ML23083B340
ML23083B340 | |
Person / Time | |
---|---|
Site: | Vallecitos, Vallecitos Nuclear Center |
Issue date: | 03/24/2023 |
From: | Pedley C GE Hitachi Nuclear Energy |
To: | Office of Nuclear Material Safety and Safeguards, Document Control Desk |
References | |
M230039 | |
Download: ML23083B340 (1) | |
Text
- HITACHI GEHitachi NuclearEnergy
CharlesPedley
SiteManager,
VallecitosNuclearCenter
M230039 6705VallecitosRd
Sunol,CA94586
March 24, 2023 USA
T9255238101
U.S. Nuclear Regulatory Commission Charles.Pedley@ge.com
Attn: Document Control Desk Washington, D. C. 20555-001
Subject:
GEH Annual Shutdown Reactor Reports for the Year 2022
Reference:
License DPR-1, Docket 50-18 (VBWR), License DR-10, Docket 50-183 (EVESR), License TR-1, Docket 50-70 (GETR)
Enclosed are the 2023 Annual Reports for the deactivated Reactors (Vallecitos Boiling Water Reactor (VBWR), ESADA-Vallecitos Experimental Superheat Reactor (EVESR),
and the General Electric Test Reactor (GETR)} located at the GE Hitachi, Vallecitos Nuclear Center near Sunol, California.
If there are any questions or additional information required, please contact me at the number above.
Sincerely,
Digitally signed by CHARLES PEDLEY DN: cn=CHARLES PEDLEY c=US CHARLES PEDLEY l=7249af3244cf2daca5eb6a8620187dbce5b61cd7 o=MyApps e=223062202@ge.com Reason: I am approving this document Location:
Date: 2023-03-23 10:37-07:00 Charles Pedley, Site Manager Vallecitos Nuclear Center
Enclosures:
VBWR Annual Report No. 58 EVESR Annual Report No. 55 GETR Annual Report No. 64
cc: NRC Region IV Administrator J. Parrott, NRC NMSS CP 23-006
Enclosures
VBWRAnnualReportNo.58
EVESRAnnualReportNo.55
GETRAnnualReportNo.64
- HITACHI GEHitachiNuclearEnergy
VallecitosNuclear Center
Sunol,California
VALLECITOSBOILINGWATERREACTOR
(DEACTIVATED)
ANNUALREPORTNO.58
FORTHEYEAR2022
LICENSEDPR1
DOCKET5018
MARCH2023
VBWRAnnualReportNo.58
VallecitosBoilingWaterReactor
(Deactivated)
AnnualReportNo.58
GEHitachiNuclearEnergyhasmaintainedtheVallecitosBoilingWaterReactor(VBWR)ina
deactivatedstatusundertheauthorityofAmendmentNo.21toLicenseDPR1,Docket5018,
issuedOct22,2007.Inthisannualreport,asummaryofthestatusofthefacilityfortheperiod
ofJanuary1,2022,toDecember31,2022,ispresented,asrequiredbyparagraph5.d.2ofthe
license.
1.0
SUMMARY
Allreactorsystemshavebeenremovedfromthecontainmentexceptforthereactorvessel.
ThewaterfromthevesselwasremovedandtransferredtotheWasteEvaporatorPlant(WEP)
onJanuaryandNovember2022usingChangeAuthorizationCA202202,VBWRVesselEntry,
WaterRemovalandInspection/Survey,approvedon1/20/2022.
TheladderthatleadstothebasementwasreplacedwithstairsusingChangeAuthorization
202203,StairInstallationinVBWRLowerLevel,approvedonJune6,2022.
AsbestosandLeadabatementworkwascompletedincontainmentonOctoberandNovember
2022,usingCA202204,AsbestosandLeadabatement,approvedonJune29,2022.
Structuralconditionsandradiationandcontaminationlevelsremainatacceptablelevels.
Environmentaldataismaintainedonsiteandavailableforreview.
2.0STATUSOFFACILITY
Inaccordancewithwrittenprocedures,theFacilityManagercontrolsaccesstothecontainment
buildingandgeneralsystems.Thefacilitycontinuestobeindeactivatedstatusinsafestorage
condition.
3.0ROUTINEPATROLS
Thefacilitywasinspectedweekly,quarterly,andannuallyinaccordancewithwrittenstation
procedures.
