ML22089A223
ML22089A223 | |
Person / Time | |
---|---|
Site: | Vallecitos Nuclear Center, Vallecitos |
Issue date: | 03/25/2022 |
From: | Feyrer M GE Hitachi Nuclear Energy |
To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards |
References | |
M220053 | |
Download: ML22089A223 (36) | |
Text
GEHitachiNuclearEnergy
MattJ.Feyrer
SiteManager,
VallecitosNuclearCenter
6705VallecitosRd
M220053 Sunol,CA94586
USA
March 25, 2022 T9259186018
Matt.feyrer@ge.cm
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-001
Subject:
GEH Annual Shutdown Reactor Reports for the Year 2021
Reference:
License DPR-1, Docket 50-18 (VBWR), License DR-10, Docket 50-183 (EVESR), License TR-1, Docket 50-70 (GETR)
Enclosed are the 2022 Annual Reports for the deactivated Reactors (Vallecitos Boiling Water Reactor (VBWR), ESADA-Vallecitos Experimental Superheat Reactor (EVESR),
and the General Electric Test Reactor (GETR)} located at the GE Hitachi, Vallecitos Nuclear Center near Sunol, California.
If there are any questions or additional information required, please contact me at the number above.
Sincerely, Digitally signed by Matt Feyrer Matt DN: cn=Matt Feyrer gn=Matt Feyrer c=US United States l=US United States o=Vallecitos Nuclear Center ou=VNC e=matt.feyrer@ge.com Feyrer Reason: Document Approver Location:
Date: 2022-03-28 05:05-07:00 Matt Feyrer, Site Manager Vallecitos Nuclear Center
Enclosures:
VBWR Annual Report No. 57 EVESR Annual Report No. 54 GETR Annual Report No. 63 cc: NRC Region IV Administrator J. Parrott, NRC NMSS MJF 22-001
Enclosures
VBWRAnnualReportNo.57
EVESRAnnualReportNo.54
GETRAnnualReportNo.63
GEHitachiNuclearEnergy
VallecitosNuclearCenter
Sunol,California
VALLECITOSBOILINGWATERREACTOR
(DEACTIVATED)
ANNUALREPORTNO.57
FORTHEYEAR2021
LICENSEDPR1
DOCKET5018
MARCH2022
VBWRAnnualReportNo.57
VallecitosBoilingWaterReactor
(Deactivated)
AnnualReportNo.57
GEHitachiNuclearEnergyhasmaintainedtheVallecitosBoilingWaterReactor(VBWR)ina
deactivatedstatusundertheauthorityofAmendmentNo.21toLicenseDPR1,Docket5018,
issuedOct22,2007.Inthisannualreport,asummaryofthestatusofthefacilityfortheperiod
ofJanuary1,2021,toDecember31,2021,ispresented,asrequiredbyparagraph5.d.2ofthe
license.
1.0
SUMMARY
Allreactorsystemshavebeenremovedfromthecontainmentexceptforthereactorvessel.
Thewaterlevelwithinthereactorvesselwasmonitoredandhasremainedessentiallyconstant
throughoutthereportperiod.
Structuralconditionsandradiationandcontaminationlevelsremainatacceptablelevels.
Environmentaldataismaintainedonsiteandavailableforreview.
2.0STATUSOFFACILITY
Inaccordancewithwrittenprocedures,theFacilityManagercontrolsaccesstothecontainment
buildingandgeneralsystems.Thefacilitycontinuestobeindeactivatedstatusinsafestorage
condition.
3.0ROUTINEPATROLS
Thefacilitywasinspectedweekly,quarterly,andannuallyinaccordancewithwrittenstation
procedures.
Patrolsidentifiedthefollowing:
x UnchangedEfflorescenceonthebasementwallsandfloor.
x UnchangedSpallingofconcrete,corrosionstainsandrebarcorrosionontheBasement
PumpFoundationpedestal.
x Seepageofwaterintothebasementborelocation.
Theseconditionshavebeenevaluated,posenothreattostructuralintegrity,andarebeing
monitored.Thestructuralconditionofthefacilityisbeingactivelymonitoredandisstructurally
soundtoensuremaximumprotectionforpublichealthandsafety.
Page1of2
VBWRAnnualReportNo.57
4.0RADIATIONANDCONTAMINATION
Completeradiationandcontaminationsurveysofthefacilityindicatethatlevelsremainlow.
Resultsofthesurveysarepresentedinattachment1.Airsamplingresultsarepresentedin
attachment2.Theradiation/contaminationlevelslistedarerepresentativebutnotnecessarily
maximumvalues.
AnalyticalresultsofgroundwatersamplesareavailableintheannualEnvironmentalReport
submittedonMarch9,2022.
