Monthly Operating Rept for Nov 1995 for Shearon Harris Nuclear Power Plant.W/951213 Ltr
ML18011B082
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/30/1995
From: BOULWAARE L, DONAHUE J W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-95-118, NUDOCS 9512180220
Download: ML18011B082 (9)


Text

P, ge pi'i P R.IC3R.I"PY'CCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSXON NBR:9512180220 DOC.DATE: 9~~NOTARIZED:

NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION BOULWAARE,L.

Carolina Power&Light Co.DONAHUE,J.W.

Carolina Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept ov 1995 for Shearon Harris Nuclear Power Plant.W/51213 ltr.DISTRIBUTION CODE: IE24D COPXES RECEIVED:LTR ENCL SXZE: TXTLE: Monthly Operating Report (per Tech Specs)DOCKET I 05000400 P R NOTES:Application for permit renewal filed.o5ooo4oo R RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACR LE CENT Ol EXTERNAL LI TCO BRYCE g J H NRC PDR COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME LE,N AEOD/SPD/RRAB NRR/DRPM/PECB.

NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D C U N Y'OTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE 6'%STE!COYTACT I'HE DOCL'%!EYT CO4'TROL DESK.ROObl Pl-37 (EXT.5N-20S3)TO FLINII.'PATE YOUR X'Al!L FROXI DIS I'RIBUTIOY LISTS I'OR DOCL'NIEX'I'S YOl.'Oi"I YI.'I'.D!TOTAL NUMBER OF COPXES REQUIRED: LTTR 19 ENCL 19

~g I 4 C~IPSE Carolina Power&Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 DEC 1 5 1995 United States Nuclear Regulatory Commission ATTENTION:

Document Control Desk Washington, DC 20555 SERIAL: HNP-95-118 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 MONTHLY OPERATING REPORT Gentlemen:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Plant, Carolina Power&Light Company herewith submits the report of operating statistics and shutdown experience for the month of November 1995.Sincerely, J.W.Donahue General Manager Harris Nuclear Plant LDB Enclosure c: Mr.S.D.Ebneter Mr.N.B.Le Mr.D.J.Roberts 95i2i80220 rst5ii30 PDR ADOCK 05000400 PDR~l State Road 1134 New Hill NC Enclosure to SeriaL HNP-095-118 Page 1 of 4 CPBL CO.RUN DATE 12/05/95 RUN TIME 08:30:01 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1 RPD36.000 OPERATING STATUS 1.UNIT NAME: HARRIS UNIT 1 DOCKET NO.050-400 COMPLETED BY LESLIE BOULWAARE TELEPHONE<919)362-2905 I NOTES 2.REPORTIHG PERIOD: NOVEMBER 95 I 3.LICENSED THERMAL POWER (MWT): 2775 4~NAMEPLATE RATING (GROSS MWE): 950.9 5.DESIGN ELECTRICAL RATING (NET MWE): 900.0 I 6.MAX DEPENDABLE CAPACITY (GROSS MWE): 920'J 7.MAX DEPENDABLE CAPACITY (NET MWE): 860~0-8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): 10.REASONS FOR RESTRICTION IF ANY: THIS MONTH YR TO DATE CUMUL AT IVE 11~HOURS IN REPORTING PERIOD 12~NUMBER OF HOURS REACTOR CRITICAL 13'EACTOR RESERVE SHUTDOWN HRS 14.HOURS GENERATOR OH LINE 15'NIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEH.(MWH)17.GROSS ELEC.FNFRGY GEN (MWH)18.NET ELEC.ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.UNIT CAP.FACTOR (USING MDC NET)22.UNIT CAP.FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHED.OVER NEXT 6 MONTHS 720.00 619.80 F 00 605.16 F 00 1609269.12 525735 F 00 488583.00 84'5 84.05 78.91 75.40 15.95 (TYPE, DATE, 75241.00 62236.65.00 61628.33 F 00 164555879.40 54774041.00 51042105.00 81.91 81.91 78.88 75.38 3.19 8016.00 6686.80~00 6654'6 F 00 17740588.32 5850515.00 5451451.00 83.01 83.01 79.08 75.56 5.38 AND DURATION OF EACH>: 25.IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 26.UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16-9 E

Enclosure to Serial HNP-095-118 Page 2 of 4 CPRL CO.RUN DATE 12/05/95 RUN TIME 12:48:48 PLANT PERFORMANCE DATA SYSTEM APPENDIX B-AVERAGE DAILY POHER LEVEL HARRIS UNIT'1 PAGE 1 RPD39-000 DOCKET NO.050-400 COMPLETED BY LESLIE BOULWARE TELEPHONE (919)362-2905 NOVEMBER 1995 DAY AVG.DAILY PONER LEVEL (MNE-NET)DAY AVG.DAILY PONER LEVEL (MNE-NET)10 12 13 14 15 16-34-34 127, 257-35 39 749 766 802 856 854 854 855 855 17 20 21 22 23 24 25 26 27 28 29 30 856 853 851 851 851 855 852 854 855 851 852 856 UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH UNIT NAME: Hanis DATE: 12/06/95 COMPLETED BY: LD.Boulware TELEPHONE:

(919)362-2905 NUMBER 95407 DATE 951021 TYPE DURATION HOURS)59.82 REASON A METHOD OF SHUITING DOWN REACTOR LICENSEE EVENT REPORT/t N/A SYSTEM CODE4 CH COMPONENT CODE 5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE Unit was shutdown manually to repair a leaking fcedwater isolation valve (IFW-217).

Hant returned on-line 11-3-95 I 1149.I F: Forced S: Scheduled 2 Reason: A-Equipmcnt Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction EOperator Training 8t License Examination F-Adnunistrative

&Operational Error (Explain)H~er (Explain)3 Method: I-Manual 2-Manual Scram 3-Automatic Scram%Continued 5-Reduced Load&Other 4 Extubit G-Instructions for Peeparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG4 161)5 Exhibit I-Same Source tn tn X WS 5 e rt n ro r-r rrtu 0 r to C 0 Rtu I w'Lo O UNIT SHUTDOWNS AND POWER REDUCTION REPORT MO~i UNIT NAME: Hams DATE: 12/06/95 COMPLETED BY: LD.Boulware TELEPHONE:

(919)362-2905 95408 DATE 951105 DURATION OURS 55.02 REASON METHOD OF SHUTTING DOWN REACTOR LICENSEE EVENT'YSTEM REPORT¹CODE 4 95411 COMPONENT CODES RELAYX CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE Plant trip0737 duc to a failed circuit on a relay during ESFAS slave relay testing.Relay was replaced and testing completed.

Plant returned on-linc 11-7-951438.I F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C Refueling D-Regulatory Restriction FA)pnator Training tb License Examination F-Administrative G~ionai Error (Explain)Hither (Explain)3 Mcthah I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load&Other 4 Exhbit G-Instructions for reparation of Data Entry Sheets for Lioensee Event Report (LER)File (NUREG4161) 5 Exhil>it I-Same Source Olol X WS P reit n 8 V rrQ 0 ta C 05$I rr wioO a4 o.