ML18016A739

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to Shnpp Cycle 9 Colr.Rev 1 Revises Movable Incore Detection Sys Operability Requirements to Specify That at Least 44 Detector Thimbles Are Required at Beginning of Fuel Cycle
ML18016A739
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/25/1998
From: Scarola J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18016A740 List:
References
HNP-98-179, NUDOCS 9812040045
Download: ML18016A739 (3)


Text

CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9812040045 DOC.DATE: 98/11/25 NOTARIZED: NO DOCKET I FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME ,, AUTHOR AFFILIATION SCAROLA,J; Carolina Power 8 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

'ecords Management Branch (Document Control Desk)

SUBJECT:

Forwards rev 1 to SHNPP Cycle 9 COLR.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES:Application for permit renewal filed. 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 1

'FLANDERS, S 1 1 INTERNAL: ACRS 1 1 FILE CENTER 1 1, NRR/DE/ECGB/A 1 1 NRR DE EMCB 1 1 NRR/DRCH/HICB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS2 1 0 EXTERNAL: NOAC NRC PDR D

N T

NOTE TO ALL MRZDSM RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13 y+

Carolina Power & Ught Company James Scarola PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant SERIAL: HNP-98-179 NOV 25 1998 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 CYCLE 9 CORE OPERATING LIMITS REPORT - REVISION 1

Dear Sir or Madam:

In accordance with Technical Specifications (TS) 6.9.1.6.4, Carolina Power Ec Light Company (CPAL) hereby submits a mid-cycle revision to the Harris Nuclear Plant (HNP) Cycle 9 Core Operating Limits Report (COLR).

Revision 1 to the COLR revises the Movable Incore Detection System operability requirements to specify that at least 44 detector thimbles are required at the beginning of a fuel cycle. This change provides assurance that a potential misloaded core would either be detected or accommodated without fuel failure.

Please refer any questions regarding this submittal to Mr. J. H. Eads at (919) 362-2646.

Sincerely, MSE/mse Attachment c: Mr. J. B. Brady, NRC Sr. Resident Inspector Mr. S. C. Flanders, NRC Project Manager Mr. L. A. Reyes, NRC Regional Administrator PDR Pr "'DR 9812040045 v

ADOCK 98il25 05000400 5413 Shearon Harris Road New Hill, NC Tel 919 362-2502 Fax 919 362-2095

ATTACHMENTTO HNP-98-179 HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 CYCLE 9 REVISION 1 CORE OPERATING LIMITS REPORT Attachment 9 to HNP Procedure PLP-106, "Technical Specification Equipment List Program and Core Operating Limits Report," Rev. 20