5.0ACTIVITIES
Inspectionoftheinstalledgaugesshowednopropagationofconcretecracking.
Therewerenopreventiveorcorrectivemaintenanceactivitiesperformedhavingsafety
significanceduringthereportingperiod.
6.0ORGANIZATION
TheSiteManagerremainsM.J.Feyrer.TheVBWRFacilityManagerremainsK.P.Zanotto.The
Manager,RegulatoryComplianceandEHSremainsJ.Smyly.
7.0CONCLUSION
GEHitachiNuclearEnergyconcludesthatthedeactivatedVBWRisbeingmaintainedinasafe
shutdowncondition.Theinspections,accesscontrol,andadministrativelycontrolledactivities
ensuremaximumprotectionforthepublichealthandsafety.Theprocedureswillbecontinued
tomaintainthishighlevelofprotection.
GEHitachiNuclearEnergy
VallecitosOperations
Digitally signed by Matt Feyrer
Matt Feyrer DN: cn=Matt Feyrer gn=Matt Feyrer c=US United States l=US United States o=Vallecitos Nuclear Center ou=VNC e=matt.feyrer@ge.com
Reason: Document Approver Location:
Date: 2022-03-28 05:01-07:00
M.J.Feyrer,ManagerVallecitosNuclearCenter
Page2of2
VBWRAnnualSurvey
SurveyNumber: D041
DateSurveyPerformed:September10,2021
DoseRateInstrument: RadEyeS/N33155
InstrumentCalibrationdate:June14,2021
ContaminationSmearscountedon:TennelecXLBSystemA
Calibrationdate:May6,2021
SurveyPerformedby: SignatureonOriginalDocument
SurveyReviewedby: SignatureonOriginalDocument
ATTACHMENT1
GEHitachiVallecitosNuclearCenter
RadiologicalCountingLaboratory
ATTACHMENT1(surveydata)
VBWRContainmentSmearResults-2021AnnualSurvey
Instrument: TennelecXLBSystemB AnalyzedBy:
SignaturesonOriginal
SerialNo.: 29721 Signature: Documentsonsite
CalibrationDate: 21Mar2021 Reviewed:
BetaEfficiency: 30.36% BetaMDA: 22.6DPM/100cm2
AlphaEfficiency: 33.57% AlphaMDA: 10.7DPM/100cm2
SampleDate: 9/10/2021 CountDate: 9/15/2021
Alpha Beta
2 No. Location NCPM/100cm DPM/100cm2 NCPM/100cm 2 DPM/100cm2
0 Blank 0 <MDA 2.42 <MDA
1 MainFloor 0 <MDA 8.42 27.7
2 MainFloor 0 <MDA 65.42 215
3 MainFloor 0 <MDA 38.42 127
4 MainFloor 0 <MDA 48.42 159
5 MainFloor 0.93 <MDA 44.42 146
6 MainFloor 0 <MDA 56.42 186
7 MainFloor 0 <MDA 74.42 245
8 MainFloor 0.93 <MDA 50.42 166
9 MainFloor 0 <MDA 113.42 374
10 MainFloor 0 <MDA 56.42 186
11 MainFloor 0 <MDA 36.42 120
12 Basement 0 <MDA 267.42 881
13 Basement 0 <MDA 1486.42 4900
14 Basement 0 <MDA 1669.42 5500
15 Basement 0 <MDA 527.42 1740
16 Basement 0 <MDA 403.42 1330
17 Basement 0.93 <MDA 423.42 1390
18 Basement 0 <MDA 1123.42 3700
Page1of1
ATTACHMENT2:AirSampleRadonCalculationsforVallecitosReactorAnnualInspection2020 Initial AtSamplingTime Sample Alpha Beta Alpha Beta Reactor Location Sys. Volume(ml) ncpm uCi/ml ncpm uCi/ml ncpm uCi/ml ncpm uCi/ml VBWR FirstFloor B 2.83E+06 1308.63 6.20E10 3573.92 1.87E09 2201.833 1.04E09 6013.292 3.15E09 Basement B 2.83E+06 845.13 4.00E10 2048.72 1.07E09 3048.063 1.44E09 7388.956 3.87E09 FuelPool B 2.83E+06 1505.33 7.13E10 3970.82 2.08E09 2714.577 1.29E09 7160.621 3.75E09 EVESR FirstFloor B 2.83E+06 86.83 4.11E11 183.62 9.62E11 8927.885 4.23E09 18879.86 9.89E09 Basement B 2.83E+06 305.63 1.45E10 686.42 3.60E10 19536.83 9.26E09 43878.13 2.30E08 519'Level B 2.83E+06 244.53 1.16E10 572.32 3.00E10 19824.43 9.39E09 46398.87 2.43E08 GETR FirstFloor B 2.83E+06 1042.83 4.94E10 2731.22 1.43E09 2062.63 9.77E10 5402.123 2.83E09 Basement B 2.83E+06 2012.63 9.54E10 5080.82 2.66E09 5761.308 3.00E+00 14544.24 7.62E09 ThirdFloor B 2.83E+06 631.63 2.99E10 1470.82 7.71E10 2677.957 1.27E09 6235.917 3.27E09 TennelecSystem"A"Efficiency&ConversionFactors TennelecSystem"B"Efficiency&ConversionFactors AlphaEfficiency 36.00% AlphaEfficiency 33.57%