Patrolsidentifiedthefollowing:
x UnchangedEfflorescenceonthebasementwallsandfloor.
x UnchangedSpallingofconcrete,corrosionstainsandrebarcorrosionontheBasement
PumpFoundationpedestal.
x UnchangedSeepageofwaterintothebasementborelocation.
Page1of2 VBWRAnnualReportNo.58
Theseconditionshavebeenevaluated,posenothreattostructuralintegrity,andarebeing
monitored.Thestructuralconditionofthefacilityisbeingactivelymonitoredandisstructurally
soundtoensuremaximumprotectionforpublichealthandsafety.
4.0RADIATIONANDCONTAMINATION
Completeradiationandcontaminationsurveysofthefacilityindicatethatlevelsremainlow.
Resultsofthesurveysarepresentedinattachment1.Airsamplingresultsarepresentedin
attachment2.Theradiation/contaminationlevelslistedarerepresentativebutnotnecessarily
maximumvalues.
AnalyticalresultsofgroundwatersamplesareavailableintheAnnualEnvironmentalReport
submittedonMarch2,2023.
5.0ACTIVITIES
Inspectionoftheinstalledgaugesshowednopropagationofconcretecracking.
Therewerenopreventiveorcorrectivemaintenanceactivitiesperformedhavingsafety
significanceduringthereportingperiod.
6.0ORGANIZATION
TheSiteManagerisC.Pedley.TheVBWRFacilityManagerisJ.G.Ayala.TheManager,
RegulatoryComplianceandEHSremainsJ.Smyly.
7.0CONCLUSION
GEHitachiNuclearEnergyconcludesthatthedeactivatedVBWRisbeingmaintainedinasafe
shutdowncondition.Theinspections,accesscontrol,andadministrativelycontrolledactivities
ensuremaximumprotectionforthepublichealthandsafety.Theprocedureswillbecontinued
tomaintainthishighlevelofprotection.
GEHitachiNuclearEnergy
VallecitosOperations
Digitally signed by CHARLES PEDLEY DN: cn=CHARLES PEDLEY c=US
CHARLES l=7249af3244cf2daca5eb6a8620187dbce5 b61cd7 o=MyApps e=223062202@ge.com Reason: I am approving this document
PEDLEY Location:
Date: 2023-03-23 10:38-07:00
C.Pedley,ManagerVallecitosNuclearCenter
Page2of2 VBWRANNUALSURVEY
VBWRSurveys Contamination DoseRates
SurveyID RS202201 0072 D142
RS202201 0073
SurveyDate(s) 5/26/2022 12/07/2022
Surveyor A.Flk M.Arnerich(signatureonoriginal)
S.Peterson
J.Hatfield
Instrument Ludlum2929 RadEye
InstrumentS/N 110575 33155 33155
CalibrationDueDate 9/15/2022 1/18/2023 7/14/2023I-
ATTACHMENT1
EVESR & VBWR SITE MAP
Survey No. 0-142 Date: 12/07 /22 Surveyor(s)
VBWR MAIN FLOOR Name & Signature on Original Doc ument Smear Data taken 5/26/22 (see RSR2 022-01-0072)
Page 1 of 2
0.050
0.094
0.048
MA CH IHATCH NERY
@) Q)
- EAM~
GENERA~OR \\ Q.ll.22.
