ML18012A128

From kanterella
Revision as of 23:49, 9 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards TS Bases Change for TS 3.2.3,which Incorporates Insp Guidance from NRC Procedure 61706, Core Thermal Power Evaluation.
ML18012A128
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/08/1996
From: ROBINSON W R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18012A129 List:
References
HNP-96-014, HNP-96-14, NUDOCS 9602130078
Download: ML18012A128 (3)


Text

CATEGORY j.REGULATOR INFORMATION DISTRIBUTION SFEM (RIDE)ACCESSION NBR:9602130078 DOC.DATE: 96/02/08 NOTARIZED:

NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROBINSON,W.R.

Carolina Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Docume'nt Control Desk)

SUBJECT:

Forwards TS bases change for TS 3.2.3,which incorporates inspection guidance fom NRC procedure 61706,"Core Thermal Power Evaluation." DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:

General Distribution NOTES:Application for permit renewal filed.DOCKET 05000400 05000400 E Q RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT EXTERNAL: NOAC COPIES LTTR ENCL 1 1 1 1 6 6 1 1 1 1 1 1 1 1 FILE CE DRCH/HIC B NRR/DSSA/SRXB OGC/HDS2 NRC PDR RECIPIENT ID CODE/NAME PD2-1 PD COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 0 1 1 D N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL17 Carolina Power&Light Company PO Box 165 New Hill NC 27562 William R.Robinson Vice President Harris Nuclear Plant FEB 8 1996 SERIAL: HNP-96-014 United States Nuclear Regulatory Commission ATTENTION:

Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 TECHNICAL SPECIFICATION BASES CHANGE-RATED THERMAL POWER Gentlemen:

In accordance with 10 CFR 50.36(a), the Harris Nuclear Plant is proposing to implement a change to the Bases section for Technical Specification (TS)3.2.3.The proposed change is submitted in preparation for implementing a continuous calorimetric capability.

This change incorporates the inspection guidance from NRC Inspection Procedure 61706,"Core Thermal Power Evaluation," except that shifts at the Harris Nuclear Plant are 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.The attached retyped Bases pages B 3/4 2-5 and B 3/4 2-6 are provided for your information.

Questions regarding this matter may be referred to Mr.T.D.Walt at (919)362-2711.Sincerely, Enclosure LSR/lsr c: Mr.S.D.Ebneter Mr.N.B.Le Mr.D.J.Roberts i 3CCvg 9602i30078 960208 PDR ADOCK 05000400, P PDR State Road 1134 New Hill NC Tel 919362-2502 Fax 919362.2095 C~)i(4