BetaEfficiency 33.19% BetaEfficiency 30.36%
dpm/uCi 2.22E+06 dpm/uCi 2.22E+06 Alphacpm/uCi 7.99E+05 Alphacpm/uCi 7.45E+05 Betacpm/uCi 7.37E+05 Betacpm/uCi 6.74E+05 RadonDecayFactors Sampling Count
Minutes Time Time Decay Decay Minutes Time
Reactor Location DateSampled TimeOn TimeOff sampled Factor Counted Time Factor Counted Factor RadonDecayFactor VBWR FirstFloor 9/9/2021 7:45 8:05 20 1.248782 8:13 8 1.203025 10 1.11997 1.683 VBWR Basement 11/18/2021 8:42 9:02 20 1.248782 9:43 41 2.578741 10 1.11997 3.607 VBWR FuelPool 11/18/2021 8:17 8:37 20 1.248782 8:48 11 1.28937 10 1.11997 1.803 EVESR FirstFloor 9/14/2021 10:11 10:31 20 1.248782 14:08 217 73.51669 10 1.11997 102.820 EVESR Basement 9/14/2021 10:56 11:16 20 1.248782 14:29 193 45.70518 10 1.11997 63.923 EVESR 519'Level 9/14/2021 10:33 10:53 20 1.248782 14:18 205 57.96631 10 1.11997 81.072 GETR FirstFloor 9/9/2021 7:03 7:23 20 1.248782 7:38 15 1.414214 10 1.11997 1.978 GETR Basement 9/9/2021 10:38 10:58 20 1.248782 11:29 31 2.046748 10 1.11997 2.863 GETR ThirdFloor 9/9/2021 10:09 10:29 20 1.248782 11:17 48 3.031433 10 1.11997 4.240
GEHitachi GEHitachiNuclearEnergy
VallecitosNuclearCenter
VallecitosNuclearCenter
Sunol,California
ESADAVALLECITOSEXPERIMENTAL
SUPERHEATREACTOR
(DEACTIVATED)
ANNUALREPORTNO.54
FORTHEYEAR2021
LICENSEDR10
DOCKET50183
MARCH2022
EVESRAnnualReportNo.54
ESADAVallecitosExperimentalSuperheatReactor
(Deactivated)
ANNUALREPORTNO.54
GEHitachiNuclearEnergy(GEH)hasmaintainedtheESADAVallecitosExperimental
SuperheatReactor(EVESR)inadeactivatedstatusundertheauthorityofAmendment
No.7toLicenseDR10,Docket50183,issuedDecember1,2008.Inthisannualreport,
asummaryofthestatusofthefacilityfortheperiodofJanuary1,2021,toDecember
31,2021,ispresented,asrequiredbyAmendment7,AppendixA,Technical
Specifications,sectionC.1.
1.0
SUMMARY
Entryintothecontainmentbuildingwasmadeforroutineradiationsurveys,quarterly
patrols,annualstructuralinspections,andageneralexaminationofconditions
throughoutthebuilding.Inaccordancewithwrittenprocedures,theFacilityManager
controlsaccesstothecontainmentbuilding.
Structuralconditionsandradiationandcontaminationlevelsremainatacceptablelevels.Environmental
dataismaintainedonsiteandavailableforreview.
2.0STATUSOFFACILITY
Thefacilitycontinuestobeindeactivatedstatus.Theplugstothereactorvessel,head
storageshield,andthewoodencoveroverthefuelstoragepoolremaininplace.
3.0ROUTINEPATROLS
Thefacilitywasinspectedweekly,quarterly,andannuallyinaccordancewithwritten
stationprocedures.
Threeissueswereidentifiedduringtheannualinspection:
- 1. Loose,falleninsulationwasfoundaroundtheperimeterofthemainfloorof
EVESR.Theinsulationisnotastructuralcomponentanddidnotcontain
asbestos.
- 2. Corrosionwasidentifiedontheexposedrebarfloortieinextensionsthatare
visibleatmultiplelevelsofthefacility.Theseextensionsarenotstructural
components.