HATCH 0.032
~
0.033 ap Legend
0 Smear Locat ion (100cm 2 )
Contact Dose Rate in 0 mR/hr
All field dose rates in mR/h r
Survey No. D-142 Date: 12/07 /22 Surveyor(s )
Name & Signat ur e o n Origina l VBWR BASEMENT AREA Document Smear Data taken 5/ 26/22 (see RSR2022-01-0073)
Page 2 o f 2
0
SLANTED W/\\ll 0. 313
0.123 G
SLANTED WAL L Map Legend
0 Smear Locat ion (100cm 2 )
Contact Dose Rate in 0 mR/hr
All field dose rates in mR{hr
VBWR Contamination Results
IIMdm' laell remnll DIiie VBWR BSMT 1 <MDA < MDA RSR2022-01-0073 5/26/2022 VBWR BSMT 2 570 < MDA RSR2022-01-0073 5/26/2022 VBWR BSMT 3 1406 <MDA RSR2022-01-0073 5/26/2022 VBWR BSMT 4 6129 < MDA RSR2022-0 1-0073 5/26/2022 VBWR BSMT 5 <MDA < MDA RSR2022-01 - 0073 5/26/2022 VBWR BSMT 6 <MD A < MDA RSR2022-01-0073 5/26/2022 VBWR Ma in 7 <MDA < MDA RSR2022-01-0072 5/26/2022 VBWR Ma in 8 <MDA < MDA RSR2022-0 1-0072 5/26/2022 VBWR Ma in 9 <MD A < MDA RSR2022-0 1-0072 5/26/2022 VBWR Ma in 10 <MDA < MDA RSR2022-0 1-0072 5/26/2022 VBWR Ma in 11 <MDA < MDA RSR2022-01-0072 5/26/2022 VBWR Ma in 12 <MDA < MDA RSR2022-0l-0072 5/26/2022 VBWR Ma in 13 <MDA < MDA RSR2022-01-0072 5/26/2022
Air Sample Data for VNC Reactor Annual Inspection
At Sample Time After Radon Decay After Radon Decay Reactor Location Date Alpha (uCi/ml) Beta (uCi/ml) Alpha (uCi/ml) Beta (uCi/ml) Alpha (DAC) Beta (DAC)
Main Floor 8/25/2022 8.51E-10 2.1 5E -09 l.37E -14 8.64E -13 0.005 0.000 VBWR Ba s ement 9/21/2022 4.78E -10 l.58E -09 3. 21E -14 3.07E -12 0.011 0.002 Fuel Pool 9/21/2022 3.22E-10 l.17E-09 7.78E-14 l.37E-12 0.026 0.001
Main Floor 11/29/2022 2.93 E-09 8.88E -09 l.69E-13 2.64E -12 0.056 0.001 EVESR Ba s ement 11/29/2022 4.21 E-09 l.12E-08 0.00E+00 5.94E-1 2 0.000 0.003 519' Level 11/29/2022 3.60 E- 09 l.05E-08 7.78 E-1 4 6.95 E-1 2 0.026 0.003
Main Floor 11/15/2022 l.53E -10 4.23E -10 2.36E-14 l.35E -12 0.008 0.001 GETR Basement 11/15/2022 l.95E -10 5.44E -10 0.00E+00 l.12E -12 0.000 0.001 Third Floor 11/15/2022 2.16E-10 5.84E -10 l.14E-13 7.65E -13 0.Q38 0.000
- HITACHI GEHitachi
GEHitachiNuclearEnergy
Vallecitos
NuclearCenter
VallecitosNuclear Center
Sunol,California
ESADAVALLECITOSEXPERIMENTAL
SUPERHEATREACTOR
(DEACTIVATED)
ANNUALREPORTNO.55
FORTHEYEAR2022
LICENSEDR10
DOCKET50183
MARCH2023
EVESRAnnualReportNo.55
ESADAVallecitosExperimentalSuperheatReactor
(Deactivated)
ANNUALREPORTNO.55
GEHitachiNuclearEnergy(GEH)hasmaintainedtheESADAVallecitosExperimentalSuperheat
Reactor(EVESR)inadeactivatedstatusundertheauthorityofAmendmentNo.7toLicenseDR 10,Docket50183,issuedDecember1,2008.Inthisannualreport,asummaryofthestatusof
thefacilityfortheperiodofJanuary1,2022,toDecember31,2022,ispresented,asrequiredby
Amendment7,AppendixA,TechnicalSpecifications,sectionC.1.
1.0
SUMMARY
Entryintothecontainmentbuildingwasmadeforroutineradiationsurveys,quarterlypatrols,
annualstructuralinspections,andageneralexaminationofconditionsthroughoutthebuilding.
Inaccordancewithwrittenprocedures,theFacilityManagercontrolsaccesstothecontainment
building.
Structuralconditionsandradiationandcontaminationlevelsremainatacceptablelevels.
Environmentaldataismaintainedonsiteandavailableforreview.
2.0STATUSOFFACILITY
Inaccordancewithwrittenprocedures,theFacilityManagercontrolsaccesstothecontainment
buildingandgeneralsystems.Thefacilitycontinuestobeindeactivatedstatus.Theplugstothe
reactorvessel,headstorageshield,andthewoodencoveroverthefuelstoragepoolremainin
place.
3.0ROUTINEPATROLS
Thefacilitywasinspectedweekly,quarterly,andannuallyinaccordancewithwrittenstation
procedures.
Threeissueswereidentifiedduringtheannualinspection:
- 1. Loose,falleninsulationwasfoundaroundtheperimeterofthemainfloorofEVESR.The
insulationisnotastructuralcomponentanddidnotcontainasbestos.
