HITACHI M230047 March 31, 2023 U.S. Nuclear-'H_egulatory Commission Attn: Document Control Desk Washington, p. C. 20555-001
Subject:
G-EH Financial.Assurance Status.Reports GE Hifachi Nuclear Energy Scott P. Murray Man0:ger,.Faclllty Licensing 3901 Castle Hayne Road P.O. Box.780 -
Wilmington, NC 28402
- USA T (910) 819-5950 scott.mu~y@ge.com
References:
1} NRC License _DPR-1, Vallecitos Boiling Water Reactor (VBWR}, Doc~e_f50-18
- 2) NRC License DR-10, ESADA Vallecitos Experimental Superheat Reactor*
(EVESR}, Docket 5Q-183
- 3) Letter, _S.P. Murray (GEH} to USNRC "GEH Financial Assurance Status Reports", 3/30/22 (ML22089A084}
Pursuant to 1 0 CFR 50.82(a}(8}(v} attached are GE Hitachi Energy, LLC (GEH} financial assurance status reports for the shutdown VBWR and EVESR facilities (References 1 and 2).
These reports provide an annual update to the reports submitted on March 30, 2022 "(Reference 3).
Please contact me if you. have any questi~ns or would like !o discuss this matt~r.furthe~. _
Sincerely, sl~.Eaei Facility Licensing*-
Attachment:
Decommissioning_fi11ancial Assurance Status Reports for VBWR and EVESR cc:
Shutdown Reactor Facilities J. D. Parrott, NRC/DUWP/RDB S. Anderson, NRC RIV SPM 23-012
USNRC M230047 3/31/23
-P-age 2-of 2 Attachment Decommissioning Financial Assurance Status Re(?orts for VBWR and EVESR Shutdown Reactor Facilities Vallecitos Boiling Water Reactor <VaWR) NRC License DPR-1 GEH spent approximately $2.2 million onYBWR decommissioning worK in.2022 that included planning,-preparatio'n, and dismantlement activities. As of year-end 2022, tlie-VBW~faoility-- -- -
estimate of the costs to complete decommissioning is approximately $14.6 million. The VBWR financial-surety bond was updated using a bond.Jider effective March 28,.2023. A duplicate origina!_of the bond rider was sent to NRC on Ma_rch 31, 2023: There were 9 changes tqJb~
GEH mast~r standby trust agreement.
Experimental Superheat Reactor {EVESR) NRG* License DR-1 0 GEH spent approximately $0.7 million on EVESR decommissioning work in 2022 that included planning and preparation activities. As of year-end 2022, the EVESR facility estimate of the
- ~
costs to complete decommissioning is approximately $16.3 million. The EVESR financial surety bond was updated using a bond rider effective March 28, 2023. A duplicate original of the bond rider was sent to NRC on March 31, 2023. There were no changes to the GEH master standby
- trust agreement.