- 3. Minimalefflorescencewasidentifiedatafewlocations.Thisconditionwas
Page1of2
EVESRAnnualReportNo.54
evaluatedanddoesnotposeastructuralissue.
Thestructuralconditionofthefacilityremainsactivelymonitored,stableand
structurallysoundtoensuremaximumprotectionforpublichealthandsafety
4.0RADIATIONANDCONTAMINATION
Completeradiationandcontaminationsurveysofthefacilityindicatethatlevelsremain
low.Resultsofthesurveysarepresentedinattachment1.Airsamplingresultsare
presentedinattachment2.Theradiation/contaminationlevelslistedarerepresentative
butnotnecessarilymaximumvalues.
AnalyticalresultsofgroundwatersamplesareavailableintheannualEnvironmental
ReportsubmittedonMarch9,2022.
5.0ACTIVITIES
Routinepatrolsandinspectionswereconductedduringthisreportperiod.
Therewerenopreventiveorcorrectivemaintenanceactivitiesperformedhavingsafety
significanceduringthereportingperiod.
6.0ORGANIZATION
TheSiteManagerremainsM.J.Feyrer.TheEVESRFacilityManagerremainsK.P.
Zanotto.TheManager,RegulatoryComplianceandEHSremainsJ.Smyly.
7.0CONCLUSION
GEHitachiNuclearEnergyconcludesthatthedeactivatedESADAVallecitos
ExperimentalSuperheatReactorisbeingmaintainedinasafeshutdowncondition.The
inspections,accesscontrol,andadministrativelycontrolledactivitiesensuremaximum
protectionforthepublichealthandsafety.Theprocedureswillbecontinuedto
maintainthishighlevelofprotection.
GEHitachiNuclearEnergy
VallecitosOperations
Digitally signed by Matt Feyrer
Matt Feyrer DN: cn=Matt Feyrer gn=Matt Feyrer c=US United States l=US United States o=Vallecitos Nuclear Center ou=VNC e=matt.feyrer@ge.com Reason: Document Approver
Location:
Date: 2022-03-28 05:02-07:00
M.J.Feyrer
ManagerVallecitosNuclearCenter
Page2of2
EVESRAnnualSurvey
SurveyNumber: D042
DateSurveyPerformed:September10,2021
DoseRateInstrument: RadEyeS/N33155
InstrumentCalibrationdate:June14,2021
ContaminationSmearscountedon:TennelecXLBSystemA
Calibrationdate:May6,2021
SurveyPerformedby: SignatureonOriginalDocument
SurveyReviewedby: SignatureonOriginalDocument
GEHitachiVallecitosNuclearCenter
RadiologicalCountingLaboratory
ATTACHMENT1(surveydata)
EVESRContainmentSmearResults-2021AnnualSurvey
Instrument: TennelecXLBSystemB AnalyzedBy:
SignaturesonOriginal
SerialNo.: 29721 Signature: Documentsonsite
CalibrationDate: 21Mar2021 Reviewed:
BetaEfficiency: 30.36% BetaMDA: 22.6DPM/100cm2
AlphaEfficiency: 33.57% AlphaMDA: 10.7DPM/100cm2
SampleDate: 9/10/2021 CountDate: 9/15/2021
Alpha Beta
2 No. Location NCPM/100cm DPM/100cm2 NCPM/100cm 2 DPM/100cm2
0 Blank 0 <MDA 0 <MDA
1 549Level 0 <MDA 2.42 <MDA
2 549Level 0.93 <MDA 8.42 27.7
3 549Level 0 <MDA 6.42 <MDA
4 549Level 0.93 <MDA 35.42 117
5 549Level 0 <MDA 45.42 150
6 549Level 0 <MDA 13.42 44.2
7 549Level 0 <MDA 1.42 <MDA
8 549Level 0.93 <MDA 31.42 103
9 549Level 0 <MDA 53.42 176
10 549Level 1.93 <MDA 39.42 130
11 549Level 0 <MDA 15.42 50.8
12 549Level 0 <MDA 24.42 80.4
13 534Level 0 <MDA 34.42 113
14 534Level 0 <MDA 733.42 2420
15 534Level 0 <MDA 133.42 439
16 534Level 0 <MDA 147.42 486
17 534Level 0 <MDA 207.42 683
18 534Level 0.93 <MDA 83.42 275
19 534Level 0 <MDA 189.42 624
20 534Level 0.93 <MDA 94.42 311
21 519Level 0 <MDA 58.42 192
22 519Level 0 <MDA 22.42 73.8
23 519Level 0 <MDA 62.42 206
24 519Level 0 <MDA 67.42 222
25 519Level 0 <MDA 52.42 173
Page1of2
GEHitachiVallecitosNuclearCenter
RadiologicalCountingLaboratory
Alpha Beta
2 No. Location NCPM/100cm DPM/100cm2 NCPM/100cm 2 DPM/100cm2
26 519Level 0 <MDA 47.42 156