- 2. Corrosionwasidentifiedontheexposedrebarfloortieinextensionsthatarevisibleat
multiplelevelsofthefacility.Theseextensionsarenotstructuralcomponents.
- 3. Minimalefflorescencewasidentifiedatafewlocations.Thisconditionwasevaluatedand
doesnotposeastructuralissue.
Page1of2 EVESRAnnualReportNo.55
Thestructuralconditionofthefacilityremainsactivelymonitored,stableandstructurallysound
toensuremaximumprotectionforpublichealthandsafety.
4.0RADIATIONANDCONTAMINATION
Completeradiationandcontaminationsurveysofthefacilityindicatethatlevelsremainlow.
Resultsofthesurveysarepresentedinattachment1.Airsamplingresultsarepresentedin
attachment2.Theradiation/contaminationlevelslistedarerepresentativebutnotnecessarily
maximumvalues.
AnalyticalresultsofgroundwatersamplesareavailableintheAnnualEnvironmentalReport
submittedonMarch2,2023.
5.0ACTIVITIES
Routinepatrolsandinspectionswereconductedduringthisreportperiod.
Therewerenopreventiveorcorrectivemaintenanceactivitiesperformedhavingsafety
significanceduringthereportingperiod.
6.0ORGANIZATION
TheSiteManagerisC.Pedley.TheEVESRFacilityManagerisJ.G.Ayala.TheManager,
RegulatoryComplianceandEHSremainsJ.Smyly.
7.0CONCLUSION
GEHitachiNuclearEnergyconcludesthatthedeactivatedESADAVallecitosExperimental
SuperheatReactorisbeingmaintainedinasafeshutdowncondition.Theinspections,access
control,andadministrativelycontrolledactivitiesensuremaximumprotectionforthepublic
healthandsafety.Theprocedureswillbecontinuedtomaintainthishighlevelofprotection.
GEHitachiNuclearEnergy
VallecitosOperations
Digitally signed by CHARLES PEDLEY DN: cn=CHARLES PEDLEY c=US
CHARLES l=7249af3244cf2daca5eb6a8620187dbce5b6 1cd7 o=MyApps e=223062202@ge.com Reason: I am approving this document
PEDLEY Location:
Date: 2023-03-23 10:39-07:00
C.Pedley,ManagerVallecitosNuclearCenter
Page2of2 EVESRANNUALSURVEY
EVESRSurveys Contamination DoseRates
SurveyID RS202201 0061 D144
RS202201 0062
RS202201 0064
RS202201 0065
RS202201 0066
SurveyDate(s) 5/19/20225/25/2022 12/12/2022
Surveyor T.Lopez(signatureonoriginals) M.Arnerich(signatureonoriginal)
Instrument Ludlum2929 RadEye
InstrumentS/N 110575 33155 33155
CalibrationDueDate 9/15/2022 1/18/2023 7/14/2023--1
EVESR & VBWR SITE MAP Survey No. D-144 Date: 12/12/22 Surveyor(s)
Name & Signature on Original Document EVESR 549' LEVEL Smear Data taken 5/19/22 (see RSR2022-01-0065)
Page 1 of6
0.057
ESCAPE 28 HATCH 0 0.029
0.016
0.011
0.012
EQUIPMENT Map Legend HATCH
Q Smear Loca tion (100cm 2)
All field dose rates in mR/h r
Survey No. D-144 Date : 12/12/22 Surveyo r(s)
Nam e & Sign atu re o n O rigin a l Docu m ent EVESR 534' LEV E L Smea r Data take n 5/25/22 (see RSR2022-0l -0066)
Page 2 of 6
)0 DRAIN
0.276 0
V),,l{_E l><J VALVE ~
Map Legend
Smea r Loca tion ( 100cm 2 )
0 Conta c t Dose Rate in 0 mR/hr
All field dose rate s in mR/h r
Survey No. D-144 Date: 1 2/ 12/22 Surveyor (s)
Name & Signature on Original Document EVESR 519' LEVEL Smear Data taken 5/24 / 22 (see RSR2022-01-0061)
Page 3 of6
0.022 8
Map Legend
Q Smea r Location (100cm 2)
Al l field dose rates in mR/hr
