ML18012A250

From kanterella
Revision as of 23:36, 9 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
LER 96-007-00:on 960425,failed to Perform Tech Spec Surveillance Testing Per Specification 4.7.6.d.3.Caused by Inadequate Procedure Development.Satisfied Differential Pressure Testing requirement.W/960528 Ltr
ML18012A250
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/28/1996
From: CHAPLIN S, DONAHUE J W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-96-089, HNP-96-89, LER-96-007, LER-96-7, NUDOCS 9606030046
Download: ML18012A250 (10)


Text