27 503Level 0 <MDA 246.42 812
28 503Level 0 <MDA 57.42 189
29 503Level 0 <MDA 108.42 357
30 503Level 0 <MDA 51.42 169
31 503Level 0 <MDA 122.42 403
32 503Level 0 <MDA 252.42 831
33 503Level 0.93 <MDA 142.42 469
34 503Level 0 <MDA 1250.42 4120
35 503Level 0.93 <MDA 155.42 512
36 503Level 0 <MDA 109.42 360
37 500Level 0.93 <MDA 1086.42 3580
38 503Level 0 <MDA 261.42 861
39 503Level 0 <MDA 148.42 489
40 487Level 0.93 <MDA 127.42 420
41 487Level 0 <MDA 393.42 1300
42 487Level 0.93 <MDA 76.42 252
43 487Level 0 <MDA 196.42 647
44 487Level 0.93 <MDA 311.42 1030
45 487Level 2.93 <MDA 357.42 1180
Page2of2
ATTACHMENT2:AirSampleRadonCalculationsforVallecitosReactorAnnualInspection2020 Initial AtSamplingTime Sample Alpha Beta Alpha Beta Reactor Location Sys. Volume(ml) ncpm uCi/ml ncpm uCi/ml ncpm uCi/ml ncpm uCi/ml VBWR FirstFloor B 2.83E+06 1308.63 6.20E10 3573.92 1.87E09 2201.833 1.04E09 6013.292 3.15E09 Basement B 2.83E+06 845.13 4.00E10 2048.72 1.07E09 3048.063 1.44E09 7388.956 3.87E09 FuelPool B 2.83E+06 1505.33 7.13E10 3970.82 2.08E09 2714.577 1.29E09 7160.621 3.75E09 EVESR FirstFloor B 2.83E+06 86.83 4.11E11 183.62 9.62E11 8927.885 4.23E09 18879.86 9.89E09 Basement B 2.83E+06 305.63 1.45E10 686.42 3.60E10 19536.83 9.26E09 43878.13 2.30E08 519'Level B 2.83E+06 244.53 1.16E10 572.32 3.00E10 19824.43 9.39E09 46398.87 2.43E08 GETR FirstFloor B 2.83E+06 1042.83 4.94E10 2731.22 1.43E09 2062.63 9.77E10 5402.123 2.83E09 Basement B 2.83E+06 2012.63 9.54E10 5080.82 2.66E09 5761.308 3.00E+00 14544.24 7.62E09 ThirdFloor B 2.83E+06 631.63 2.99E10 1470.82 7.71E10 2677.957 1.27E09 6235.917 3.27E09 TennelecSystem"A"Efficiency&ConversionFactors TennelecSystem"B"Efficiency&ConversionFactors AlphaEfficiency 36.00% AlphaEfficiency 33.57%
BetaEfficiency 33.19% BetaEfficiency 30.36%
dpm/uCi 2.22E+06 dpm/uCi 2.22E+06 Alphacpm/uCi 7.99E+05 Alphacpm/uCi 7.45E+05 Betacpm/uCi 7.37E+05 Betacpm/uCi 6.74E+05 RadonDecayFactors Sampling Count
Minutes Time Time Decay Decay Minutes Time
Reactor Location DateSampled TimeOn TimeOff sampled Factor Counted Time Factor Counted Factor RadonDecayFactor VBWR FirstFloor 9/9/2021 7:45 8:05 20 1.248782 8:13 8 1.203025 10 1.11997 1.683 VBWR Basement 11/18/2021 8:42 9:02 20 1.248782 9:43 41 2.578741 10 1.11997 3.607 VBWR FuelPool 11/18/2021 8:17 8:37 20 1.248782 8:48 11 1.28937 10 1.11997 1.803 EVESR FirstFloor 9/14/2021 10:11 10:31 20 1.248782 14:08 217 73.51669 10 1.11997 102.820 EVESR Basement 9/14/2021 10:56 11:16 20 1.248782 14:29 193 45.70518 10 1.11997 63.923 EVESR 519'Level 9/14/2021 10:33 10:53 20 1.248782 14:18 205 57.96631 10 1.11997 81.072 GETR FirstFloor 9/9/2021 7:03 7:23 20 1.248782 7:38 15 1.414214 10 1.11997 1.978 GETR Basement 9/9/2021 10:38 10:58 20 1.248782 11:29 31 2.046748 10 1.11997 2.863 GETR ThirdFloor 9/9/2021 10:09 10:29 20 1.248782 11:17 48 3.031433 10 1.11997 4.240
GEHitachiNuclearEnergy
VallecitosNuclearCenter
Sunol,California
GENERALELECTRICTESTREACTOR
(DEACTIVATED)
ANNUALREPORTNO.63
FORTHEYEAR2021
LICENSETR1
DOCKET5070
MARCH2022
GETRAnnualReportNo.63
GeneralElectricTestReactor
(Deactivated)
ANNUALREPORTNO.63
GEHitachi(GEH)hasmaintainedtheGeneralElectricTestReactor(GETR)ina
deactivatedstatusundertheauthorityofAmendmentNo.17toLicenseTR1,Docket
5070,issuedOctober22,2007asspecifiedinTS6.6.1toAmendmentNo.14,issued
February5,1986.Inthisannualreport,asummaryofthestatusofthefacilityforthe
periodofJanuary1,2021toDecember31,2021ispresented.
