ML17303A426

From kanterella
Revision as of 08:18, 15 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Special Rept 2-SR-87-015:on 870509,containment Area Monitor Channel a Inoperable for Greater than 72 H.Caused by Repairing Single Channel Area Monitor Board.Analysis Begun to Determine Cause of Board Failure on 870506
ML17303A426
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 06/08/1987
From: HAYNES J G
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
192-00226-JGH-T, 192-226-JGH-T, 2-SR-87-015, 2-SR-87-15, NUDOCS 8706150248
Download: ML17303A426 (3)


Text

REGULAT INFORMATION DISTRIBUTION

'STEM (R IDS)ACCESSION NBR:8706250248 DOC.DATE: 87/06/08 NOTARIZED:

NQ.DOCKET FACIL: STN-50-52'7 Palo Verde Nuclear Stations Unit 2.Ari zona Pub li 05000529 AUTH.NAME AUTHOR AFFILIATION

'\.HAYNES'.G.Arizona Nuclear Poeer Pro Ject (formerly Arizona Public Serv RECIP.NAME~RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Special Rept 2-SR-87-015:

on 87050%i containment area monitor Channel A inoperable for greater than 72 h.Caused bg repairing single channel area monitor board.Analysis begun to detemine cause of board failure on 870506.DISTRIBUTION CODE: IE22D COPIES RECEIVED: LTR ENCL SIZE: TITLE: 50.73-Licensee Event Report (LER)i Incident Rpti etc.NOTES: Standard i zed plant.M.Davis'RR: 1 Cg.05000529 RECIPIENT ID CODE/NAME PD5 LA LIC ITRAz E INTERNAL: ACRS MI CHELSON AEOD/DOA AEOD/DBP/TPAB NRR/DEST/ADE NRR/DEST/CEB NRR/DEBT/ICSB NRR/DEST/MTB NRR/DEST/RBB NRR/DLPG/HFB NRR/DOE*/EAB NRR/DREP/RPB NRR/PMAS/PTSB RES DEPY GI EXTERNAL: EGhG GRQHi M LPDR NBIC HARRIS>J NOTES: COP I EB LTTR ENCL 1 1 2 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 f 1 2 2 1 1 1 5 5 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD DAVIS'ACRS MOELLER AEOD/DBP/ROAB DEDRO NRR/DEBT/ADS NRR/DEBT/ELB NRR/DEST/MEB NRR/DEBT/PSB NRR/DEST/SGB NRR/DLPG/GAB NRR/DREP/RAB AS/ILRB FG 02 RGN5 FILE 01 H BT LOBBY WARD NRC PDR NSIC MAYSi G COPIES LTTR ENCL'1 1 2 2 2 2 1 1 2 0 1 1 1 1 2 1 1 1 1 1 1 1 f 1 f 1 f 1 TOTAL NUMBER OF CQP IES REQUIRED: LTTR 44 ENCL 42 Arizona Nuclear Power Project P.o, BOX 52034~PHOENIX, ARIZONA 85072-2034 192-00226-JGH-TRB/JEM June 8, 1987 Document Control Desk U.S.Nuclear Regulatory Commission Washington, D.C.20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)Unit 2 Docket No.STN 50-529 (License NPF-51)Special Report 2-SR-87-015 File: 87-020-404

Dear Sirs:

Attached please, find a Special Report 2-SR-87-015 prepared and submitted pursuant to Technical Specifications 3.3.3.1 and 6.9.2 This report discusses a Radiation Monitor inoperable for greater than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.If you have any questions, please contact T.R.Bradish, Compliance Supervisor at (602)932-5300, Ext.6936.Very trul yours,'Jg Vice President Nuclear Production JGH/TRB/JEM/cld Attachment cc: 0.M.DeMichele (all w/a)E.E.Van Brunt, Jr.J.B.Martin R.P.Zimmerman R.C.Sorenson E.A.Licitra A.C.Gehr INFO Records Center 8706150248 870608 PDR ADOCK 05000529 8 PDR PALO VERDE NUCLEAR GENERATING STATION Radiation Monitoring Unit Inoperable for Greater Than 72 Hours License No.NPF-51 Docket No.STN 50-529 Special Report No.2-SR-87-015 This Special Report is being submitted pursuant to Technical Specification 3.3.3.1 ACTION 27 and Technical Specification 6.9.2 to report an event in which RU-148 (Containment Area Monitor Channel A)was inoperable for greater than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> limit for operability was exceeded at approximately 0045 MST on May 9, 1987.Pursuant to Technical Specification 3.3.3.1 ACTION 27 the Preplanned Alternate program to monitor the appropriate parameters was initiated.

At approximately 0045 MST on May 6, 1987, Palo Verde Unit 2 was in Mode 1 (POWER OPERATION) when RU-148 was declared inoperable in order to perform surveillance test 36ST-9SQ08 (Radiation Monitoring Calibration Test For New Scope Area Monitors).

During the performance of 36ST-9SQ08 the monitor stopped operating.

Troubleshooting and repair in accordance with an approved work control document found that the communication portion of the Single Channel Area Monitor (SCAM)board was not communicating with the Remote Indicator Controller (RIC).The SCAM board was replaced and the monitor was calibrated and functionally tested in accordance with 36ST-9SQ08.

A root cause analysis has been initiated to determine the cause of failure of the board.After satisfactory completion of 36ST-9SQ08, RU-148 was declared operable at 1015 MST on May 14, 1987.The monitor was inoperable for 8 days and 9.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.