ML18016A449

From kanterella
Revision as of 22:02, 9 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
LER 98-006-00:on 980508,failure to Perform Insp & Preventive Maint on MCCB as Required by TS Was Noted.Caused by Inadequate Sps.Tested 9 Pressurizer Heater Bank Breakers by Cycling each.W/980608 Ltr
ML18016A449
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/08/1998
From: DONAHUE J W, VERRILLI M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-98-084, HNP-98-84, LER-98-006, LER-98-6, NUDOCS 9806120025
Download: ML18016A449 (5)


Text