1.0
SUMMARY
ThefacilityremainsinpredominatelythesameconditiondescribedinAnnualReport
No.62.Entryintothereactorbuildingwasmadeforroutineradiationsurveysanda
generalexaminationofconditionsthroughoutthebuilding.Thecrane,elevator,and
ventilationwereservicedandtestedin2011inanticipationofbeginningremediation
activities.Suchactivitieshavenotbegun.
Structuralconditionsandradiationandcontaminationlevelsremainatacceptable
levels.Environmentaldataismaintainedonsiteandavailableforreview.
2.0STATUSOFFACILITY
Inaccordancewithwrittenprocedures,theFacilityManagercontrolsaccesstothe
containmentbuildingandgeneralsystems.Thefacilitycontinuestobeindeactivated
status.TherewerenochangesauthorizedbytheFacilityManagerpursuantto
10CFR50.59(a)in2021.
3.0ROUTINEPATROLS
Thefacilitywasinspectedweekly,quarterly,andannuallyinaccordancewithwritten
stationprocedures.
Thepresenceofminimalefflorescencewasidentifiedonfacilitybasementwallsduring
theannualinspection.Thisconditionwasevaluatedanddeterminedtonotposea
structuralissue.
Thestructuralconditionofthefacilityremainsactivelymonitored,stableand
structurallysoundtoensuremaximumprotectionforpublichealthandsafety.
4.0RADIATIONANDCONTAMINATION
Completeradiationandcontaminationsurveysofthefacilityindicatethatlevelsremain
low.Resultsofthesurveysarepresentedinattachment1.Airsamplingresultsare
presentedinattachment2.Theradiation/contaminationlevelslistedarerepresentative
Page1of2
GETRAnnualReportNo.63
butnotnecessarilymaximumvalues.
4.1 GETRStack
Althoughmaintenancewasperformedonthestackin2011,andthestackwastested,
therehasbeennoremediationeffortperformedfortheGETRreactor.Theventilation
systemisoperational,butnotcurrentlyinuse.
4.2 GammaRadiation
Theyearlydoseresultsfortheyear2021asdeterminedfromevaluationofsite
perimeterenvironmentalmonitoringdosimetersshowednodeparturefromnormal
stablebackgrounds.
4.3 Vegetation
Noalpha,betaorgammaactivityattributabletoactivitiesattheGETRfacilitywasfound
onorinvegetationinthevicinityofthesite.
4.4 GroundWaterMonitoringWellData
AnalyticalresultsofgroundwatersamplescanbefoundintheannualEnvironmental
ReportsubmittedonMarch9,2022.
5.0ACTIVITIES
Inspectionoftheinstalledgaugesshowednopropagationofconcretecracking.
Therewerenopreventiveorcorrectivemaintenanceactivitiesperformedhavingsafety
significanceduringthereportingperiod.
6.0ORGANIZATION
TheSiteManagerremainsM.J.Feyrer.TheGETRFacilityManagerremainsK.P.
Zanotto.TheManager,RegulatoryComplianceandEHSremainsJ.Smyly.
7.0CONCLUSION
GEHitachiNuclearEnergyconcludesthatthedeactivatedGETRisbeingmaintainedina
safeshutdowncondition.Theinspections,accesscontrol,andadministratively
controlledactivitiesensuremaximumprotectionforthepublichealthandsafety.The
procedureswillbecontinuedtomaintainthishighlevelofprotection.
