-002; 050-00070/2022-002; 050-00183/2022-002 and Notice of Violation ML22339A1742022-12-13013 December 2022 GE Hitachi Nuclear Energy NRC Inspection Report 05000018/2022002 05000070/2022002 and 05000183/2022002 IR 05000018/20220022022-12-13013 December 2022 GE Hitachi Nuclear Energy NRC Inspection Report 05000018/2022002 05000070/2022002 and 05000183/2022002 ML22335A5262022-12-0101 December 2022 (Vnc) Organization Change ML22326A3522022-11-22022 November 2022 Limited Post Shutdown Decommissioning Activities Report Update ML22300A2102022-10-27027 October 2022 GE-Hitachi Nuclear Energy Americas, LLC, Nuclear Center (Vnc) Submittal of Radiological Emergency Plan (REP) Revision 2 ML22265A0442022-09-26026 September 2022 GE Hitachi Vallecitos Nuclear Center, U.S. Nuclear Regulatory Commissions Analysis of GE Hitachis Decommissioning Funding Status Reports for the Shutdown Power Reactors Vallecitos Boiling Water Reactor (License No. DPR-1, Docket No. 50-18) 2024-09-27
[Table view] |
Text
0. IHITACHI GE Hitachi Nuclear Energy David W. Turner Manager, Vallecitos Nuclear. Center 6705 Vallecitos Rd Sunol, CA 94586 USA U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Attn: Document Control Desk T 925 862 4344 F 910 341 2577 davidw.turner@ge.com March 30th, 2010
Subject:
Reference:
Enclosure:
Annual Report for EVESR, 2009 License DR-10, Docket 50-183 Annual Report No. 42 Enclosed is the Annual Report No. 42 for the deactivated ESADA-Vallecitos Experimental Superheat Reactor (EVESR) located at Vallecitos Nuclear Center near Sunol, California.
If there are any questions or additional information required, please contact me at the number above.Sincerely Yours, Digitally sig ned by O~-David W I Turne Date: 20'10.03132:5-70.a 13:21:15 -a7aa' -David W. Turner Manager, Vallecitos Nuclear Center cc: John Buckley, NRC (by e-mail)Robert Evans, Region IV (by e-mail)GE-Hitochi Nuclear Energy Americas, LLC SHITACHI GE Hitachi Nuclear Energy Vollecitos Nudeor Center Sunol& Celifornio ESADA-VALLECITOS EXPERIMENTAL SUPERHEAT REACTOR (DEACTIVATED)
ANNUAL REPORT NO. 42 FOR THE YEAR 2009 LICENSE DR-10 DOCKET 50-183 MARCH 2010 EVESR Annual Report No. 42 ESADA-Vallecitos Experimental Superheat Reactor (Deactivated)
ANNUAL REPORT NO. 42 General Electric Company has maintained the ESADA Vallecitos Experimental Superheat Reactor (EVESR) in a deactivated status under the authority of Amendment No. 3 to License DR-IO, Docket 50-183, issued June 11, 1976. In this annual report, a summary of the status of the facility for the period of January 1, 2009 to December 31, 2009 is presented, as required by paragraph 3.E.2. of the license.1.0
SUMMARY
Component removal activities began in 2008 above the 549 foot level. Tech Spec changes issues in Amendment 7 December 1, 2008 authorize the removal of systems beside the reactor vessel and bio-shield below the 549 level. Component removal continued in 2009 will continue in 2010. Entry into the containment building was made for routine radiation surveys and a general examination of conditions throughout the building.
In accordance with written procedures, the Facility Manager controls access to the containment building.Radiation levels remain essentially unchanged.
Contamination levels are up slightly, reflecting the ongoing equipment-removal activities.
2.0 STATUS
OF FACILITY The facility continues to be in deactivated status. The plugs to the reactor vessel and head storage shield, the wooden cover over the fuel storage pool remain in place.3.0 RADIATION AND CONTAMINATION Complete radiation and contamination surveys of the facility indicate that levels remain low. Results of the surveys are presented in Table 1. The radiation/contamination levels listed are representative but not necessarily maximum values.4.0 ACTIVITIES Routine inspections were conducted during this report period. Component removal and downsizing was continued.
4.234 mCi of material in 2354 ft 3 were removed and disposed in at the facility in Clive, Page 2 of 3 EVESR Annual Report No. 42 Table 1 Radiation and Contamination Level Data ESADA-Vallecitos Experimental Superheat Reactor (Deactivated)
Contamination Levels Surface Smears Airborne Radiation Beta-Gamma Beta-Gamma' Levels (dpm/ft 2) (PLCi/cc x 10-10)(mR/h Gamma)Date of Measurement:
12/08 12/09 12/08 12/09 12/08 12/09 Reactor Enclosure Top of spent fuel pool <1 <1 500 15,000 (main floor)549-ft level (main floor) <1 <1 500 10,000 0.03 23.9 534-ft level <1.5 <1 5,000 20,000 519-ft level <1 <1 20,000 10,000 0.03 11.9 503-ft level (maximum <1 <1 2,500 10,000 pipe reading)487-ft level (basement)
<1 <1 750 2,500 0.01 9.15 Note: Radiation levels, surface smears, and air samples may vary from survey to survey as they are taken in general areas rather than at specific locations.
24-hour decayed values Page 4 of 3