ML18016A620

From kanterella
Revision as of 03:53, 11 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1998 for Harris Nuclear Power Plant.With 981012 Ltr
ML18016A620
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/30/1998
From: ROGERS S, VANDENBURGH C
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-98-148, NUDOCS 9810160203
Download: ML18016A620 (9)


Text

CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME, AUTHOR AFFILIATION ROGERS,S.Carolina Power&Light Co.VANDENBURGH,C.

Carolina Power S Light Co.RECIP.NAME

, RECIPIENT AFFILIATION DOCKET 05000400

SUBJECT:

Monthly operating rept for Sept 1998 for Harris Nuclear Power Plan.1t tr.DISTRIBUTION CODE: IE24D COPIES RECEIITED:

LTR I ENCL i SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:Application for permit renewal filed.05000408 RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: R IJE C ER RGN2 COPIES LTTR ENCL 1'1 1 1 1 1 1 RECIPIENT ID CODE/NAME FLANDERS,S AEOD/SPD/RRAB OC/DBA/PAD COPIES LTTR ENCL 1 1 1 1 1 1 EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 D E N NOTE TO ALL ERIDSN RECIPIENTS PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 I'

Carolina Power&Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 OCT 12 1998 United States Nuclear Regulatory Commission ATTENTION:

Document Control Desk Washington, DC 20555 Serial: HNP-98-148 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICEt rSE NO.NPF-63 MONTHLY OPERATING REPORT,

Dear Sir or Madam:

In accordance with Carolina Power B'c Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of September 1998 is provided.Sincerely, C.A.VanDenburgh Manager Regulatory Affairs Harris Plant SGR Enclosure c: Mr.J.B.Brady-NRC Senior Resident Inspector Mr.S.C.Flanders-NRC Project Manager Mr.L.A.Reyes-NRC Regional Administrator

~8<otaQaoS V809SQ PDR ADOCK 05000400, R PDR'tate Road 1134 New Hill NC Enclosure to Serial HNP-98-148 Sheet 1 of 3 CP&L CO.RUN DATE 10/05/98 RUN TIME 12:44:00 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1 RPD36-000 OPERATING STATUS DOCKET NO.050-400 COMPLETED BY SHEXLA ROGERS TELEPHONE (919)362-2573 1.UNIT NAME: HARRIS UNIT 1 2.REPORTING PERIOD: SEPTEMBER 98 3.LICENSED THERMAL POWER (MWT): 2775 4.NAMEPLATE RATING (GROSS MWE): 950.9 5.DESIGN ELECTRICAL RATING (NET MWE): 900.0 6.MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.MAX DEPENDABLE CAPACITY (NET MWE): 860.0 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): 10.REASONS FOR RESTRICTION IF ANY: THIS MONTH YR TO DATE CUMUL ATXVE 11.HOURS IN REPORTING PERIOD 12.NUMBER OF HOURS REACTOR CRITICAL 13.REACTOR RESERVE SHUTDOWN HRS 14.HOURS GENERATOR ON LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEN.(MWH)17.GROSS ELEC.ENERGY GEN (MWH)18.NET ELEC.ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.UNIT CAP.FACTOR (USXNG MDC NET)22.UNIT CAP.FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHED.OVER NEXT 6 MONTHS 720.00 720.00.00 720.00.00 1956101.94 640567.00 600833.00 100.00 100.00 97.03 92.72.00 (TYPE, DATE, AND 100080.00 84860.71.00 84044.54.00 225841599.00 75147651.00 70127841.00 83.98 83.98 81.48 77.86 3.14 6551.00 6551.00.00 6551.00.00 18006821.82 5965847.00 5602536.00 100.00 100.00 99.44 95.02.00 DURATION OF EACH): Plant Refueling Outage number 8 is planned to begin October 24, 1998 and is scheduled for a duration of 34 days.25.IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 26.UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATXON 1.16-9

Enclosure to Serial: HNP-98-148 Sheet 2 of 3 CP&L CO.PLANT PERFORMANCE DATA SYSTEM RUN DATE 10/05/98 APPENDIX B-AVERAGE DAILY POWER LEVEL RUN TIME 12:43:59 HARRIS UNIT 1 PAGE 1 RPD39-000 SEPTEMBER 1998 DAY AVG.DAILY POWER LEVEL (MWE-NET)DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 DAY AVG.DAILY POWER LEVEL (MWE-NET)10 12 13 15 16 849 852 851 851 850 847 833 781 771 762 734 713 831 851 17 18 19 20 21 22 23 25 26 27 28 29 30 851 850 852 853 851 847 861 869 862 855 854 845 853 854 0 s C e UNIT NAME: Harris DATE: 09/30/98 COMPLETED BY: S.G.Rogers TELEPHONE:

(919)362-2573 REPORT MONTH: September 1998 UNIT SHUTDOWNS AND POPOVER REDUCTION Enclosure to'erial: HNP-98-14(m Sheet 3 of 3 NUMBER DATE TYPE I DURATION (HOURS)REASON 2 METHOD OF SHUTTING DOWN REACTOR 3 LICENSEE EVENT REPORT/I SYSTEM CODE4 COMPONENT CODE 5 CAUSE AND CORRECTIVE ACTION TO PREVENTRECURRENCE 98403 09/10/98 0.0 N/A HH PUMPXX Power reduced to 90%on 9/10/98 Q 03:40 due to IA Heater Drain Pump trip.IVork was performed on Feedtvater

)1eater level control columns and plant was returned to 100%power on 9/15/98 tm 10:00.I F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Explain)8-Maintenance or Test C-Rcfucling D-Regulatory Restriction E-Operator Training tr: License Examination F-Administrative G43perational Error (Explain)H-Other (Explain)3 Method: I-Manual 2-Manual Scram 3-Automatic Scram 4.Continued 5-Reduced Load 6%ther 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161) 5 Exhibit I-Same Source 0 (o~'"4'I k'A p~~'\