GEHitachiNuclearEnergy
VallecitosOperations
Digitally signed by Matt Feyrer Matt Feyrer DN: cn=Matt Feyrer gn=Matt Feyrer c=US United States l=US United
States o=Vallecitos Nuclear Center ou=VNC e=matt.feyrer@ge.com Reason: Document Approver Location:
Date: 2022-03-28 05:03-07:00
M.J.Feyrer,ManagerVallecitosNuclearCenter
Page2of2
GETRAnnualSurvey
SurveyNumber: C024
DateSurveyPerformed:July28,2021
DoseRateInstrument: RadEyeS/N33155
InstrumentCalibrationdate:June14,2021
ContaminationSmearscountedon:TennelecXLBSystemA
Calibrationdate:May6,2021
SurveyPerformedby: SignatureonOriginalDocument
SurveyReviewedby: SignatureonOriginalDocument
GEHitachiVallecitosNuclearCenter
RadiologicalCountingLaboratory
ATTACHMENT1(surveydata)
GETRContainmentAnnualSurveyDiskSmearResults-2021
Instrument: TennelecXLBSystemB AnalyzedBy:
SignaturesonOriginal
SerialNo.: 29721 Signature: Documentsonsite
CalibrationDate: 21Mar2021 Reviewed:
BetaEfficiency: 30.36% BetaMDA: 22.6DPM/100cm2
AlphaEfficiency: 33.93% AlphaMDA: 10.6DPM/100cm2
SampleDate: 7/28/2021 CountDate: 7/29/2021
Alpha Beta
No. Location NCPM/100cm DPM/100cm NCPM/100cm2 DPM/100cm2
2 2 0 Blank 0 <MDA 0 <MDA
1 Basement#1 0 <MDA 26.42 87.0
2 Basement#2 0 <MDA 347.42 1140
3 Basement#3 0 <MDA 49.42 163
4 Basement#4 0 <MDA 31.42 103
5 Basement#5 0 <MDA 36.42 120
6 Basement#6 0 <MDA 40.42 133
7 Basement#7 0.93 <MDA 69.42 229
8 Basement#8 0 <MDA 79.42 262
9 Basement#9 0 <MDA 20.42 67.3
10 Basement#10 0 <MDA 175.42 578
11 Basement#11 0.93 <MDA 15.42 50.8
12 Basement#12 0 <MDA 52.42 173
13 Basement#13 0 <MDA 32.42 107
14 Basement#14 0 <MDA 59.42 196
15 Basement#15 0 <MDA 52.42 173
16 Basement#16 0 <MDA 246.42 812
17 Basement#17 0 <MDA 13.42 44.2
18 Basement#18 0 <MDA 145.42 479
19 FirstFloor#1 1.93 <MDA 0 <MDA
20 FirstFloor#2 0 <MDA 0.42 <MDA
21 FirstFloor#3 0 <MDA 6.42 <MDA
22 FirstFloor#4 0 <MDA 7.42 24.4
23 FirstFloor#5 0 <MDA 17.42 57.4
24 FirstFloor#6 0 <MDA 4.42 <MDA
25 FirstFloor#7 0 <MDA 2.42 <MDA
Page1of3
GEHitachiVallecitosNuclearCenter
RadiologicalCountingLaboratory
Alpha Beta
No. Location NCPM/100cm DPM/100cm NCPM/100cm2 DPM/100cm2
2 2 26 FirstFloor#8 0 <MDA 19.42 64.0
27 FirstFloor#9 0 <MDA 45.42 150
28 FirstFloor#10 0 <MDA 41.42 136
29 FirstFloor#11 0 <MDA 131.42 433
30 FirstFloor#12 0 <MDA 341.42 1120
31 SecondFloor#1 0.93 <MDA 17.42 57.4
32 SecondFloor#2 0.93 <MDA 19.42 64.0
33 SecondFloor#3 0 <MDA 16.42 54.1
34 SecondFloor#4 0 <MDA 24.42 80.4
35 SecondFloor#5 0 <MDA 65.42 215
36 SecondFloor#6 0.93 <MDA 20.42 67.3
37 SecondFloor#7 0 <MDA 17.42 57.4
38 SecondFloor#8 0 <MDA 21.42 70.6
39 SecondFloor#9 0 <MDA 1.42 <MDA
40 SecondFloor#10 0 <MDA 26.42 87.0
41 SecondFloor#11 0 <MDA 184.42 607
42 SecondFloor#12 0 <MDA 26.42 87.0
43 Mezzanine#1 0 <MDA 8.42 27.7
44 Mezzanine#2 0 <MDA 9.42 31.0
45 Mezzanine#3 0 <MDA 11.42 37.6
46 Mezzanine#4 0.93 <MDA 14.42 47.5
47 Mezzanine#5 0.93 <MDA 54.42 179
48 Mezzanine#6 0 <MDA 16.42 54.1
49 ThirdFloor#1 0 <MDA 42.42 140
50 ThirdFloor#2 0 <MDA 67.42 222
51 ThirdFloor#3 0 <MDA 212.42 700