Survey No. D-144 Date : 12/ 12/2 2 Surveyor(s)
Name & Signature on Original EVESR 503' LEVEL Document Smear Data tak e n 5/24/22 (see RSR2022-01-0062 )
Page 4 of 6
0.011
0.011
0.0 1 2 0
0.013
0.052
Map Legend
Q Smea r Locati on (100cm 2)
All field dose rates in mR/h r
Survey No. D-144 Date: 12/ 12/22 Surveyor(s)
Name & Signature on Original Docu ment EVESR 500' LEVEL Page 5 of6 IN-CORE FLUX AREA
0 0
0.051
Q Contact Dose Rat e In mR/hr
All ne 1d dose c tes in roBLhr
Surv ey No. D-144 Date: 12/12/22 Surv eyo r(s)
Na m e & Signature on Original Doc um en t EVESR 487' LEVEL Smea r Data taken 5/23/22 (see RSR2022-01-0064)
Page 6 of 6
0.023
0 0.046
CRD ROO M
0.012 0.052
Map Legend
0 Smear Location (100cm 2)
Contact Dose Rate in 0 mR/hr
All field dose rate5 in mR/hr
EVESR Contamination Data
EVESR 487' 1 <MDA <MDA RSR2022-01-0064 5/23/2022 EVESR 487' 2 <MDA <MDA RSR2022-01-0064 5/23/2022 EVESR 487' 3 <MDA <MDA RSR2022-0l-0064 5/23/2022 EVESR 487' 4 <MDA <MDA RSR2022-0l-0064 5/23/2022 EVESR 487' 5 <MDA <MDA RSR2022-01-0064 5/23/2022 EVESR 487' 6 <MDA <MDA RSR2022-0l-0064 5/23/2022 EVESR 487' 7 <MDA <MDA RSR2022-0l-0064 5/23/2022 EVESR 503' 8 <MDA <MDA RSR2022-01-0062 5/24/2022 EVESR 503' 9 <MDA <MDA RSR2022-01-0062 5/24/2022 EVESR 503' 10 <MDA <MDA RSR2022-01-0062 5/24/2022 EVESR 503' 11 5771 <MDA RSR2022-01-0062 5/24/2022 EVESR 503' 12 6008 <MDA RSR2022-01-0062 5/24/2022 EVESR 503' 13 <MDA <MDA RSR2022-01-0062 5/24/2022 EVESR 503' 14 10912 <MDA RSR2022-0l-0062 5/24/2022 EVESR 519' 15 <MDA <MDA RSR2022-0l-0061 5/25/2022 EVESR 519' 16 <MDA <MDA RSR2022-01-0061 5/25/2022 EVES R 519' 17 <MDA <MDA RSR2022-01-0061 5/25/2022 EVESR 519' 18 <MDA <MDA RSR2022-0l-0061 5/25/2022
EVESR 534' 19 <MDA <MDA RSR2022-01-0066 5/25/2022 EVES R 534' 20 <MDA <MDA RSR2022-01 -0066 5/25/2022 EVESR 534' 21 2389 <MDA RSR2022-01-0066 5/25/2022 EVESR 534' 22 <MDA <MDA RSR2022-01-0066 5/25/2022 EVES R 534' 23 2117 <MDA RSR2022 -01 -0066 5/25/2022 EVESR 549' 24 <MDA <MDA RSR2022-01-0065 5/19/2022 EVESR 549' 25 <MDA <MDA RSR2022-01 -0065 5/19/2022 EVESR 549' 26 <MDA <MDA RSR2022-01-0065 5/19/2022 EVES R 549' 27 <MDA <MDA RSR2022-01-0065 5/19/2022 EVES R 549' 28 <MDA <MDA RSR2022-01 -0065 5/19/2022 EVESR 549' 29 <MDA <MDA RSR2022-01-0065 5/19/2022 EVESR 549' 30 <MDA <MDA RSR2022 0065 5/19/2022
Air Sample Data for VNC Reactor Annual Inspection
At Sample Time After Radon Decay After Radon Decay Reactor Location Date Alpha (uCi/ml) Beta (uCi/ml) Alpha (uCi/ml) Beta (uCi/ml) Alpha (DAC) Beta (DAC)
Main Floor 8/25/2022 8.51E-10 2.1 5E -09 l.37E -14 8.64E -13 0.005 0.000 VBWR Ba s ement 9/21/2022 4.78E -10 l.58E -09 3. 21E -14 3.07E -12 0.011 0.002 Fuel Pool 9/21/2022 3.22E-10 l.17E-09 7.78E-14 l.37E-12 0.026 0.001
Main Floor 11/29/2022 2.93 E-09 8.88E -09 l.69E-13 2.64E -12 0.056 0.001 EVESR Ba s ement 11/29/2022 4.21 E-09 l.12E-08 0.00E+00 5.94E-1 2 0.000 0.003 519' Level 11/29/2022 3.60 E- 09 l.05E-08 7.78 E-1 4 6.95 E-1 2 0.026 0.003
Main Floor 11/15/2022 l.53E -10 4.23E -10 2.36E-14 l.35E -12 0.008 0.001 GETR Basement 11/15/2022 l.95E -10 5.44E -10 0.00E+00 l.12E -12 0.000 0.001 Third Floor 11/15/2022 2.16E-10 5.84E -10 l.14E-13 7.65E -13 0.Q38 0.000
