ML23261A592

From kanterella
Jump to navigation Jump to search
GE-Hitachi Nuclear Energy Americas, LLC, License Termination Plan for the Vallecitos Boiling Water Reactor License DPR-1
ML23261A592
Person / Time
Site: Vallecitos, Vallecitos Nuclear Center  File:GEH Hitachi icon.png
Issue date: 09/15/2023
From: Murray S
GE-Hitachi Nuclear Energy Americas
To:
Office of Nuclear Material Safety and Safeguards, Document Control Desk
Shared Package
ML23261A591 List:
References
M230128
Download: ML23261A592 (1)


Text

10 CFR 50.82(a)

GE Hitachi Nuclear Energy

  • HITACHI Scott P. Murray Manager, Facility Licensing

3901 Castle Hayne Road M230128 P.O. Sox 780 Wilmington, NC 2.8402 USA September 15, 2023 T (910) 819-5950 scott.murray@ge com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-001

Subject:

License Termination Plan for the Vallecitos Boiling Water Reactor license DPR-1 (Public)

References:

1) NRC License DPR-1, Vallecitos Boiling Water Reactor (VBWR), Docket 05000018
2) NRC license DR-1 0, ESADA Vallecitos Experimental Superheat Reactor (EVESR),

Docket 05000183

3) NRC Letter, GE Hitachi Nuclear Energy, Vallecitos Nuclear Center Shutdown Reactors - Acceptance of Request to Withdraw Exemption Request for Alternate Decommissioning Schedule (ADAMS Accession No. ML21258A042), October 12, 2021
4) GEH Letter, GEH Description of Process for Decommissioning the Vallecitos Nuclear Center Shutdown Reactors (ADAMS Accession No. ML21315A005), November 11, 2021
5) NRC Letter, GE Hitachi Nuclear Energy, Vallecitos Nuclear Center-Response to the Description for Decommissioning the Shutdown Reactors (ADAMS Accession No.

ML22066A569), April 8, 2022

6) GEH Letter, Vallecitos Nuclear Center Decommissioning Limited Post Shutdown Decommissioning Activities Report (ADAMS Accession No. ML22264A325, ML22264A326, ML22264A327, ML22264A328), September 21, 2022
7) MSTeams meeting between J. Parrott (NRC) and GEH, September 23, 2022
8) GEH Letter, VBWR License Termination Plan (ADAMS Accession No.

ML23250A267, ML23250A268,), September 7, 2023

8) MSTeams meeting between J. Parrott (NRC) and GEH, September 13, 2023 GE Hitachi Nuclear Energy Americas, LLC (GEH) is hereby providing redacted public versions of the enclosed license termination plan (L TP) and supporting-documents.

If there are any questions regarding these enclosures or if additional information is required, please contact me at the number above.

Since/} p rl/.

Sea~~* ~&J' Facility Licensing, Manager C/

VBWR Environmental Report (public) - (August 18, 2023) VBWR License Termination Plan (public) SDR Radiological Characterization Report, TR-22-011 Revision 1 (public) VNC Historical Site Assessment REN-TR-22-010 Revision 0 (public)

USNRC M230128 Page 2 of 2 September 15, 2023

cc: NRC Region IV Administrator S. Anderson, NRC RIV J. Parrott, NMSS/DUWP/RDB SPM 23-037