ML18016A739

From kanterella
Revision as of 20:49, 9 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 1 to Shnpp Cycle 9 Colr.Rev 1 Revises Movable Incore Detection Sys Operability Requirements to Specify That at Least 44 Detector Thimbles Are Required at Beginning of Fuel Cycle
ML18016A739
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/25/1998
From: SCAROLA J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18016A740 List:
References
HNP-98-179, NUDOCS 9812040045
Download: ML18016A739 (3)


Text

CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9812040045 DOC.DATE: 98/11/25 NOTARIZED:

NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME ,, AUTHOR AFFILIATION SCAROLA,J; Carolina Power 8 Light Co.RECIP.NAME RECIPIENT AFFILIATION

'ecords Management Branch (Document Control Desk)

SUBJECT:

Forwards rev 1 to SHNPP Cycle 9 COLR.DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:

General Distribution NOTES:Application for permit renewal filed.DOCKET I 05000400 05000400 RECIPIENT ID CODE/NAME PD2-1 LA'FLANDERS, S COPIES LTTR ENCL 1 1 1 1 RECIPIENT ID CODE/NAME PD2-1 PD COPIES LTTR ENCL 1 1 INTERNAL: ACRS NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS2 1 1 1 1 1 1 1 1 1 0 FILE CENTER NRR DE EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT 1 1, 1 1 1 1 1 1 EXTERNAL: NOAC NRC PDR D N T NOTE TO ALL MRZDSM RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13 y+

Carolina Power&Ught Company PO Box 165 New Hill NC 27562 James Scarola Vice President Harris Nuclear Plant NOV 25 1998 SERIAL: HNP-98-179 United States Nuclear Regulatory Commission ATTENTION:

Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 CYCLE 9 CORE OPERATING LIMITS REPORT-REVISION 1

Dear Sir or Madam:

In accordance with Technical Specifications (TS)6.9.1.6.4, Carolina Power Ec Light Company (CPAL)hereby submits a mid-cycle revision to the Harris Nuclear Plant (HNP)Cycle 9 Core Operating Limits Report (COLR).Revision 1 to the COLR revises the Movable Incore Detection System operability requirements to specify that at least 44 detector thimbles are required at the beginning of a fuel cycle.This change provides assurance that a potential misloaded core would either be detected or accommodated without fuel failure.Please refer any questions regarding this submittal to Mr.J.H.Eads at (919)362-2646.Sincerely, MSE/mse Attachment c: Mr.J.B.Brady, NRC Sr.Resident Inspector Mr.S.C.Flanders, NRC Project Manager Mr.L.A.Reyes, NRC Regional Administrator 9812040045 98il25 PDR ADOCK 05000400 Pr"'DR v 5413 Shearon Harris Road New Hill, NC Tel 919 362-2502 Fax 919 362-2095 ATTACHMENT TO HNP-98-179 HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 CYCLE 9 REVISION 1 CORE OPERATING LIMITS REPORT Attachment 9 to HNP Procedure PLP-106,"Technical Specification Equipment List Program and Core Operating Limits Report," Rev.20