- HITACHI GEHitachiNuclearEnergy
VallecitosNuclear Center
Sunol,California
GENERAL ELECTRICTESTREACTOR
(DEACTIVATED)
ANNUALREPORTNO.64
FORTHEYEAR2022
LICENSETR1
DOCKET5070
MARCH2023
GETRAnnualReportNo.64
GeneralElectricTestReactor
(Deactivated)
ANNUALREPORTNO.64
GEHitachi(GEH)hasmaintainedtheGeneralElectricTestReactor(GETR)ina
deactivatedstatusundertheauthorityofAmendmentNo.17toLicenseTR1,Docket
5070,issuedOctober22,2007asspecifiedinTS6.6.1toAmendmentNo.14,issued
February5,1986.Inthisannualreport,asummaryofthestatusofthefacilityforthe
periodofJanuary1,2022toDecember31,2022ispresented.
1.0
SUMMARY
ThefacilityremainsinpredominatelythesameconditiondescribedinAnnualReport
No.62.Entryintothereactorbuildingwasmadeforroutineradiationsurveysanda
generalexaminationofconditionsthroughoutthebuilding.Thecrane,elevator,and
ventilationwereservicedandtestedin2022inanticipationofbeginningremediation
activities.Suchactivitieshavenotbegun.
Structuralconditionsandradiationandcontaminationlevelsremainatacceptable
levels.Environmentaldataismaintainedonsiteandavailableforreview.
2.0STATUSOFFACILITY
Inaccordancewithwrittenprocedures,theFacilityManagercontrolsaccesstothe
containmentbuildingandgeneralsystems.Thefacilitycontinuestobeindeactivated
status.TherewerenochangesauthorizedbytheFacilityManagerpursuantto
10CFR50.59(a)in2022.
3.0ROUTINEPATROLS
Thefacilitywasinspectedweekly,quarterly,andannuallyinaccordancewithwritten
stationprocedures.
Thepresenceofminimalefflorescencewasidentifiedonfacilitybasementwallsduring
theannualinspection.Thisconditionwasevaluatedanddeterminedtonotposea
structuralissue.
Thestructuralconditionofthefacilityremainsactivelymonitored,stableand
structurallysoundtoensuremaximumprotectionforpublichealthandsafety.
4.0RADIATIONANDCONTAMINATION
Completeradiationandcontaminationsurveysofthefacilityindicatethatlevelsremain
low.Resultsofthesurveysarepresentedinattachment1.Airsamplingresultsare
Page1of2
GETRAnnualReportNo.64
presentedinattachment2.Theradiation/contaminationlevelslistedarerepresentative
butnotnecessarilymaximumvalues.
4.1 GETRStack
Althoughmaintenancewasperformedonthestackin2022,andthestackwastested,
therehasbeennoremediationeffortperformedfortheGETRreactor.Theventilation
systemisoperational,butnotcurrentlyinuse.
AnalyticalresultsofgroundwatersamplescanbefoundintheAnnualEnvironmental
ReportsubmittedonMarch2,2023.
5.0ACTIVITIES
Inspectionoftheinstalledgaugesshowednopropagationofconcretecracking.
Therewerenopreventiveorcorrectivemaintenanceactivitiesperformedhavingsafety
significanceduringthereportingperiod.
6.0ORGANIZATION
TheSiteManagerisC.Pedley.TheGETRFacilityManagerisJ.G.Ayala.TheManager,
RegulatoryComplianceandEHSremainsJ.Smyly.
7.0CONCLUSION
GEHitachiNuclearEnergyconcludesthatthedeactivatedGETRisbeingmaintainedina
safeshutdowncondition.Theinspections,accesscontrol,andadministratively
controlledactivitiesensuremaximumprotectionforthepublichealthandsafety.The
procedureswillbecontinuedtomaintainthishighlevelofprotection.
