GE-Hitachi Nuclear Energy Americas, LLC, Nuclear Center (Vnc) Submittal of Radiological Emergency Plan (REP) Revision 2
ML22300A210
Person / Time
Site: Vallecitos Nuclear Center, Vallecitos
Issue date: 10/27/2022
From: Smyly J
GE-Hitachi Nuclear Energy Americas
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML22300A209 List:
References
M2200143
Download: ML22300A210 (1)


Text

GEHitachiNuclearEnergy

JeffreySmyly

Regulatory Compliance Manager SecurityRelatedandProprietaryInformationNotice 6705 Vallecitos Road Sunol, CA 94586 Enclosure1tothislettercontainsGEHitachiNuclearEnergysecurity USA related and proprietary information which is to be withheld from

T 925-918-6074 public

M2100XX disclosure in accordance with 10 CFR 2.390. Upon removal of Jeffrey.Smyly@ge.com Enclosure1,thebalanceofthislettermaybemadepublic.

M2200143 October 27, 2022 Director of the Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555-001 Attn: Document Control Desk

Subject:

Vallecitos Nuclear Center (VNC) Radiological Emergency Plan (REP) Revision 2

References:

1) NRC License R-33, Docket 05000073
2) NRC License DPR-1, Vallecitos Boiling Water Reactor (VBWR), Docket 05000018
3) NRC License DR-10, ESADA Vallecitos Experimental Superheat Reactor (EVESR), Docket 05000183
4) NRC License TR-1, General Electric Test Reactor (GETR), Docket 05000070
5) Letter from D. Hardesty (NRC) to M. Feyrer (GEH), NRC General Electric-Hitachi Nuclear Energy Americas, LLC - Issuance of Amendment No. 24 to Facility License No. R-33 for Vallecitos Nuclear Center Radiological Emergency Plan (EPID NO. L-2019-LLA-0159), 02/12/21 (ML20125A077)

Enclosed find Revision 2 to the GE Hitachi Energy, LLC (GEH), Vallecitos Nuclear Center (VNC)

Radiological Emergency Plan (REP) (Ref 5). Revision 2 was made effective 10/7/2022.

Setpoints for EALs RA3 and RU3 were recalculated and adjusted in this revision in a nonconservative direction as the result of the adoption of a more appropriate 10 CFR 20, Appendix B, Table 2 reference effluent concentration value. It was concluded that these changes are not a reduction in effectiveness of the REP because they correct a mistake that resulted in an RU3 setpoint that was not discernable above operational effluent release values. Enclosure 2 provides a detailed analysis supporting this change. Other minor administrative changes in this revision were also made without prior NRC approval pursuant to 10 CFR 50.54(q). These changes are to REP position titles and described activities in the decommissioning reactor facilities.

All changes to the REP are annotated by change bars in the right-hand margin.

If you have questions or need additional information, please contact me using the contact information above.

Sincerely, Digitally signed by Jeff Smyly DN: cn=Jeff Smyly gn=Jeff Smyly c=US United States l=US United Jeff Smyly States o=GEH ou=Vallecitos Nuclear Center Regulatory Compliance e=jeffrey.smyly@ge.com Reason: I am approving this document Location:

Date: 2022-10-27 11:52-07:00 Jeffrey Smyly, Regulatory Compliance Manager Enclosure 1: VNC Radiological Emergency Plan, Revision 2 (proprietary)

USNRC M220143 October 27, 2022 Page 2 of 2 : Evaluation of Vallecitos Nuclear Center NTR Effluent Abnormal Radiological Conditions Emergency Action Level Thresholds : VNC Radiological Emergency Plan, Revision 2 (public) cc: NRC Region IV Administrator, Arlington, TX D. Hardesty, NRC NRR/DANU/UNPL J. Parrott, NRC NMSS/DUWP/RDB JS22-006

VNC Radiological Emergency Plan -

Revision 2 (proprietary)

Evaluation of Vallecitos Nuclear Center NTR Effluent Abnormal Radiological Conditions Emergency Action Level Thresholds

VNC Radiological Emergency Plan, Revision 2 (public)