Monthly Operating Rept for Apr 1997 for Shearon Harris Nuclear Power Plant.W/970514 Ltr
ML18012A782
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/30/1997
From: ROBINSON W R, ROGERS S
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-97-107, NUDOCS 9705220261
Download: ML18012A782 (9)


Text

CATEGORY 1 REGULRTC@INPORMATION DISTRIBUTION

%STEM (RIDE)FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION ROGERS,'S.

Carolina Power&Light Co.ROBINSON,W.R.

Carolina Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400

SUBJECT:

Monthly operating rept r 1997 for Shearon Harris Nuclear Power Plant.970514 1 r.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR 1 ENCL!SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:Application for permit renewal filed.05000400 E RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: Ol OC/DBA PAD EXTERNAL: LITCO BRYCEIJ H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME ROONEYPV AEOD/SPD/RRAB

.NRR/DRPM/PECB RGN2 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESKI ROOM OWFN 5D-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL.1'1 1 , CP?QE Carolina Power&Light Company PO Box 165 New Hill NC 27562 William R.Robinson Vice President Harris NUclear Plant MAY 1 4>997 United States Nuclear Regulatory Commission ATTENTION:

Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50400/LICENSE NO.NPF-63 MONTHLY OPERATING REPORT Serial: HNP-97-107

Dear Sir or Madam:

In accordance with Carolina Power 8c Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of April 1997 is provided.Sincerely, MV Enclosure Mr.J.B.Brady-NRC Senior Resident Inspector Mr.L.A.Reyes-NRC Regional Administrator Mr.N.B.Le-NRC Project Manager 97052202bl 970430 PDR ADQCK 05000400 R PDR'IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII State Road 1134 New Hill NC Tel 919362-2502 Fax 919362-2095 United States Nuclear Regu atory Commission HNP-97-107

/Page 2 bc: Mr.T.C.Bell Mr.B.H.Clark Mr.G.W.Davis Ms.S.F.Flynn Mr.W.J.Hindman Ms.W.C.Langston (PE&RAS File)Mr.R.D.Martin Mr.W.S.Orser Mr.W.R.Robinson Mr.W.G.Wendland Nuclear Records File: HI/A-2D Enclosure to Serial HNP-97-107 Sheet 1 of 4 CP&L CO.RUN DATE 05/05/97 RUN TIME 19:04:56 DOCKET NO.050"400 COMPLETED BY: SHEILA ROGERS TELEPHONE (919)362-2573 OPERATING STATUS PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRXS UNIT 1 PAGE 1 RPD36-000 1.UNIT NAME: HARRIS UNIT 1 2.REPORTING PERIOD: APRIL 97 3.LICENSED THERMAL POWER (MWT): 2775 4.NAMEPLATE RATING (GROSS MWE): 950.9 5.DESIGN ELECTRICAL RATING (NET MWE): 900.0 6.MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.MAX DEPENDABLE CAPACITY (NET MWE): 860.0 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): 10.REASONS FOR RESTRICTION IF ANY: THIS MONTH YR TO DATE CUMUL ATIVE 11.HOURS IN REPORTING PERIOD 12.NUMBER OF HOURS REACTOR CRITICAL 13.REACTOR RESERVE SHUTDOWN HRS 14.HOURS GENERATOR ON LXNE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEN.(MWH)17.GROSS ELEC.ENERGY GEN (MWH)18.NET ELEC.ENERGY GENERATED (MWH)19.UNXT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.UNIT CAP.FACTOR (USING MDC NET)22.UNIT CAP.FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHED.OVER NEXT 6 MONTHS 719.00 98.45.00 98.37.00 266067.00 89258.00 75947.00 13.68 13.68 12.28 11.74.00 (TYPE, DATE, 87648.00 73489.90.00 72767.79.00 194984120.70 64917818.00 60544526.00 83.02 83.02 80.32 76.75 3.29 2879.00 2223.79.00 2210.13.00 6099787.44 2050566.00 1919787.00 76.77 76.77 77.54 74.09 2.14 AND DURATION OF EACH): Unit started Refueling Outage 7 on 4/5/97, with an estimated duration of 40 days.25.IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: May 29, 1997 26.UNITS XN TEST STATUS (PRXOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16-9 Enclosure to Serial: HNP-97-107 Sheet 2 of 4 CP&L CO.PLANT PERFORMANCE DATA SYSTEM RUN DATE 05/05/97 APPENDIX B-AVERAGE DAILY POWER LEVEL RUN TIME 19:04:56 HARRIS UNIT 1 PAGE 1 RPD39-000 APRIL 1997 DAY AVG.DAILY POWER LEVEL (MWE-NET)875 878 878 DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 DAY AVG.DAILY POWER LEVEL (MWE-NET)17 18 19 850-17-30-26 20 21 22 23-12 10 12 13 15 16"15-10-10-12-12-12 25 26 27 28 29 30 0'I Enclosure to Serial: HNP-97-107

~,Sheet 3of<UNIT NAME: Harris DATE: 03/05/97 COMPLETED BY: S.G.Rogers TELEPHONE:

(919)362-2573 REPORT MONTH UNIT SHUTDOWNS AND POWER REDUCTION NUMBER DATE TYPE I DURATION (HOURS)REASON 2 METHOD OF SHU1TING DOWN REACTOR 3 LICENSEE EVENT REPORT g SYSTEM CODE 4 COMPONENT CODE 5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 97-002 970404 0.0 N/A Unit commenced turbine load reduction at 2223 on 4/4/97 in preparation for refueling outage 7.I F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Explain)8-Maintenance or Test C-Refueling D-Regulatory Restriction E&perator Training&License Examination F-Administrative G-Operational Error (Explain)Hither (Explain)3 Method: I-Manual 2-Manual Scram 3-Automatic Scram 4<ontinued 5-Reduced Load 643thcr 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG4)161) 5 Exhibit I-Same Source

/II P J~~i t UNIT SHUTDOWNS AND POWER REDUCTION r Enclosure<o, Serial: HNP-97-107.,Sheet 4 of@UNIT NAME: Hams DATE: 03/05/97 COMPLETED BY: S.G.Rogers TELEPHONE:

(919)362-2573 REPORT MONTH NUMBER DATE TYPE I DURATION (HOURS)REASON 2 METHOD OF SHUITING DOWN REACTOR 3 LICENSEE EVENT REPORT II SYSTEM CODE4 COMPONENT CODE 5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 97403 970405 620.63 N/A ZZZZZZ Unit shutdown and taken olf-line at 0222 on 4/5/97 for refueling outage 7.I F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)Hither (Explain)3 Method: I-Manual 2-Manual Scram 3-Automatic Scram 4Mntinued 5-Reduced Load 6-Other 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG4161) 5 Exhibit I-Same Source