GEHitachiNuclearEnergy
VallecitosOperations
Digitally signed by CHARLES PEDLEY DN: cn=CHARLES PEDLEY c=US CHARLES l=7249af3244cf2daca5eb6a8620187dbce5b61cd7 o=MyApps e=223062202@ge.com
Reason: I am approving this document PEDLEY Location:
Date: 2023-03-23 10:39-07:00
C.Pedley,ManagerVallecitosNuclearCenter
Page2of2
GETRANNUALSURVEY
GETRSurveys Contamination DoseRates
SurveyID RSR202201 0136 C032
RSR202201 0152
RSR202201 0149
RSR202201 0135
SurveyDate(s) 7/11/2022 12/07/2022
7/13/2022
Surveyor T.Lopez(signatureonoriginals) M.Arnerich(signatureonoriginal)
Instrument Ludlum2929 LudlumI 3030 RadEye
InstrumentS/N 111575 190648 33155I CalibrationDueDate 9/15/2022 3/7/2023 7/14/2023
ATTACHMENT1
GETR SITE MAP
901. SA),,W:\\.E tBm )
LOCATlOt~M
901. SAJ.11'1.E 19ml LCCA"t"OO.s1
SOL ~PLE (&KG)
LOCATIC>>i"2
ATTACHMENT1
Survey No. C-032 Da te: 12/07 /22 Surveyor(s)
Name & Signature on Original Document GETR BASEMENT Smear Data taken 7 /11/22 (see RS R 2022-01-0136)
Page 5 of 5
- Rx 0.0 2~
\\
4 0.064
\\ \\ 0.360,-
C Y LIND ER STO RAGE AREA
\\ \\
HCA 0.043 0,, 0-43 /
0.070 ',,..,_,.........,..,..,...,...--- -r 0
0.031
Step Off Pa d
HCA High Contaminati o n A rea
Boundary
Gene ral Area Dose Rate (mrem /hrl Q Contact Dose Rate (m rem/hr)
Q Smear Location (100 cm2)
ATTACHMENT1
Survey No. C-032 Date: 12/07 /22 Surveyor(s)
Name & Signature on Original Document GETR 1 ST FLOOR Smear Data taken 7 /13/22 (see RSR 2022-01-0152 }
Page 4 of 5
0
cg] l!.130.
0.126 0
- 0. 502 **,
0.073 ;
0.097 0 ',,~',0 0
0.042
Step Off Pad
High Contaminat ion Area
0.0 10 Boundary EQUIPMENT HATCH General Area Dose Rate
(mrem / h r)
Contact Dose Rate 0 (mrem / h r)
Smear Locat ion (100 cm2 )
0
ATTACHMENT1
Survey No. C-032 Date: 12/07 /22 Surveyor(s)
Name & Signature on Original Document GETR MEZZANINE Pag e 3 ofS
(OPEN AREA)
0.014
0.01 1
0.023
0.0 15
Step Off Pad
HCA High Contam ina tion Area
Bo und a ry
Gen eral Area Dose Rate (mrem/hr)
Co ntact Dose Rate 0 (mrem/hr)
ATTACHMENT1
Survey No. C-032 Date: 12/07 /22 Surveyor(s)
Name & Signature on Original Document GETR 2ND FLOOR Smear Data taken 7 /13/22 (see RSR 2022-01-0149)
Page 2 of 5
0.026
Step Off Pad
High Contamination Area
Bo und a ry
Genera l Area Dose Rate (mrem/hr)
Cont a ct Dose Ra te 0 (mrem/hr)
Smear Locat ion (100 cm2) 0
ATTACHMENT1
Survey No. C-032 Date : 12/07 /22 Surveyor(s)
Name & Signature on Original Document GETR 3RD FLOOR Smear Data taken 7 /11/22 (see RSR 2022-01-0135)
Page 1 of 5
REACTOR CAVITY
O.OS9 FUEL~
0 _24 J3RIDG~
0.035
0.077
0.038 DRA1fl0 RAISED PLATFORM AREA
0.020
0.010
0.020
Step Off Pad
High Contaminat ion Area
Boundary
Gener al Area Dose Rate (mr em/h r)