52 ThirdFloor#4 0 <MDA 90.42 298
53 ThirdFloor#5 0.93 <MDA 126.42 416
54 ThirdFloor#6 0.93 <MDA 181.42 598
55 ThirdFloor#7 0.93 <MDA 851.42 2800
56 ThirdFloor#8 0 <MDA 223.42 736
57 ThirdFloor#9 1.93 <MDA 165.42 545
58 ThirdFloor#10 0 <MDA 730.42 2410
59 ThirdFloor#11 0 <MDA 609.42 2010
60 ThirdFloor#12 3.93 11.6 1661.42 5470
61 ThirdFloor#13 1.93 <MDA 64.42 212
62 ThirdFloor#14 0.93 <MDA 64.42 212
Page2of3
GEHitachiVallecitosNuclearCenter
RadiologicalCountingLaboratory
Alpha Beta
No. Location NCPM/100cm DPM/100cm NCPM/100cm2 DPM/100cm2
2 2 63 ThirdFloor#15 0 <MDA 2721.42 8960
64 ThirdFloor#16 0 <MDA 926.42 3050
65 ThirdFloor#17 0 <MDA 164.42 542
66 ThirdFloor#18 1.93 <MDA 437.42 1440
67 ThirdFloor#19 0 <MDA 705.42 2320
Page3of3
ATTACHMENT2:AirSampleRadonCalculationsforVallecitosReactorAnnualInspection2020 Initial AtSamplingTime Sample Alpha Beta Alpha Beta Reactor Location Sys. Volume(ml) ncpm uCi/ml ncpm uCi/ml ncpm uCi/ml ncpm uCi/ml VBWR FirstFloor B 2.83E+06 1308.63 6.20E10 3573.92 1.87E09 2201.833 1.04E09 6013.292 3.15E09 Basement B 2.83E+06 845.13 4.00E10 2048.72 1.07E09 3048.063 1.44E09 7388.956 3.87E09 FuelPool B 2.83E+06 1505.33 7.13E10 3970.82 2.08E09 2714.577 1.29E09 7160.621 3.75E09 EVESR FirstFloor B 2.83E+06 86.83 4.11E11 183.62 9.62E11 8927.885 4.23E09 18879.86 9.89E09 Basement B 2.83E+06 305.63 1.45E10 686.42 3.60E10 19536.83 9.26E09 43878.13 2.30E08 519'Level B 2.83E+06 244.53 1.16E10 572.32 3.00E10 19824.43 9.39E09 46398.87 2.43E08 GETR FirstFloor B 2.83E+06 1042.83 4.94E10 2731.22 1.43E09 2062.63 9.77E10 5402.123 2.83E09 Basement B 2.83E+06 2012.63 9.54E10 5080.82 2.66E09 5761.308 3.00E+00 14544.24 7.62E09 ThirdFloor B 2.83E+06 631.63 2.99E10 1470.82 7.71E10 2677.957 1.27E09 6235.917 3.27E09 TennelecSystem"A"Efficiency&ConversionFactors TennelecSystem"B"Efficiency&ConversionFactors AlphaEfficiency 36.00% AlphaEfficiency 33.57%
BetaEfficiency 33.19% BetaEfficiency 30.36%
dpm/uCi 2.22E+06 dpm/uCi 2.22E+06 Alphacpm/uCi 7.99E+05 Alphacpm/uCi 7.45E+05 Betacpm/uCi 7.37E+05 Betacpm/uCi 6.74E+05 RadonDecayFactors Sampling Count
Minutes Time Time Decay Decay Minutes Time
Reactor Location DateSampled TimeOn TimeOff sampled Factor Counted Time Factor Counted Factor RadonDecayFactor VBWR FirstFloor 9/9/2021 7:45 8:05 20 1.248782 8:13 8 1.203025 10 1.11997 1.683 VBWR Basement 11/18/2021 8:42 9:02 20 1.248782 9:43 41 2.578741 10 1.11997 3.607 VBWR FuelPool 11/18/2021 8:17 8:37 20 1.248782 8:48 11 1.28937 10 1.11997 1.803 EVESR FirstFloor 9/14/2021 10:11 10:31 20 1.248782 14:08 217 73.51669 10 1.11997 102.820 EVESR Basement 9/14/2021 10:56 11:16 20 1.248782 14:29 193 45.70518 10 1.11997 63.923 EVESR 519'Level 9/14/2021 10:33 10:53 20 1.248782 14:18 205 57.96631 10 1.11997 81.072 GETR FirstFloor 9/9/2021 7:03 7:23 20 1.248782 7:38 15 1.414214 10 1.11997 1.978 GETR Basement 9/9/2021 10:38 10:58 20 1.248782 11:29 31 2.046748 10 1.11997 2.863 GETR ThirdFloor 9/9/2021 10:09 10:29 20 1.248782 11:17 48 3.031433 10 1.11997 4.240