GE Hitachi Nuclear Energy - Annual Report for Getr, 2012
ML13088A166
Person / Time
Site: Vallecitos File:GEH Hitachi icon.png
Issue date: 03/25/2013
From: Mcfadden A
GE-Hitachi Nuclear Energy Americas
To:
Document Control Desk, NRC/FSME
References
AEM 13-03
Download: ML13088A166 (6)


Text

GE Hitachi Nuclear Energy 0HITACHI Anthony McFadden Site Manager GEH Vallecitos Nuclear Center 6705 Vallecitos Rd Sunol, CA 94586 Ser: AEM 13-03 ' -'J°'°*

anthony.mcfadden @ge.com March 25, 2013 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001

Subject:

Annual Report for GETR, 2012

Reference:

License TR-1, Docket 50-70

Enclosure:

Annual Report No. 54 Enclosed is the Annual Report No. 54 for the deactivated General Electric Test Reactor (GETR),

located at Vallecitos Nuclear Center near Sunol, California.

If there are any questions, or additional information required, please contact me at the number above.

Sincerely, ho Faden Manager, Vallecitos Nuclear Center Cc: John Buckley, NRC (by e-mail)

Robert Evans, NRC Region IV (by e-mail)

~3/V'CZ~o

0 HITACHI GE Hitachi Nuclear Energy Vallecitos Nuclear Center Sunol, California GENERAL ELECTRIC TEST REACTOR (DEACTIVATED)

ANNUAL REPORT NO. 54 FOR THE YEAR 2012 LICENSE TR-1 DOCKET 50-70 MARCH 2013

GETR Annual Report No. 54 General Electric Test Reactor (Deactivated)

ANNUAL REPORT NO. 54 GE Hitachi (GEH) has maintained the General Electric Test Reactor (GETR) in a deactivated status under the authority of Amendment No. 17 to License TR-1, Docket 50-70, issued October 22, 2007. In this annual report, a summary of the status of the facility for the period of January 1, 2012 to December 31, 2012 is presented.

1.0

SUMMARY

The facility remains in essentially the same condition described in Annual Report No. 53. Entry into the reactor building was made for routine radiation surveys and a general examination of conditions throughout the building. The crane, elevator, and ventilation were serviced and tested in 2011 in anticipation of beginning remediation activities. Such activities have not begun.

Radiation and contamination levels remain at acceptable levels.

2.0 STATUS OF FACILITY In accordance with written procedures, the Facility Manager controls access to the containment building and general systems. The facility continues to be in deactivated status. There were no changes authorized by the Facility Manager pursuant to 10CFR50.59(a) in 2012.

3.0 RADIATION AND CONTAMINATION Complete radiation and contamination surveys of the facility indicate that levels remain low. Results of the surveys are presented in Table 1. The radiation/contamination levels listed are representative but not necessarily maximum values.

The data below are from sample and dosimeter results accumulated during 2012.

These data are for the entire VNC site and include the effects of operations other than GETR.

Page 1 of 4

GETR Annual Report No. 54 3.1 GETR Stack Although maintenance was performed on the stack in 2011, and the stack was tested, there has been no remediation effort performed for the GETR reactor. The ventilation system is not yet fully operational, and the stack air flow has not been calibrated. Thus no concentration data is available for 2012.

3.2 Air Monitors (Yearly average of all meteorological stations.)

Four environmental air-monitoring stations are positioned approximately 90 degrees apart around the operating facilities of the site. Each station is equipped with a membrane filter that is changed weekly and analyzed for gross alpha and gross beta-gamma.

Alpha Concentration:

Weekly Maximum, 9.21x 10-14 pCi/cc Weekly Average, 2.09 x 10-14 [ICi/cc Beta Concentration:

Weekly Maximum, 4.10 x 10-14 tCi/cc Weekly Average, 7.78 x 10-15 pCi/cc 3.3 Gamma Radiation The yearly dose results for the year 2012 as determined from evaluation of site perimeter environmental monitoring dosimeters showed no departure from normal stable backgrounds.

3.4 Vegetation No alpha, beta or gamma activity attributable to activities at the GETR facility was found on or in vegetation in the vicinity of the site.

3.5 Off-Site Samples taken off the site indicate normal background for the area.

4.0 ACTIVITIES Routine inspections were conducted during this report period. There were no Page 2 of 4

GETR Annual Report No. 54 preventive or corrective maintenance activities performed having safety significance during the reporting period.

5.0 ORGANIZATION The organizational structure changed during 2012. The Site Manager remains A. E.

McFadden. The VBWR Facility Manager remains M.R. Schrag. The Manager, Regulatory Compliance and EHS is now E.F. Saito.

6.0 CONCLUSION

GE Hitachi Nuclear Energy concludes that the deactivated GETR is being maintained in a safe shutdown condition. The inspections, access control, and administratively controlled activities ensure maximum protection for the public health and safety. The procedures will be continued to maintain this high level of protection.

GE Hitachi Nuclear Energy Vallecitos Operations A. E. McFadden Manager Vallecitos Nuclear Center Page 3 of 4

GETR Annual Report No. 54 Table 1 Radiation and Contamination Level Data General Electric Test Reactor (Deactivated)

Contamination Levels Surface Smears Airborne Radiation Levels Beta-Gamma Beta-Gamma' (mR/h beta- (dpm/ft2)* (41Ci/ccx 10-10) gamma) (decayed)

Report Year 2011 2012 2011 2012 2011 2012 Reactor Enclosure Canal 2 1.5 2,000 4000 3rd Floor Zone 1.4 1.5 357 7500 3rd Floor Clean Area <1 <1 250 150 Top of Missile Shield (Point A) <1 <1 9 150 0.02 0.12 2nd Floor 9 60 250 <50 2nd Floor Clean Area 1 1 250 <50 1st Floor Zone 2 2 750 95,000 1is Floor Clean Area 1 <1 83 100 Basement, Rod Work Area 25 60 200 250 0.006 0.25 Basement Clean Area 1 1 250 125 Note:

  • Radiation levels, surface smears, and air samples may vary from survey to survey as they are taken in general areas rather than at specific locations.

Survey Dates:

2011 - 12/17/2011 2012- 12/19/2012 1 24-hour decayed values Page 4 of 4