ML110940036

From kanterella
Jump to navigation Jump to search
Submittal of 2010 Annual Report No. 52 for the Deactivated GETR-2010
ML110940036
Person / Time
Site: Vallecitos File:GEH Hitachi icon.png
Issue date: 03/30/2011
From: Doreen Turner
GE-Hitachi Nuclear Energy Americas
To:
Document Control Desk, NRC/FSME
References
DWT-2011-04
Download: ML110940036 (7)


Text

Page 1 of 1 0

HITACHI GE Hitachi Nuclear Energy David W. Turner Manager, Vallecitos Nuclear Center DWT-2011-04 March 30, 2011 6705 Vallecitos Road Sunol, CA 94586-952 4 USA T +1 925 862 4344 F +1 910 341 2577 M +1 925 200 5060 davidw.turner@ge.com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001

Subject:

Reference:

Enclosure:

Annual Report for GETR, 2010 License TR-1, Docket 50-70 Annual Report No. 52 Enclosed is the Annual Report No. 52 for the deactivated General Electric Test Reactor (GETR) located at Vallecitos Nuclear Center near Sunol, California.

If there are any questions or additional information required, please contact me at the number above.

Sincerely Yours, Digitally signed by

(

David W. Turner Date: 2011.03.31 14:27:05 -07'001 David W. Turner Manager, Vallecitos Nuclear Center cc:

John Buckley, NRC (by e-mail)

Robert Evans, Region IV (by e-mail)

-I-_-

GE Hitachi Nuclear Energy

THIS PAGE INTENTIONALLY LEFT BLANK

0 HITACHI GE Hitachi Nuclear Energy Vallecitos Nuclear Center Sunol, California GENERAL ELECTRIC TEST REACTOR (DEACTIVATED)

ANNUAL REPORT NO. 52 FOR THE YEAR 2010 LICENSE TR-1 DOCKET 50-70 MARCH 2011

GETR Annual Report No. 52 General Electric Test Reactor (Deactivated)

ANNUAL REPORT NO. 52 GE Hitachi (GEH) has maintained the General Electric Test Reactor (GETR) in a deactivated status under the authority of Amendment No. 17 to License TR-1, Docket 50-70, issued October 22, 2007. In this annual report, a summary of the status of the facility for the period of January 1, 2010 to December 31, 2010 is presented.

1.0

SUMMARY

The facility remains in essentially the same condition described in Annual Report No. 51. Entry into the reactor building was made for routine radiation surveys and a general examination of conditions throughout the building.

Radiation levels remain essentially unchanged.

2.0 STATUS OF FACILITY In accordance with written procedures, the Facility Manager controls access to the containment building and general systems. The facility continues to be in deactivated status. There were no changes authorized by the Facility Manager pursuant to 10CFRSO.59(a) in 2010.

3.0 RADIATION AND CONTAMINATION Complete radiation and contamination surveys of the facility indicate that levels remain low. Results of the surveys are presented in Table 1. The radiation/contamination levels listed are representative but not necessarily maximum values.

The data below are from sample and dosimeter results accumulated during 2010.

These data are for the entire VNC site and include the effects of operations other than GETR.

3.1 GETR Stack Not operated.

3.2 Air Monitors (Yearly average of all meteorological stations.)

Four environmental air-monitoring stations are positioned approximately 90 degrees Page 1 of 4

GETR Annual Report No. 52 apart around the operating facilities of the site. Each station is equipped with a membrane filter that is changed weekly and analyzed for gross alpha and gross beta-gamma.

Alpha Concentration:

Weekly Maximum, Weekly Average, Beta Concentration:

Weekly Maximum, Weekly Average, 7.81 x 10-14 3.26 x 10-1L 1.30 x 10-14 6.60 x 10-15 pICi/cc

ýICi/cc pýci/cc ACi/cc 3.3 Gamma Radiation The yearly dose results for the year 2010 as determined from evaluation of site perimeter environmental monitoring dosimeters showed no departure from normal stable backgrounds.

3.4 Vegetation No alpha, beta or gamma activity attributable to activities at the GETR facility was found on or in vegetation in the vicinity of the site.

3.5 Off-Site Samples taken off the site indicate normal background for the area.

4.0 ACTIVITIES Routine inspections were conducted during this report period. There were no preventive or corrective maintenance activities performed having safety significance during the reporting period.

5.0 ORGANIZATION The management and operations organization for the GETR did not change in 2010.

The VNC Site Manager for 2010 was D. W. Turner. The GETR Facility Manager during 2010 was M. R. Schrag. The Regulatory Compliance and EHS Manager was D. R.

Krause.

Page 2 of 4

\\

GETR Annual Report No. 52

6.0 CONCLUSION

GE Hitachi Nuclear Energy concludes that the deactivated GETR is being maintained in a safe shutdown condition. The inspections, access control, and administratively controlled activities ensure maximum protection for the public health and safety. The procedures will be continued to maintain this high level of protection.

GE Hitachi Nuclear Energy Vallecitos Operations Digitally signed by David W.

Turner Date: 2011.03.31 14:26:48 -07'00' nl MA/ T,,rr Maa. Ve.

VaUl NcaCt Manager Vallecitos Nuclear Center Page 3 of 4

V GETR Annual Report No. 52 Table 1 Radiation and Contamination Level Data General Electric Test Reactor (Deactivatedl Contamination Levels Surface Smears Airborne Radiation Levels Beta-Gamma Beta-Gamma' (mR/h Gamma)

(dpm/ft2)

(pCi/cc x 10-12)

Report Year 2009 2010 2009 2010 2009 2010 Reactor Enclosure Canal

<1 1.8 NA NA 3Yd Floor Zone 3

2

<100 1000 3rd Floor Clean Area NA NA

<100

<100 Top of Missile Shield (Point A) 2 0.2 NA NA 4.84 1.13 2nd Floor 10 8

NA NA 2nd Floor Clean Area NA NA

<100 100 1st Floor Zone 3

3

<100 250 1st Floor Clean Area NA NA

<100 150 Basement, Rod Work Area 10 30 600 3750 1.19 0.67 Basement Clean Area

<100 200 Note:

Radiation levels, surface smears, and air samples may vary from survey to survey as they are taken in general areas rather than at specific locations.

Survey Dates:

2009 - 01/12/2010 2010 - 12/09/2010 1 24-hour decayed values Page 4 of 4