Limited Post Shutdown Decommissioning Activities Report Update
ML22326A352
Person / Time
Site: Vallecitos, Vallecitos Nuclear Center
Issue date: 11/22/2022
From: Martinez C
GE Hitachi Nuclear Energy
To:
Office of Nuclear Material Safety and Safeguards, Document Control Desk
Shared Package
ML22326A351 List:
References
M220157
Download: ML22326A352 (1)


Text

10 CFR 50.82(a)(4)

M220157 November 22, 2022 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-001

Subject:

Vallecitos Nuclear Center Limited Post Shutdown Decommissioning Activities Report Update

References:

1) NRC License DPR-1, Vallecitos Boiling Water Reactor (VBWR), Docket 05000018
2) NRC License DR-10, ESADA Vallecitos Experimental Superheat Reactor (EVESR), Docket 05000183
3) GEH Letter, Vallecitos Nuclear Center Decommissioning Limited Post Shutdown Decommissioning Activities Report, (ADAMS Accession No. ML22264A325), September 21, 2022 GE Hitachi Nuclear Energy, LLC (GEH) is providing the enclosed update to the activities included in the Vallecitos Nuclear Center Limited Post Shutdown Decommissioning Activities Report (Ref 3).

If there are any questions regarding this report or additional information required, please contact me at the number above.

Sincerely,

GEH Affidavit : Changes to the Vallecitos Nuclear Center Limited Post Shutdown Decommissioning Activities Report cc: NRC Region IV Administrator S. Anderson, NRC RIV J. Parrott, NMSS/DUWP/RDB CM 22-006 GE Hitachi Nuclear Energy Carlos Martinez Site Manager, Vallecitos Nuclear Center 6705 Vallecitos Road Sunol, CA 94586 USA T 925-495-9173 Carlos1.Martinez@ge.com

Changes to the Vallecitos Nuclear Center Limited Post Shutdown Decommissioning Activities Report