ML18011A234

From kanterella
Revision as of 01:12, 10 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1993 for Shearon Harris Nuclear Power Plant Unit 1.W/931115 Ltr
ML18011A234
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/31/1993
From: CRENSHAW A, ROBINSON W R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-931043, NUDOCS 9311180282
Download: ML18011A234 (6)


Text

ACCELERATE DOCUMENT DIST ATION SYSTEM REGULAT INFORMATION DISTRIBUTION STEM (RIDS)ACCESSION NBR,9311180282 DOC.DATE:~~1-NOTARIZED:

NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION CRENSHAW,A.

Carolina Power 6 Light Co.ROBINSON,W.R.

Carolina Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400 R

SUBJECT:

Monthly operating rept for Oc for Shearon Harris Nuclear Power Plant Unit 931115 tr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:Application for permit renewal filed.05000400 D RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB RGN2 EXTERNAL: EGGG BRYCE,J.H NSIC COPIES LTTR ENCL 3 3 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA ORS/OEAB EG FIL 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D D D D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.504-2065)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!D TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24 Carolina Power&Light Company P.O.Box 165 New Hill, NC 27562 NOV f 5 199$File: HO-931043 Serial HNP-93-861 United States Nuclear Regulatory Commission Attention:

Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 MONTHLY OPERATIONS REPORT Gentlemen:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.1, Carolina Power&Light Company herewith submits the report of operation statistics and shutdown experience for the month of October 1993.Very truly yours, W.R.Robinson General Manager Harris Nuclear Plant APC:dmw Attachments c: Mr.S.D.Ebneter (NRC-RII)Mr.N.B.Le (NRR)Mr.J.E.Tedrow (NRC-SHNPP) j.9g 003.-HIS jHTH OPR PPTll.lAcI 5'3iii80282,93i03i"':

'DR ADOCK'05000400

'PDR

)>I~'4 4 p DOCKET NO.: 050-400 UNIT: Harris Unit 1 DATE: October 1993 COMPLETED BY: Amanda Crenshaw OPERATIONS

SUMMARY

Harris Unit 1 operated at 100 percent Availability Factor for the referenced month and a 101.69 percent Capacity Factor.There were no significant power reductions.

There are 157 fuel assemblies in the reactor vessel and 1099 spent fuel assemblies stored in the spent fuel pools.651 of the spent fuel assemblies are BWR, which were shipped to Harris from CPSL's Brunswick Plant.224 of the spent fuel assemblies are from CP&L's Robinson Plant.HIS/HTH-OPR.RPT/2/OS4 CPbL CO RUt<DATE 31/08/93 RiJN.'TIME 10:55:1 8 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT f PAGE RPD36-000 OPERATING STATUS DOCKET NO.050-400 COMPLETED BY AMAHDA CRENSHAW TELEPHONE (939)362"2808, 2 3~5.6.7 4 8.UNIT NAME: HARRIS UNIT 3 NOTES REPORTIHG PERIOD: OCTOBER 93 I See Operations Summary.LICENSED THERMAL POWER (MWT): 2775 I NAMEPLATE RATING (GROSS MWE>: 950.9 I DESIGN ELECTRICAL RATING (NET MWE): 900.0 MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 MAX DEPEHDABLE CAPACITY (NET MWE): 860.0 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)SINCE LAST REPORT, GIVE REASONS: None.1 9.10.POWER LEVEL TO WHICH RESTRICTED IF AHY (NET MWE): None.REASONS FOR RESTRICTION IF ANY: N/A.THIS MONTH YR TO DATE CUMUL ATIVE HOURS IN REPORTING PERIOD 745.00 5 2.NUMBER OF HOURS REACTOR CRITICAL 745.80 13.REACTOR RESERVE SHUTDOWN HRS.00 3 4.HOURS GENERATOR OH LINE 745.00$5.UNIT RESERVE SHUTDOWN HOURS.00 36.GROSS THERMAL ENERGY GEN.(MWH)2064886.38 f7.GROSS ELEC.ENERGY'EM.(MWH)692733.OC$8.NET.ELEC.ENERGY GENERATED (MWH>653556.00 1 9.UNIT SERVICE FACTOR 100.00 20.UNIT AVAILABILITY FACTOR 300.00 21.UNIT CAP.FACTOR (USING MDC NET)101~69.22.UNIT CAP.FACTOR (USING DER HET)97.37 23.UNIT FORCED OUTAGE RATE.00 24.SHUTDOWNS SCHED.OVER NEXT 6 MONTHS (TYPE DATE Unit scheduled for shutdown on March 5, 199/I for 7296.00 57001.00 7269.4$46838.31.00.00 7257.45 46313.63.00~.00 19915491.24

<23266596.68 667$4M.OP 4f088267;GP 6264443.00 38270119.00 99.47 8f.25 99.47 81.25 99.84~'78.07 95.40'4.60

.00 3.44 At<D DURATION OF EACH): Refueling'Outage Number 5.25.26.IF SHUTDOWN AT EHD OF REPORT PERIOD, ESTIMATED DATE OF START UP: UNITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED IHIJIQL CRITICALITY INITIAL ELECTRICITY COMMERCI'AL OPERATION'i."i6-9 HIS/HTH-OPR.RPT/3/OS%

4'CPhL CO PLANT PERFORMANCE DATA SYSTEM RUN DATE<f/08/93 APPEtggg B-AVERAGE DAILY POWER LEVE RUN"TIME fe:55:$8%F HARRIS UNIT 1 PAGE RPD39-000 DOCKET NO.050-400 COMPLETED BY AMANDA CRENSHAW TELEPHONE (919)362-2808 OCTOBER DAY AVG.DAILY POWER LEVEL (MWE-NET)882 877 875 DAY AVG.DAILY POWER'LEVEL (MWE-NET)872 87$867 6 10 874 874 877 874 87<866 873 r'83 20 22 23 25 864 865 882.870 874 875 873 874 878 877 875 875 30 880 877 881.1.16-8 MIS/HTH-OPR.

RPT/4/OS 4