ML18012A618

From kanterella
Revision as of 21:53, 9 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1997 for Harris Nuclear Plant,Unit 1.W/970415 Ltr
ML18012A618
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/31/1997
From: DONAHUE J W, ROGERS S
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-97-081, HNP-97-81, NUDOCS 9704210142
Download: ML18012A618 (7)


Text

CATEGORY 1 REGULAT ZNFORMATZON DZSTRZBUTZONISTEM (RZDS)FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.Nh."4E a.AUTHOR AFFILIATION ROGERS,S.'arolina Power&Light Co.DONAHUE,J.W.

Carolina Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400

SUBJECT:

Monthly operati or Mar 1997 for Harris Nuclear Plant, Unit 1./970415 lt DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:Application for permit renewal filed..T 05000400 RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS (FTGE CERN EXTERNAL: LITCO BRYCEFJ H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME LE,N AEOD/SPD/RRAB NRR/DRPM/PECB RGN2 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D E N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11 0 g I I Carolina Power R Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 APR)5 f997 United States Nuclear Regulatory Commission ATTENTION:

Document Control Desk Washington, DC 20555 Serial: HNP-97-081 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 MONTHLY OPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power Ec Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of March 1997 is provided.Sincerely, J.W.Donahue Director of Site Operations Harris Plant MV Enclosure Mr.J.B.Brady-NRC Senior Resident Inspector Mr.S.D.Ebneter-NRC Regional Administrator Mr.N.B.Le-NRC Project Manager'st7042i0 i 42 9'7033i.PDR ADQCK 05000400 R'" PDR IIIIjII:1II]II,'1II.tIIIIIIIIIIII State Road 1134 New Hill NC J

Enclosure to Serial HNP-97-081 Sheet l of 2 CP&L CO.RUN DATE 04/04/97 RUN TIME 15:05:32 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1 RPD36-000 OPERATING STATUS DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 1.UNIT NAME: HARRIS UNIT 1)NOTES 2.REPORTING PERIOD: MARCH 97 3.LICENSED THERMAL POWER (MWT): 2775 4.NAMEPLATE RATING (GROSS MWE): 950.9)5.DESIGN ELECTRICAL RATING (NET MWE): 900.0)6.MAX DEPENDABLB CAPACITY (GROSS MWE): 920.0)7.MAX DEPENDABLE CAPACITY (NET MWB): 860.0 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): 10.REASONS FOR RESTRICTION ZF ANY: THIS MONTH YR TO, DATE CUMUL ATIVE 11.HOURS IN REPORTING PERIOD 12.NUMBER OF HOURS REACTOR CRITICAL 13.REACTOR RESERVE SHUTDOWN HRS 14.HOURS GENERATOR ON LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEN.(MWH)17.GROSS ELEC.ENERGY GBN (MWH)18.NET ELEC.ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.UNIT CAP.FACTOR (USING MDC NET)22.UNIT CAP.FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHED.OVER NEXT 6 MONTHS 744.00 744.00.00 744.00.00 2059505.10 691869.00 651701.00 100.00 100.00 101.85 97.33.00 (TYPE, DATE, 86929.00 73391.45.00 72669.42.00 194718053.

70 64828560.00 60468579.00 83.60 83.60 80.88 77.29 3.30 2160.00 2125.34.00 2111.76.00'" 5833720.44 1961308.00 1843840.00 97.77 97.77 99.26 94.85 2.23 AND DURATION OF EACH): Refueling outage is scheduled to begin April 5, 1997 for a duration of 40 days.25.ZF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 26.UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16-9 t rl'1~a II l z~il Enclosure to Serial HNP-97-081 Sheet 2 of 2 CP&L CO.PLANT PERFORMANCE DATA SYSTEM RUN DATE 04/04/97 APPENDIX B-AVERAGE DAILY POWER LEVEL RUN TIME 15:05:32 HARRIS UNIT 1 PAGE 1 RPD39-000 DOCKET NO.050-400 COMPIETED BY SHEILA ROGERS TELEPHONE (919)362-2573 MARCH 1997 DAY AVG.DAILY POWER LEVEL DAY AVG.DAILY POWER LEVEL tMWE-NET)(MWE-NET)868 17 880 866 18 875 874 19 881 883 20 880 874 21 875 878 22 870 884 23 880 879 881 879 25 875 10 873 26 869 876 27 878 12 881 28 875 13 878 29 861 14 870 30 869 15 881 31 875 16 884