Cont act Dose Rate 0 (mr em /hr)
Smear Locat ion (100 cm2) 0
ATTACHMENT1
GETR Contamination Data
..... DIiie GETR L552 (BSMT) 1 < MDA < MDA RS2022-01-0136 7/11/2022 GETR L552 ( BSMT) 2 < MDA < MDA RS2022-01-0136 7/11/2022 GETR L552 (BSMT) 3 < MDA < MDA RS2022-01-0136 7/11/2022 GETR L552 (BSMT) 4 5687 < MDA RS2022-01-0136 7/11/2022 GETR L552 (BSMT) 5 589 < MDA RS2022-01-0136 7/11/2022 GETR L552 (BSMT) 6 202754 14 RS2022-01-0136 7/11/2022 GETR L552 (BSMT) 7 4791 < MDA RS2022-01-0136 7/11/2022 GETR L552 (BSMT) 8 < MDA < MDA RS2022-01-0136 7/11/2022 GETR L567 (1st Fl) 9 < MDA < MDA RS2022-01-0152 7/13/2022 GETR L567 (1st Fl) 10 143 < MDA RS2022-01-0152 7/13/2022 GETR L567 (1st Fl} 11 174 < MDA RS2022-01-0152 7/13/2022 GETR L567 (1st Fl} 12 808 < MDA RS2022-01-0152 7/13/2022 GETR L567 (1st Fl} 13 79986 < MDA RS2022-01-0152 7/13/2022 GETR L567 (1st Fl} 14 20621 <MDA RS2022-01-0152 7/13/2022 GETR L567 (1st Fl} 15 908 < MDA RS2022-01-0152 7/13/2022 GETR L567 (1st Fl} 16 1133 < MDA RS2022-01-0152 7/13/2022 GETR L567 (1st Fl) 17 101 < MDA RS2022-01-0152 7/13/2022 GETR L589 (2nd Fl) 18 < MDA < MDA RS2022-01-0149 7/13/2022 GETR L589 (2nd Fl) 19 < MDA < MDA RS2022-01-0149 7/13/2022 GETR L589 (2nd Fl) 20 1703 < MDA RS2022-01-0149 7/13/2022 GETR L589 (2nd Fl) 21 16654 < MDA RS2022-01-0149 7/13/2022 GETR L589 (2nd Fl) 22 31086 < MDA RS2022-01-0149 7/13/2022 GETR L589 (2nd Fl) 23 < MDA < MDA RS2022-01-0149 7/13/2022 GETR L589 (2nd Fl) 24 < MDA < MDA RS2022-01-0149 7/13/2022 GETR L589 (2nd Fl) 25 < MDA < MDA RS2022-01-0149 7/13/2022 GETR L611 (3rd Fl} 26 1023175 < MDA RS2022-01-0135 7/11/2022 GETR L611 (3rd Fl} 27 < MDA < MDA RS2022-01-0135 7/11/2022 GETR L611 (3rd Fl} 28 < MDA < MDA RS2022-01-0135 7/11/2022 GETR L611 (3rd Fl} 29 < MDA < MDA RS2022-01-0135 7/11/2022
Air Sample Data for VNC Reactor Annual Inspection
At Sample Time After Radon Decay After Radon Decay Reactor Location Date Alpha (uCi/ml) Beta (uCi/ml) Alpha (uCi/ml) Beta (uCi/ml) Alpha (DAC) Beta (DAC)
Main Floor 8/25/2022 8.51E-10 2.1 5E -09 l.37E -14 8.64E -13 0.005 0.000 VBWR Ba s ement 9/21/2022 4.78E -10 l.58E -09 3. 21E -14 3.07E -12 0.011 0.002 Fuel Pool 9/21/2022 3.22E-10 l.17E-09 7.78E-14 l.37E-12 0.026 0.001
Main Floor 11/29/2022 2.93 E-09 8.88E -09 l.69E-13 2.64E -12 0.056 0.001 EVESR Ba s ement 11/29/2022 4.21 E-09 l.12E-08 0.00E+00 5.94E-1 2 0.000 0.003 519' Level 11/29/2022 3.60 E- 09 l.05E-08 7.78 E-1 4 6.95 E-1 2 0.026 0.003
Main Floor 11/15/2022 l.53E -10 4.23E -10 2.36E-14 l.35E -12 0.008 0.001 GETR Basement 11/15/2022 l.95E -10 5.44E -10 0.00E+00 l.12E -12 0.000 0.001 Third Floor 11/15/2022 2.16E-10 5.84E -10 l.14E-13 7.65E -13 0.Q38 0.000